← Back
Primarily 1 family with 1 store or office
1401 WEST 9 STREET
BROOKLYN · BIN 3173247
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
C4-2AZoning
1,982 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · 991 sf lot · 2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 11/29/2023
Gas
FiledStatusContractorScope
11/29/2023Signed-offAURORA P & H CONT INCGas
2 jobs · most recent 11/29/2023
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/29/2023Signed-offAURORA P & H CONT INCTenant Protection Plan 72 Hour
11/29/2023Signed-offAURORA P & H CONT INCTenant Protection Plan 72 Hour
Building Lifecycle
All (17)Filed (2)Permit Issued (2)Violation (1)Inspection (3)Special Inspection (9)
04/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/18/2023
Permit issued — Plumbing
B00965062-I1-PL
12/18/2023
Permit issued — Boiler Equipment
B00965059-I1-BE
11/29/2023
Filed — Alteration
REPLACE GAS LINE FROM METER TO 2ND FLOOR AND CONNECT TO BOILER AND GAS STOVE. BOILER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00965062-I1
11/29/2023
Filed — Alteration
REPLACE AND RELOCATE BOILER FROM CELLAR TO 2ND FLOOR APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00965059-I1
11/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
11/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
11/29/2023
Special inspection requirement — Maintenance information
Gregory Perotto
11/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
11/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
11/19/2023
Special inspection requirement — Heating Systems
Gregory Perotto
11/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
11/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
11/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.211/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AURORA P & H CONT INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947211/29/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAURORA P & H CONT INC12/18/2023
DOB NOWBoiler EquipmentSigned-offAURORA P & H CONT INC12/18/2023
BISOTISSUEDMILES GLASS & METAL SIGN12/17/2018
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/29/2023HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
11/29/2023HVAC-R and service water heating system controlsGregory Perottoenergy_progress
11/29/2023Maintenance informationGregory Perottoenergy_progress
11/29/2023HVAC-R and service water heating equipmentGregory Perottoenergy_progress
11/19/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
11/19/2023Heating SystemsGregory Perottospecial
11/19/2023Tenant Protection Plan ComplianceGregory Perottospecial
11/19/2023Tenant Protection Plan ComplianceGregory Perottospecial
11/19/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00965059-I1Request digital key ↗
08/26/2026B00965062-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
12/19/2018322052595Open ↗
12/11/2018322052595Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/11/2018322052595Open ↗
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature5
08/22/2026B00965062-I1Open ↗
08/22/2026B00965059-I1Open ↗
08/22/2026B00965062-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/22/2026B00965059-I1Open ↗
08/22/2026B00965059-I1Open ↗
08/22/2026B00965059-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00965059-I1Open ↗
08/26/2026B00965062-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/11/2018322052595Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/11/2018322052595Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00965059-I1Open ↗
08/26/2026B00965062-I1Open ↗
▸Inspections & Test Reports1
▸BISDOB FINAL INSPECTION REQUIRED1
02/11/2022322052595Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
02/11/2022322052595Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/11/2018322052595Open ↗