← Back
Primarily 2 family with 1 store or office
226 KINGS HIGHWAY
BROOKLYN · BIN 3176588
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R7AZoning
3,540 sfGross Floor Area
3Units
8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,140 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 20 docs
Nothing on file for this building.
Building Lifecycle
All (41)Filed (3)Permit Issued (2)Signed Off (2)Violation (15)Inspection (5)Special Inspection (14)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/10/2025
Signed off — Alteration
PLUMBING WORK AS PER PLAN FILED HEREWITH TO INSTALLING THE PLUMBING FIXTURE OF THE EXISTING 1ST FLOOR IN CONJUNCTION WITH JOB B01128207-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01128207-I1
03/06/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2025
Signed off — Alteration
PLUMBING WORK AS PER PLAN FILED HEREWITH TO INSTALLING THE PLUMBING FIXTURE OF THE EXISTING 1ST FLOOR IN CONJUNCTION WITH JOB B01128207-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01128207-S1
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
02/24/2025
Special inspection requirement — Mechanical Systems
JAN PEREZ
02/24/2025
Special inspection requirement — Final
JAN PEREZ
02/24/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
02/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JAN PEREZ
02/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
JAN PEREZ
02/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
JAN PEREZ
02/21/2025
Filed — Alteration
PLUMBING WORK AS PER PLAN FILED HEREWITH TO INSTALLING THE PLUMBING FIXTURE OF THE EXISTING 1ST FLOOR IN CONJUNCTION WITH JOB B01128207-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01128207-P1
02/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/21/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
02/21/2025
Special inspection requirement — Mechanical Systems
JAN PEREZ
02/21/2025
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
02/21/2025
Special inspection requirement — Final
JAN PEREZ
02/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JAN PEREZ
02/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
JAN PEREZ
02/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
JAN PEREZ
02/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/23/2024
Permit issued — Plumbing
B01128207-S1-PL
10/23/2024
Permit issued — Mechanical Systems
B01128207-I1-GC-CX
10/21/2024
Filed — Alteration
PLUMBING WORK AS PER PLAN FILED HEREWITH TO INSTALLING THE PLUMBING FIXTURE OF THE EXISTING 1ST FLOOR IN CONJUNCTION WITH JOB B01128207-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01128207-S1
10/18/2024
Filed — Alteration
PLUMBING WORK AS PER PLAN FILED HEREWITH TO INSTALLING THE PLUMBING FIXTURE OF THE EXISTING 1ST FLOOR IN CONJUNCTION WITH JOB B01128207-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01128207-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2022
Violation issued (ECB, closed)
Boilers
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2013
Violation issued (ECB, closed)
Boilers
09/29/2009
Violation issued (ECB, closed)
Boilers
10/18/2006
Violation issued (ECB, closed)
Boilers
12/10/2004
Violation issued (ECB, closed)
Boilers
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC CONSULTING ENGINEERS302/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083302/21/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG10/23/2024
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN10/23/2024
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/24/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
02/24/2025Mechanical SystemsJAN PEREZspecial
02/24/2025FinalJAN PEREZprogress
02/24/2025Energy Code Compliance InspectionsJAN PEREZprogress
02/24/2025HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
02/24/2025HVAC-R and service water heating system controlsJAN PEREZenergy_progress
02/24/2025HVAC-R and service water heating equipmentJAN PEREZenergy_progress
02/21/2025Fire-Resistant Penetrations and JointsJAN PEREZspecial
02/21/2025Mechanical SystemsJAN PEREZspecial
02/21/2025Energy Code Compliance InspectionsJAN PEREZprogress
02/21/2025FinalJAN PEREZprogress
02/21/2025HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
02/21/2025HVAC-R and service water heating system controlsJAN PEREZenergy_progress
02/21/2025HVAC-R and service water heating equipmentJAN PEREZenergy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026B01128207-I1Request digital key ↗
08/23/2026B01128207-S1Request digital key ↗
08/23/2026B01128207-P1Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
09/21/2009320007513Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/09/2009320007513Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B01128207-I1Open ↗
09/01/2026B01128207-I1Open ↗
09/01/2026B01128207-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01128207-I1Open ↗
09/01/2026B01128207-I1Open ↗
08/31/2026B01128207-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026B01128207-P1Open ↗
08/23/2026B01128207-I1Open ↗
08/23/2026B01128207-S1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/10/2009320007513Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
10/23/2009320007513Open ↗
10/23/2009320007513Open ↗
▸BISSCHEDULE B - PLUMBING1
04/09/2009320007513Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
10/23/2009320007513Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026B01128207-P1Open ↗
08/23/2026B01128207-I1Open ↗
08/23/2026B01128207-S1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/09/2009320007513Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
04/09/2009320007513Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/09/2009320007513Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/09/2009320007513Open ↗