← Back
Two family converted from one family
1520 WEST 6 STREET
BROOKLYN · BIN 3174341
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R4-1Zoning
2,144 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 6 docs
Floor 1Under Construction4p · 1 filing · 6 docs
CellarUnder Construction4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGER WILLIAMS, PE105/12/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.N.C. CONTRACTING CO.,INGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERS, P.C.1442105/12/2026
Building Lifecycle
All (5)Filed (1)Permit Issued (1)Special Inspection (3)
06/12/2026
Permit issued — General Construction
B01393721-I1-GC
05/12/2026
Filed — Alteration
REMOVE 2ND STORY ON EXISTING GARAGE,RESTORE GARAGE TO LEGAL CONDITIONS,SHOW ROOF DECK AT 2ND FLOOR,SHOW ORDINARY USE IN CELLAR,WORK INCLUDE FRAME WALL REMOVAL AND INSTALLATION. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
B01393721-I1
05/12/2026
Special inspection requirement — Final
Roger Williams
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shamsul Siddique
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shamsul Siddique
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA.N.C. CONTRACTING CO.,IN06/12/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/12/2026FinalRoger Williamsprogress
04/28/2026Fire-Resistant Penetrations and JointsShamsul Siddiquespecial
04/28/2026Structural Stability – Alterations of existing buildingsShamsul Siddiquespecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026B01393721-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01393721-I1Open ↗
09/01/2026B01393721-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026B01393721-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B01393721-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01393721-I1Open ↗