Miscellaneous one family
1354 EAST 3 STREET
BROOKLYN · BIN 3171581
💬 Discuss this project
1920Year Built
2Stories
A9Building Class
R5Zoning
1,727 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Miscellaneous one family · 3,378 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 2 filings · 20 docs
Floor 2Under Construction37p · 3 filings · 20 docs
Floor 1Under Construction36p · 3 filings · 20 docs
CellarUnder Construction37p · 3 filings · 20 docs
1 job · most recent 06/01/2026
FiledStatusContractorScope
06/01/2026Permit IssuedM&D FIRE SPRINKLER INC—
1 job · most recent 05/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/11/2026Permit IssuedROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
2 jobs · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026Permit IssuedCATIZONE ELECTRICAL INC—
09/29/2025Permit IssuedSEGA ELECTRIC LLCGeneral Wiring
1 job · most recent 05/11/2026
Steel
FiledStatusContractorScope
05/11/2026Permit IssuedBROOKLYN CONTRACTOR INCSteel
1 job · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedLONG ISLAND POWER SOLUTIO54 panels, 24.84 kw, 2,434 roof_area_sqft
1 job · most recent 05/06/2025
Fence
FiledStatusContractorScope
05/06/2025Permit IssuedBROOKLYN CONTRACTOR INCFence
Building Lifecycle
All (85)Filed (9)Permit Issued (10)Violation (3)Inspection (11)Objection (22)Special Inspection (30)
09/14/2026
Permit issued — Plumbing
B83482321-S3-PL
09/11/2026
Objection resolved — Resolved
08/24/2026
Permit issued — Sprinklers
B01280668-I1-EW-SP
08/18/2026
Permit issued — Construction Fence
B01220718-I1-FN
08/14/2026
Permit issued — General Construction
B01203028-I1-GC
08/13/2026
Permit issued — Solar
B01440480-I1-SL
08/04/2026
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
B01440480-I1
06/23/2026
Objection raised — Other
06/23/2026
Objection resolved — Resolved
06/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/04/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/01/2026
Filed — Alteration
Install sprinkler system throughout the building as per plans submitted.
B01280668-I1
05/21/2026
Objection raised — Energy
05/21/2026
Objection resolved — Addressed
05/11/2026
Filed — Alteration
MECHANICAL SYSTEMS IN CONJUCTION WITH TWO STORY AND ATTIC HORIZONTAL ENLARGEMENT
B01203028-P2
05/05/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMED MAHMOUD
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
05/05/2026
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
04/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2026
Permit issued — Plumbing
B01203028-S3-PL
04/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/06/2026
Permit issued — Structural
B01203028-S2-ST
01/27/2026
Objection resolved — Addressed
01/27/2026
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
01/27/2026
Special inspection requirement — Structural Steel - Welding
MOHAMED MAHMOUD
01/07/2026
Objection resolved — Addressed
01/06/2026
Objection raised — Other
12/31/2025
Violation issued (ECB, closed)
Unknown
12/31/2025
Violation issued (ECB, open)
Construction
12/31/2025
Violation issued (ECB, open)
Unknown
12/29/2025
Filed — Alteration
MECHANICAL SYSTEMS IN CONJUCTION WITH TWO STORY AND ATTIC HORIZONTAL ENLARGEMENT
B01203028-S3
12/22/2025
Filed — Alteration
MECHANICAL SYSTEMS IN CONJUCTION WITH TWO STORY AND ATTIC HORIZONTAL ENLARGEMENT
B01203028-P1
12/22/2025
Objection raised — Other
12/22/2025
Objection raised — Other
12/22/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Masonry
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Final
Feng Zhang
12/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Concrete - Cast-In-Place
MOHAMED MAHMOUD
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/11/2025
Permit issued — Foundation
B01203028-S1-FO
12/02/2025
Filed — Alteration
MECHANICAL SYSTEMS IN CONJUCTION WITH TWO STORY AND ATTIC HORIZONTAL ENLARGEMENT
B01203028-S2
12/01/2025
Filed — Alteration
MECHANICAL SYSTEMS IN CONJUCTION WITH TWO STORY AND ATTIC HORIZONTAL ENLARGEMENT
B01203028-S1
12/01/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
12/01/2025
Special inspection requirement — Concrete - Cast-In-Place
MOHAMED MAHMOUD
