ECB12/05/2025FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. VIOL. #39152412M ISSUED :6/30/25 AND 39110976M ISSUED 4/6/24 BY BADGES #3654 /0723 NOTED :VE$6K due
ECB06/30/2025ATOI OBSERVED VERTICAL EXTENSION BEING BUILT ON TOP OF ROOF AT EXPOSURE 1 AND 2 , NEW STRUCTURE BUILT WITH HEAVY GAUGE STUDS AND MOISTURE-RESISTANT DRYWALL APPROXIMATELY 20*30 SQUARE FEET AT 60% COMPLETION. NO$3K due
DOB06/12/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB04/05/2019VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB06/01/2016V-DOB VIOLATION - ACTIVE
DOB06/10/2015VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
DOB05/30/2014VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
DOB08/15/2012V-DOB VIOLATION - ACTIVE
DOB04/02/2007V-DOB VIOLATION - ACTIVE
ECB05/21/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER ISSUED ON 06/30/2025 UNDER COMPLAINT #3A17090. OBSERVED FROM EXP 1 AND 2, A 100% COMPLETED VERTICAL EXTENSION AT ROOF LEVEL WITH NEW FINISHED SIDINHearing held — result not yet published$10K proposed
ECB04/06/2024FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. NOTE METAL FENCE ON ROOF LEVEL HAS DETACHED AT THE RIGHT CORNER AND WAS SECURED BY FDNY WITH ROPES., REPAIR AND/REPLACENothing owed — awaiting certificate of correction