← Back
Primarily 3 family with 1 store or office
1583 CONEY ISLAND AVENUE
BROOKLYN · BIN 3180581
💬 Discuss this project
1928Year Built
2Stories
S3Building Class
R5Zoning
2,400 sfGross Floor Area
4Units
Rent Stabilized7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 1583 REALTY COMPANY, LLC · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar1p · 1 filing · 16 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1583 REALTY1307/08/2026
OWNER OF 1583 CONEY ISLAN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.302/18/2025
HIGH LINE ENGINEERING PC110/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIRMARK HVAC, LLCGeneral Contractor303/21/2026
REMO CONSULTANTS LLCGeneral Contractor107/08/2026
JODOM MECHANICAL, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524302/18/2025
HIGH LINE ENGINEERING PC2920110/11/2024
Building Lifecycle
All (53)Filed (4)Permit Issued (3)Signed Off (3)Violation (18)Inspection (4)Special Inspection (21)
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
03/07/2025
Signed off — Alteration
APPLICATION FILED HEREWITH FOR TO INTERIOR RENOVATION THE EXISTING MIXED USE BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY
B01092253-I1
03/07/2025
Signed off — Alteration
APPLICATION FILED HEREWITH FOR TO INTERIOR RENOVATION THE EXISTING MIXED USE BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY
B01092253-S1
02/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/18/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR TO INTERIOR RENOVATION THE EXISTING MIXED USE BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY
B01092253-P1
02/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
02/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
02/04/2025
Signed off — Alteration
Installation of (4) new VRF air cooled condensing units along with associated air handlers, piping air registers and ductwork. new installation of ERV, new installation of supplemental electric wall heaters.
B01124777-I1
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
01/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
01/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
12/30/2024
Permit issued — Mechanical Systems
B01124777-I1-MS
10/11/2024
Filed — Alteration
Installation of (4) new VRF air cooled condensing units along with associated air handlers, piping air registers and ductwork. new installation of ERV, new installation of supplemental electric wall heaters.
B01124777-I1
10/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ruslan Nagorny
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ruslan Nagorny
10/09/2024
Special inspection requirement — Mechanical Systems
Ruslan Nagorny
10/09/2024
Special inspection requirement — Final
Ruslan Nagorny
10/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ruslan Nagorny
10/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ruslan Nagorny
10/09/2024
Special inspection requirement — Maintenance information
Ruslan Nagorny
09/25/2024
Permit issued — Plumbing
B01092253-S1-PL
08/26/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR TO INTERIOR RENOVATION THE EXISTING MIXED USE BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY
B01092253-S1
08/09/2024
Permit issued — General Construction
B01092253-I1-GC
08/07/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR TO INTERIOR RENOVATION THE EXISTING MIXED USE BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY
B01092253-I1
08/06/2024
Special inspection requirement — Fenestration air leakage
PRAMODRAY SHAH
08/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PRAMODRAY SHAH
08/06/2024
Special inspection requirement — Fenestration areas
PRAMODRAY SHAH
08/06/2024
Special inspection requirement — Final
PRAMODRAY SHAH
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
PRAMODRAY SHAH
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
04/09/2024
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
10/16/2018
Violation issued (HPD, closed)
I
11/21/2017
Violation issued (HPD, closed)
I
11/04/2016
Violation issued (HPD, closed)
I
10/08/2015
Violation issued (HPD, closed)
I
02/18/2015
Violation issued (HPD, closed)
I
07/13/2002
Violation issued (ECB, open)
HPD
09/27/1999
Violation issued (ECB, closed)
Boilers
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/15/1987
Violation issued (HPD, open)
B
04/15/1987
Violation issued (HPD, open)
A
04/15/1987
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAIRMARK HVAC, LLC12/30/2024
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC09/25/2024
DOB NOWGeneral ConstructionSigned-offREMO CONSULTANTS LLC08/09/2024
1 project · most recent 10/09/2024
General Wiring
FiledStatusContractorScope
10/09/2024CompleteSTAT ELECTRIC & MAINTENANGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
02/18/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
02/18/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
02/18/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
02/18/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
01/22/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
01/22/2025HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
01/22/2025HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
01/22/2025HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
10/09/2024HVAC-R and service water heating system controlsRuslan Nagornyenergy_progress
10/09/2024Fire-Resistant Penetrations and JointsRuslan Nagornyspecial
10/09/2024Mechanical SystemsRuslan Nagornyspecial
10/09/2024FinalRuslan Nagornyprogress
10/09/2024HVAC-R and service water heating equipmentRuslan Nagornyenergy_progress
10/09/2024HVAC-R and service water piping design and insulationRuslan Nagornyenergy_progress
10/09/2024Maintenance informationRuslan Nagornyenergy_progress
08/06/2024Fenestration air leakagePRAMODRAY SHAHenergy_progress
08/06/2024Fenestration and door U-factor and product ratingsPRAMODRAY SHAHenergy_progress
08/06/2024Fenestration areasPRAMODRAY SHAHenergy_progress
08/06/2024FinalPRAMODRAY SHAHprogress
08/06/2024Energy Code Compliance InspectionsPRAMODRAY SHAHprogress
08/06/2024Fire-Resistant Penetrations and JointsShahrish Shuvospecial
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01092253-S1Request digital key ↗
08/24/2026B01092253-P1Request digital key ↗
08/24/2026B01092253-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01092253-I1Open ↗
09/01/2026B01092253-I1Open ↗
08/26/2026B01092253-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01092253-I1Open ↗
08/26/2026B01092253-P1Open ↗
08/26/2026B01092253-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01092253-S1Open ↗
08/13/2026B01092253-P1Open ↗
08/13/2026B01092253-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01092253-S1Open ↗
08/13/2026B01092253-P1Open ↗
08/13/2026B01124777-I1Open ↗
Showing 3 of 4 on file for this type