← Back
Two stories - detached, small or mid-size
1856 EAST 8 STREET
BROOKLYN · BIN 3178740
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R5Zoning
1,660 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,495 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction6p · 1 filing · 5 docs
Floor 2Under Construction28p · 2 filings · 20 docs
Floor 1Under Construction26p · 2 filings · 20 docs
CellarUnder Construction30p · 3 filings · 20 docs
1 job · most recent 05/27/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/27/2026Permit IssuedEXPERT PLUMBING & HEATINGGas, Storm, Water/Sanitary
3 jobs · most recent 04/15/2026
General Wiring
FiledStatusContractorScope
04/15/2026Permit IssuedFORSURE ELECTRIC NY INC1 meters
03/16/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
12/17/2025Permit IssuedFORSURE ELECTRIC NY INCGeneral Wiring
1 job · most recent 09/12/2025
FiledStatusContractorScope
09/12/2025Permit IssuedHABONEH CONSTRUCTION INC4 scope_items
1 job · most recent 05/27/2026
Fence
FiledStatusContractorScope
05/27/2026Permit IssuedHABONEH CONSTRUCTION INCFence
Building Lifecycle
All (99)Filed (8)Permit Issued (8)Violation (3)Inspection (2)Objection (48)Special Inspection (30)
09/28/2026
Permit issued — General Construction
B01186201-I1-GC
07/29/2026
Permit issued — General Construction
B01186201-I1-GC
07/15/2026
Permit issued — Construction Fence
B01186201-S2-FN
06/26/2026
Objection resolved — Resolved
06/22/2026
Objection raised — Other
05/27/2026
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B01186201-I1
B01186201-P2
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
05/12/2026
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
05/12/2026
Special inspection requirement — Permanent certificate
MOHAMED MAHMOUD
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection resolved — Resolved
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/20/2026
Objection raised — Other
03/20/2026
Objection raised — Other
03/20/2026
Objection raised — Other
03/20/2026
Objection raised — Other
03/09/2026
Filed — Alteration CO
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB B01186201-I1
B01186201-P1
03/02/2026
Permit issued — Plumbing
B01186201-S3-PL
03/02/2026
Violation issued (ECB, closed)
Construction
03/02/2026
Violation issued (ECB, closed)
Construction
03/02/2026
Violation issued (ECB, open)
Unknown
01/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Lighting controls
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Protection of exposed foundation insulation
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Air barrier — testing
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Metering
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Lighting in dwelling units
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Exterior lighting power
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Masonry
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
10/06/2025
Permit issued — Structural
B01250536-I1-ST
09/19/2025
Permit issued — Foundation
B01267639-I1-FO
09/18/2025
Permit issued — General Construction
B01186201-I1-GC
09/17/2025
Special inspection requirement — Footing and Foundation
MOHAMED MAHMOUD
09/17/2025
Special inspection requirement — Final
MOHAMED MAHMOUD
09/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
09/17/2025
Special inspection requirement — Subgrade Inspections
INDARDEO PARBHUNATH
09/17/2025
Special inspection requirement — Concrete - Cast-In-Place
MOHAMED MAHMOUD
09/12/2025
Filed — Alteration
FOUNDATION FOR EXISTING (2) STORY BUILDING AND CELLAR
B01267639-P1
09/09/2025
Objection raised — Cost
09/09/2025
Objection resolved — Addressed
09/08/2025
Objection raised — Cost
09/08/2025
Objection resolved — Addressed
09/05/2025
Filed — Alteration
FOUNDATION FOR EXISTING (2) STORY BUILDING AND CELLAR
B01267639-I1
09/05/2025
Filed — Alteration
B01250536-I1
07/25/2025
Permit issued — Construction Fence
B01186201-S2-FN
06/26/2025
Objection resolved — Addressed
Latest 60 of 99 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HABONETH CONSTRUCTION INC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/18/2016$2.0M—Private party → Private party$1,220/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC505/27/2026
ROBERT SIQECA PE309/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HABONEH CONSTRUCTION INCGeneral Contractor709/29/2026
BARUCH BUILDERS CORPGeneral Contractor207/16/2026
FORSURE ELECTRIC NY INCElectrical103/22/2026
EXPERT PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449705/27/2026
IP CONCRETE TESTING AND I6252209/12/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHABONEH CONSTRUCTION INC09/28/2026
DOB NOWGeneral ConstructionPermit IssuedHABONEH CONSTRUCTION INC07/29/2026
DOB NOWConstruction FencePermit IssuedBARUCH BUILDERS CORP07/15/2026
DOB NOWPlumbingPermit IssuedEXPERT PLUMBING & HEATING03/02/2026
DOB NOWStructuralPermit IssuedHABONEH CONSTRUCTION10/06/2025
DOB NOWFoundationPermit IssuedHABONEH CONSTRUCTION09/19/2025
DOB NOWGeneral ConstructionPermit IssuedHABONEH CONSTRUCTION09/18/2025
DOB NOWConstruction FencePermit IssuedBARUCH BUILDERS CORP07/25/2025
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/02/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
05/12/2026HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
05/12/2026Maintenance informationMOHAMED MAHMOUDenergy_progress
05/12/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
05/12/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
05/12/2026HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
05/12/2026HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
05/12/2026Permanent certificateMOHAMED MAHMOUDenergy_progress
01/26/2026Electric vehicle service equipment requirementsMOHAMED MAHMOUDenergy_progress
01/26/2026Fenestration air leakageMOHAMED MAHMOUDenergy_progress
01/26/2026Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
01/26/2026Lighting controlsMOHAMED MAHMOUDenergy_progress
01/26/2026Fenestration areasMOHAMED MAHMOUDenergy_progress
01/26/2026Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
01/26/2026Protection of exposed foundation insulationMOHAMED MAHMOUDenergy_progress
01/26/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
01/26/2026Interior lighting powerMOHAMED MAHMOUDenergy_progress
01/26/2026Air barrier — testing MOHAMED MAHMOUDenergy_progress
01/26/2026MeteringMOHAMED MAHMOUDenergy_progress
01/26/2026Lighting in dwelling unitsMOHAMED MAHMOUDenergy_progress
01/26/2026Exterior lighting powerMOHAMED MAHMOUDenergy_progress
01/26/2026Maintenance informationMOHAMED MAHMOUDenergy_progress
01/26/2026MasonryMOHAMED MAHMOUDspecial
01/26/2026Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
01/26/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
01/26/2026Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
Latest 25 of 58.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026B01250536-I1Request digital key ↗
08/20/2026B01267639-P1Request digital key ↗
08/20/2026B01267639-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B01267639-P1Open ↗
08/28/2026B01186201-P1Open ↗
08/28/2026B01186201-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026B01267639-P1Open ↗
08/20/2026B01267639-I1Open ↗
08/16/2026B01186201-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B01267639-P1Open ↗
09/02/2026B01267639-P1Open ↗
08/28/2026B01186201-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026B01186201-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026B01267639-P1Open ↗
08/20/2026B01267639-I1Open ↗
08/16/2026B01186201-I1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01267639-I1Open ↗
▸Other Documents10
▸DOB NOWPlot Diagram4
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗
08/13/2026B01267639-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026B01186201-I1Open ↗
08/15/2026B01186201-P1Open ↗