← Back
Primarily 2 family with 1 store or office
72 AVENUE O
BROOKLYN · BIN 3174205
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R5BZoning
2,560 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,000 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 23p · 2 filings · 10 docs
Floor 1
Cellar4p · 2 filings · 12 docs
1 job · most recent 05/19/2021
General Wiring
FiledStatusContractorScope
05/19/2021CompleteKJK ELECTRIC INCGeneral Wiring
Building Lifecycle
All (84)Filed (8)Permit Issued (4)Signed Off (4)Violation (60)Inspection (5)Special Inspection (3)
11/24/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267670-I1
11/12/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267667-I1
11/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hugues Paul
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Hugues Paul
11/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hugues Paul
10/31/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267667-P1
10/31/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267670-P1
10/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2025
Permit issued — General Construction
B01267667-I1-GC
08/19/2025
Permit issued — Plumbing
B01267670-I1-PL
08/15/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267670-I1
08/15/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING SECOND FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01267667-I1
11/28/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/19/2022
Violation issued (ECB, closed)
Construction
02/09/2022
Violation issued (HPD, closed)
C
02/08/2022
Violation issued (HPD, closed)
B
02/08/2022
Violation issued (HPD, closed)
B
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
02/02/2022
Violation issued (HPD, closed)
C
01/12/2022
Violation issued (HPD, closed)
C
06/17/2021
Signed off — Alteration
RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00441350-I1
06/17/2021
Signed off — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00441352-I1
05/20/2021
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00441352-P1
05/20/2021
Filed — Alteration
RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00441350-P1
12/24/2020
Permit issued — Plumbing
B00441350-I1-PL
12/24/2020
Permit issued — Boiler Equipment
B00441352-I1-BE
12/21/2020
Filed — Alteration
RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00441350-I1
12/21/2020
Filed — Alteration
INSTALL (3) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00441352-I1
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
A
03/10/2020
Violation issued (HPD, closed)
A
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
A
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
C
03/10/2020
Violation issued (HPD, closed)
C
03/10/2020
Violation issued (HPD, closed)
C
Latest 60 of 84 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2015$950K—Y & L REALTY INC. → Private party$371/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL ENGR. INSP. (PEI) CONSULTANTS410/31/2025
BILLAH ENGINEERING PLLC405/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing307/08/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL ENGINEERING INSPECTI4672210/31/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC08/19/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC08/19/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC12/24/2020
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC12/24/2020
BISOTISSUEDSPLEN CONSTRUCTION INC04/06/2021
BISOTISSUEDYILIN CONSTRUCTION INC12/22/2020
BISOTISSUEDSEICKEL & SONS PLBG INC12/19/2007
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/03/2025Fire-Resistant Penetrations and JointsHugues Paulspecial
11/03/2025Energy Code Compliance InspectionsHugues Paulprogress
11/03/2025Fire-Resistance Rated ConstructionHugues Paulprogress
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
08/21/2026B01267670-I1Request digital key ↗
08/21/2026B01267670-P1Request digital key ↗
08/21/2026B01267667-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00441352-I1Request digital key ↗
08/15/2026B00441352-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00441350-I1Request digital key ↗
08/15/2026B00441350-P1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION7
06/14/2021340797070Open ↗
06/07/2021340797070Open ↗
06/01/2021340797070Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION4
04/07/2021340797070Open ↗
12/22/2020340797070Open ↗
12/19/2007310038651Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01267667-I1Open ↗
08/21/2026B01267667-P1Open ↗
08/13/2026B00441350-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPC FULL REPORT1
10/26/2007310038651Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/16/2020340797070Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/26/2007310038651Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/16/2020340797070Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/26/2007310038651Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/26/2007310038651Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/16/2020340797070Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01267667-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01267667-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/26/2007310038651Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B00441352-P1Open ↗
08/13/2026B00441350-P1Open ↗
08/13/2026B00441352-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/26/2007310038651Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/16/2020340797070Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/18/2021340797070Open ↗
12/22/2020340797070Open ↗
12/16/2020340797070Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/18/2021340797070Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/16/2020340797070Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/18/2021340797070Open ↗
12/22/2020340797070Open ↗
12/16/2020340797070Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
10/26/2007310038651Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/26/2007310038651Open ↗
▸BISSUPERSEDING LETTER1
04/07/2021340797070Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/21/2021340797070Open ↗
06/18/2021340797070Open ↗
12/16/2020340797070Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
06/21/2021340797070Open ↗
06/14/2021340797070Open ↗
06/01/2021340797070Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
04/07/2021340797070Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/16/2020340797070Open ↗