← Back
Two family converted from one family
1572 EAST 7 STREET
BROOKLYN · BIN 3173832
💬 Discuss this project
1925Year Built
3Stories
B3Building Class
R5Zoning
2,600 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family converted from one family · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 04/03/2019
General Wiring
FiledStatusContractorScope
04/03/2019CompleteACCURATE ELEC'L CORP.General Wiring
Building Lifecycle
All (42)Filed (3)Permit Issued (2)Signed Off (2)Violation (28)Inspection (1)Objection (6)
06/20/2024
Violation issued (ECB, open)
Construction
02/09/2022
Signed off — Alteration
B00113582-I1
11/29/2021
Signed off — Alteration
ENLARGE EXISTING CURB CUT.
B00378741-I1
11/26/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/26/2021
Permit issued — Curb Cut
B00378741-I1-CC
12/07/2020
Filed — Alteration
ENLARGE EXISTING CURB CUT.
B00378741-P1
08/11/2020
Objection resolved — Addressed
08/11/2020
Objection resolved — Addressed
08/11/2020
Objection resolved — Addressed
08/03/2020
Objection raised — Scope
08/03/2020
Objection raised — Zoning
08/03/2020
Objection raised — Structural
07/30/2020
Filed — Alteration
ENLARGE EXISTING CURB CUT.
B00378741-I1
07/21/2020
Violation issued (ECB, closed)
Construction
07/21/2020
Violation issued (ECB, closed)
Construction
12/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2019
Violation issued (ECB, closed)
Construction
11/07/2019
Violation issued (ECB, closed)
Construction
10/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/26/2019
Violation issued (ECB, closed)
Construction
08/13/2019
Violation issued (ECB, closed)
Construction
08/13/2019
Violation issued (ECB, closed)
Construction
07/16/2019
Violation issued (ECB, closed)
Construction
07/16/2019
Violation issued (ECB, closed)
Construction
07/16/2019
Violation issued (ECB, closed)
Construction
07/16/2019
Violation issued (ECB, closed)
Construction
06/26/2019
Permit issued — Construction Fence
B00113582-I1-FN
05/21/2019
Violation issued (ECB, closed)
Construction
05/20/2019
Violation issued (ECB, closed)
Construction
05/16/2019
Violation issued (ECB, closed)
Construction
03/14/2019
Violation issued (ECB, closed)
Construction
02/15/2019
Violation issued (ECB, closed)
Construction
01/03/2019
Violation issued (ECB, closed)
Construction
12/26/2018
Filed — Alteration
B00113582-I1
11/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/29/2018
Violation issued (ECB, closed)
Construction
09/29/2018
Violation issued (ECB, closed)
Construction
08/24/2018
Violation issued (ECB, closed)
Construction
08/24/2018
Violation issued (ECB, closed)
Construction
08/15/2018
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EUROPEAN BUILDERS & CONST803/22/2026
BH GENERAL CONTRACTING IN203/22/2026
LLC CORP 3521 DEKALB303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2013$750K—— → —$288/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ACV DESIGN LTD212/07/2020
EDIFICE DRAFTING AND SERVICES112/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACDE GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BENJAMIN DREBINElectrical303/21/2026
ACCURATE ELECL CORP 002950General Contractor303/22/2026
BH GENERAL CONTRACTING INGeneral Contractor203/22/2026
GREGG NY PLUMBING, INCPlumbing203/22/2026
KHALIDA SHOUKATGeneral Contractor107/08/2026
SALUTE CONTRACTING CORPGeneral Contractor107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSALUTE CONTRACTING CORP05/26/2021
DOB NOWConstruction FenceSigned-offKHALIDA SHOUKAT06/26/2019
BISPLISSUEDGREGG NY PLUMBING, INC12/21/2020
BIS—ISSUEDBH GENERAL CONTRACTING IN12/06/2019
BISPLISSUEDGREGG NY PLUMBING, INC11/01/2019
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/26/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Curb Cut2
09/02/2026B00378741-P1Request digital key ↗
08/14/2026B00378741-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00113582-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION11
11/12/2021321846696Open ↗
11/05/2021321846696Open ↗
10/28/2021321846696Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
01/06/2020321846696Open ↗
06/20/2019321846696Open ↗
06/20/2019321846696Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
12/09/2019321846696Open ↗
11/04/2019321846696Open ↗
05/28/2019321846696Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/09/2021321846696Open ↗
11/08/2021321846696Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
11/18/2019321846696Open ↗
01/10/2019321846696Open ↗
▸BISVERIFY TAX LOT1
10/26/2021321846696Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/30/2021321846696Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/19/2018321846696Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
11/19/2018321846696Open ↗
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/20/2019321846696Open ↗
11/19/2018321846696Open ↗
11/19/2018321846696Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026B00113582-I1Open ↗
08/13/2026B00378741-I1Open ↗
08/13/2026B00378741-P1Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
02/10/2021321846696Open ↗
12/16/2020321846696Open ↗
09/09/2020321846696Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/24/2020321846696Open ↗
05/14/2019321846696Open ↗
09/24/2018321846696Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/11/2022321846696Open ↗
▸BISHEATING SYSTEMS1
12/14/2022321846696Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
11/16/2018321846696Open ↗
10/25/2018321846696Open ↗
09/24/2018321846696Open ↗
▸BISSTREET TREE CHECKLIST1
12/20/2023321846696Open ↗
▸BISSTREET TREE SIGNOFF1
12/19/2023321846696Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
12/14/2022321846696Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/20/2019321846696Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/16/2018321846696Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/20/2019321846696Open ↗
11/16/2018321846696Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/14/2022321846696Open ↗
08/12/2020321846696Open ↗
▸BISFENESTRATION AREAS1
12/14/2022321846696Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/14/2022321846696Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/14/2022321846696Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/14/2022321846696Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/14/2022321846696Open ↗
▸BISLIGHTING CONTROLS1
12/14/2022321846696Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
12/14/2022321846696Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/14/2022321846696Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/14/2022321846696Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/14/2022321846696Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/14/2022321846696Open ↗
12/14/2022321846696Open ↗
08/12/2020321846696Open ↗
▸BISMASONRY1
12/14/2022321846696Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/14/2022321846696Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/14/2022321846696Open ↗
▸BISVERTICAL MASONRY FOUNDATION ELEMENTS/PIERS1
12/14/2022321846696Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
11/23/2018321846696Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/14/2022321846696Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/14/2022321846696Open ↗
▸BISSOIL REPORT1
11/19/2018321846696Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
12/14/2022321846696Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/14/2022321846696Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/14/2022321846696Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/14/2022321846696Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/14/2022321846696Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/14/2022321846696Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE2
11/12/2021321846696Open ↗
09/24/2018321846696Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/08/2021321846696Open ↗
12/08/2021321846696Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
11/19/2018321846696Open ↗
09/24/2018321846696Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/19/2022321846696Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION15
12/13/2023321846696Open ↗
12/08/2021321846696Open ↗
10/28/2021321846696Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET1
09/24/2018321846696Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/09/2019321846696Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
12/14/2022321846696Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/14/2022321846696Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
12/14/2022321846696Open ↗