Latest 60 of 85 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN CONTRACTOR303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2025$1.4M—— → —$840/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LANCIERS ASSOCIATES1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKLYN CONTRACTOR INCGeneral Contractor608/20/2026
M&D FIRE SPRINKLER INCFire Protection108/25/2026
LONG ISLAND POWER SOLUTIOGeneral Contractor108/14/2026
24 SEVEN PLUMBING INCPlumbing109/15/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854108/04/2026
MSM ENGINEERING SERVICES,8449706/01/2026
AA BUILDING & INSPECTION1519212/22/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit Issued24 SEVEN PLUMBING INC09/14/2026
DOB NOWSprinklersPermit IssuedM&D FIRE SPRINKLER INC08/24/2026
DOB NOWConstruction FencePermit IssuedBROOKLYN CONTRACTOR INC08/18/2026
DOB NOWGeneral ConstructionPermit IssuedBROOKLYN CONTRACTOR INC08/14/2026
DOB NOWSolarPermit IssuedLONG ISLAND POWER SOLUTIO08/13/2026
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC04/14/2026
DOB NOWStructuralPermit IssuedBROOKLYN CONTRACTOR INC03/06/2026
DOB NOWFoundationPermit IssuedBROOKLYN CONTRACTOR INC12/11/2025
DOB NOWGeneral ConstructionPermit IssuedBROOKLYN CONTRACTOR INC11/26/2025
DOB NOWConstruction FencePermit IssuedBROOKLYN CONTRACTOR INC08/25/2025
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/04/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
09/25/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/05/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMED MAHMOUDspecial
05/05/2026HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
05/05/2026HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
05/05/2026Maintenance informationMOHAMED MAHMOUDenergy_progress
05/05/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
05/05/2026HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
01/27/2026Post-installed AnchorsMOHAMED MAHMOUDspecial
01/27/2026Structural Steel - WeldingMOHAMED MAHMOUDspecial
12/22/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
12/22/2025MasonryMOHAMED MAHMOUDspecial
12/22/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
12/22/2025Subgrade InspectionsYounes Abouyaalaspecial
12/22/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
12/22/2025FinalFeng Zhangprogress
12/22/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
12/22/2025Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
12/22/2025Fenestration areasMOHAMED MAHMOUDenergy_progress
12/22/2025Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
12/22/2025Fenestration air leakageMOHAMED MAHMOUDenergy_progress
12/22/2025Concrete - Cast-In-PlaceMOHAMED MAHMOUDspecial
12/22/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/01/2025Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
12/01/2025Concrete - Cast-In-PlaceMOHAMED MAHMOUDspecial
11/25/2025Structural Steel - DetailsMOHAMED MAHMOUDspecial
11/25/2025Structural Cold-Formed SteelMOHAMED MAHMOUDspecial
Latest 25 of 31.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01220718-I1Request digital key ↗
08/19/2026B01203028-S3Request digital key ↗
08/19/2026B01203028-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01203028-I1Open ↗
08/13/2026B01203028-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01203028-I1Open ↗
08/13/2026B01203028-P1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B01203028-P1Open ↗
08/13/2026B01203028-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026B01280668-I1Open ↗
08/29/2026B01203028-S2Open ↗
08/29/2026B01203028-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/19/2026B01203028-P2Open ↗
08/19/2026B01203028-P1Open ↗
08/19/2026B01203028-S4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B01203028-S2Open ↗
08/28/2026B01203028-P1Open ↗
08/28/2026B01203028-P1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B01203028-P1Open ↗
08/13/2026B01203028-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026B01203028-S4Open ↗
08/19/2026B01203028-S3Open ↗
08/19/2026B01203028-S1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B01203028-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01203028-S1Open ↗
▸Other Documents7
▸DOB NOWPlot Diagram3
08/13/2026B01203028-P1Open ↗
08/13/2026B01203028-I1Open ↗
08/13/2026B01203028-S1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01203028-I1Open ↗
08/13/2026B01203028-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01203028-P1Open ↗
08/13/2026B01203028-I1Open ↗