← Back
One family attached or semi-detached
1655 EAST 9 STREET
BROOKLYN · BIN 3176279
💬 Discuss this project
1930Year Built
2Stories
A5Building Class
R5Zoning
1,400 sfGross Floor Area
1Units
5 Open Violations 1 unresolved · 4 paperwork only ▸FDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 225p · 1 filing · 20 docs
Floor 126p · 1 filing · 20 docs
Cellar35p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LATI PROPERTIES2704/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC803/05/2026
JIAN ENGINEERING PLLC204/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor504/09/2026
TIMOTHY COLEMAN LICENSEDElectrical103/22/2026
FLOW-RIGHT PLBG & HTG CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397703/05/2026
Building Lifecycle
All (133)Filed (10)Permit Issued (4)Violation (6)Inspection (5)Objection (78)Special Inspection (30)
08/28/2026
Objection resolved — Resolved
04/01/2026
Special inspection requirement — Fenestration air leakage
JIAN DENG
04/01/2026
Special inspection requirement — Permanent certificate
JIAN DENG
04/01/2026
Special inspection requirement — Fenestration areas
JIAN DENG
04/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
04/01/2026
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
04/01/2026
Special inspection requirement — Insulation placement and R values
JIAN DENG
04/01/2026
Special inspection requirement — Interior lighting power
JIAN DENG
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
04/01/2026
Special inspection requirement — Masonry
JIAN DENG
04/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
04/01/2026
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
04/01/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JIAN DENG
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
04/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
03/24/2026
Objection resolved — Addressed
03/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Scope
03/05/2026
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 001 TO 002, ROOF IN CONJUNCTION WITH DOB ALTERATION CO JOB #: B01172467-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01172467-P3
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
02/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/06/2026
Objection resolved — Addressed
01/08/2026
Objection raised — Scope
11/13/2025
Objection raised — Scope
11/13/2025
Objection resolved — Addressed
10/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 001 TO 002, ROOF IN CONJUNCTION WITH DOB ALTERATION CO JOB #: B01172467-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01172467-P2
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
10/10/2025
Objection resolved — Addressed
10/10/2025
Objection resolved — Addressed
10/10/2025
Objection resolved — Addressed
10/10/2025
Objection resolved — Addressed
10/10/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Structural
10/09/2025
Objection raised — Zoning
10/09/2025
Objection raised — Scope
10/09/2025
Objection raised — Scope
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Structural
10/09/2025
Objection raised — Scope
10/09/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Scope
09/23/2025
Objection raised — Scope
09/23/2025
Objection resolved — Addressed
09/10/2025
Permit issued — Plumbing
B01172467-S2-PL
09/06/2025
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 001 TO 002, ROOF IN CONJUNCTION WITH DOB ALTERATION CO JOB #: B01172467-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01172467-P1
09/02/2025
Permit issued — General Construction
B01172467-I1-GC
07/30/2025
Objection raised — Structural
07/30/2025
Objection resolved — Addressed
07/25/2025
Objection raised — Scope
07/25/2025
Objection resolved — Addressed
07/14/2025
Objection resolved — Addressed
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR09/10/2025
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC09/02/2025
DOB NOWFoundationPermit IssuedACER CONSTRUCTION INC06/27/2025
DOB NOWCurb CutPermit IssuedACER CONSTRUCTION INC05/16/2025
BISOTISSUEDN/A02/15/2002
1 project · most recent 03/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/05/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORGas, Water/Sanitary
1 project · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
1 project · most recent 03/05/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
03/05/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/20/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
04/01/2026Fenestration air leakageJIAN DENGenergy_progress
04/01/2026Permanent certificateJIAN DENGenergy_progress
04/01/2026Fenestration areasJIAN DENGenergy_progress
04/01/2026Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
04/01/2026Air barrier - visual inspectionJIAN DENGenergy_progress
04/01/2026Insulation placement and R valuesJIAN DENGenergy_progress
04/01/2026Interior lighting powerJIAN DENGenergy_progress
04/01/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
04/01/2026MasonryJIAN DENGspecial
04/01/2026Structural Stability – Alterations of existing buildingsJIAN DENGspecial
04/01/2026Concrete - Cast-In-PlaceJIAN DENGspecial
04/01/2026Exterior Insulation and Finish Systems (EIFS)JIAN DENGspecial
04/01/2026Energy Code Compliance InspectionsJIAN DENGprogress
04/01/2026Fire-Resistance Rated ConstructionJIAN DENGprogress
03/02/2026Energy Code Compliance InspectionsJIAN DENGprogress
03/02/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
10/24/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
10/24/2025Energy Code Compliance InspectionsJIAN DENGprogress
04/10/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/10/2025Subgrade InspectionsJIAN DENGspecial
04/10/2025Concrete - Cast-In-PlaceJIAN DENGspecial
04/10/2025Footing and FoundationJIAN DENGprogress
04/10/2025Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
04/10/2025FinalJIAN DENGprogress
04/10/2025Structural Stability – Alterations of existing buildings—special
Latest 25 of 33.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01164584-P1Request digital key ↗
08/21/2026B01172467-S2Request digital key ↗
08/21/2026B01172467-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/14/2026B01172467-I1Open ↗
08/13/2026B01172467-P1Open ↗
08/13/2026B01172467-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B01172467-P1Open ↗
08/14/2026B01172467-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026B01164584-P1Open ↗
08/21/2026B01172467-P3Open ↗
08/21/2026B01172467-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01172467-S3Open ↗
09/01/2026B01172467-S3Open ↗
08/24/2026B01172467-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01172467-S3Open ↗
08/24/2026B01172467-P3Open ↗
08/23/2026B01172467-P2Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/14/2026B01172467-I1Open ↗
08/13/2026B01172467-P1Open ↗
08/13/2026B01172467-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026B01164584-P1Open ↗
08/21/2026B01172467-S2Open ↗
08/21/2026B01172467-P2Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B01172467-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01172467-S3Open ↗
▸Other Documents7
▸DOB NOWPlot Diagram3
08/13/2026B01172467-P1Open ↗
08/13/2026B01172467-S3Open ↗
08/13/2026B01172467-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01172467-P1Open ↗
08/13/2026B01172467-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01172467-I1Open ↗
08/13/2026B01172467-P1Open ↗