← Back
One family attached or semi-detached
1543 EAST 3 STREET
BROOKLYN · BIN 3173691
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R5Zoning
1,408 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One family attached or semi-detached · Owner of record: 1543 E3 LLC · 2,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1543 E3 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/19/2016$1.1M—— → —$817/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC407/20/2026
DIAGRID CONSULTANTS305/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER103/21/2026
Building Lifecycle
All (90)Filed (7)Violation (2)Objection (51)Special Inspection (30)
07/20/2026
Filed — Alteration
Fence application filed in conjunction to gc alt2
B01322711-S6
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/13/2026
Objection raised — Cost
07/13/2026
Objection raised — Energy
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/24/2026
Filed — Alteration
Fence application filed in conjunction to gc alt2
B01322711-S7
06/22/2026
Objection raised — Scope
06/22/2026
Objection raised — Scope
06/11/2026
Objection resolved — Addressed
06/09/2026
Objection raised — Scope
06/09/2026
Objection raised — Structural
06/09/2026
Objection raised — Scope
06/09/2026
Objection raised — Other
06/09/2026
Objection raised — Scope
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Special inspection requirement — Sprinkler Systems
05/29/2026
Objection raised — Other
05/26/2026
Filed — Alteration
Fence application filed in conjunction to gc alt2
B01322711-S3
05/26/2026
Filed — Alteration
Fence application filed in conjunction to gc alt2
B01322711-S4
05/20/2026
Filed — Alteration
Fence application filed in conjunction to gc alt2
B01322711-S5
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/19/2026
Special inspection requirement — Footing and Foundation
05/19/2026
Special inspection requirement — Subgrade Inspections
05/19/2026
Special inspection requirement — Concrete - Cast-In-Place
05/19/2026
Special inspection requirement — Structural Cold-Formed Steel
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/19/2026
Special inspection requirement — Structural Steel - Details
05/19/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/19/2026
Special inspection requirement — Structural Steel - Welding
05/19/2026
Special inspection requirement — Final
05/19/2026
Special inspection requirement — Concrete - Cast-In-Place
05/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/19/2026
Special inspection requirement — Subgrade Inspections
05/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/19/2026
Special inspection requirement — Final
05/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/19/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/26/2026
Objection raised — Zoning
03/26/2026
Objection raised — Energy
03/26/2026
Objection raised — Zoning
03/26/2026
Objection raised — Zoning
03/26/2026
Objection raised — Zoning
03/26/2026
Objection raised — Zoning
03/24/2026
Objection raised — Zoning
03/24/2026
Objection raised — Zoning
Latest 60 of 90 events.
Nothing on file for this building.
1 project · most recent 07/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/20/2026——Gas, Storm, Water/Sanitary
1 project · most recent 07/20/2026
Steel Concrete
FiledStatusContractorScope
07/20/2026——Steel, Concrete
1 project · most recent 07/20/2026
Fence
FiledStatusContractorScope
07/20/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
07/20/2026Fire-Resistant Penetrations and Joints—special
06/04/2026Sprinkler Systems—special
05/20/2026Structural Stability – Alterations of existing buildings—special
05/19/2026Footing and Foundation—progress
05/19/2026Subgrade Inspections—special
05/19/2026Concrete - Cast-In-Place—special
05/19/2026Structural Cold-Formed Steel—special
05/19/2026Structural Stability – Alterations of existing buildings—special
05/19/2026Structural Steel - Details—special
05/19/2026Structural Steel - High Strength Bolting—special
05/19/2026Structural Steel - Welding—special
05/19/2026Final—progress
05/19/2026Concrete - Cast-In-Place—special
05/19/2026Structural Stability – Alterations of existing buildings—special
05/19/2026Subgrade Inspections—special
05/19/2026Subsurface Investigations (Borings/Test Pits)—special
05/19/2026Final—progress
05/19/2026Subsurface Investigations (Borings/Test Pits)—special
05/19/2026Excavations - Sheeting, Shoring, and Bracing—special
11/24/2025Fire-Resistant Penetrations and Joints—special
11/24/2025Fenestration and door U-factor and product ratings—energy_progress
11/24/2025Metering—energy_progress
11/24/2025Air barrier - visual inspection—energy_progress
11/24/2025Insulation placement and R values—energy_progress
11/24/2025Permanent certificate—energy_progress
Latest 25 of 32.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/16/2026B01322711-S6Request digital key ↗
08/16/2026B01322711-S1Request digital key ↗
08/16/2026B01322711-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01322711-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026B01322711-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026B01322711-S5Open ↗
08/16/2026B01322711-S4Open ↗
08/16/2026B01322711-S3Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/16/2026B01322711-S6Open ↗
08/15/2026B01322711-S5Open ↗
08/15/2026B01322711-S3Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports6
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/15/2026B01322711-S5Open ↗
08/14/2026B01322711-S4Open ↗
▸DOB NOWSOIL REPORT2
08/15/2026B01322711-S5Open ↗
08/14/2026B01322711-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026B01322711-S5Open ↗
08/14/2026B01322711-S4Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram3
08/16/2026B01322711-I1Open ↗
08/15/2026B01322711-S5Open ↗
08/14/2026B01322711-S4Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026B01322711-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026B01322711-I1Open ↗