1421 LOCUST AVENUE
BROOKLYN · BIN 3180669
💬 Discuss this project
1957Year Built
1Stories
G2Building Class
M1-1Zoning
9,154 sfGross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
Auto body / collision or auto repair · Owner of record: 1421 LOCUST LLC · 9,735 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction19p · 2 filings · 20 docs
Mezzanine1p · 1 filing · 5 docs
2 jobs · most recent 09/08/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/08/2026Permit IssuedDM80 SOLUTIONS LLC2 scope_items
05/07/2026——Steel, Concrete, Masonry
1 job · most recent 05/07/2026
Fence
FiledStatusContractorScope
05/07/2026——Fence
Building Lifecycle
All (101)Filed (8)Permit Issued (1)Violation (9)Inspection (3)Objection (50)Special Inspection (30)
09/08/2026
Filed — Alteration
INTERIOR RENOVATION AND EXTENSION AT FIRST FLOOR OF AN EXISTING ONE (1) STORY BUILDING.
B01270358-S1
08/27/2026
Objection resolved — Addressed
08/27/2026
Objection resolved — Addressed
08/26/2026
Filed — Alteration
INTERIOR RENOVATION AND EXTENSION AT FIRST FLOOR OF AN EXISTING ONE (1) STORY BUILDING.
B01270358-S5
08/25/2026
Objection resolved — Addressed
08/24/2026
Special inspection requirement — Post-installed Anchors
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/24/2026
Special inspection requirement — Subgrade Inspections
08/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
08/24/2026
Special inspection requirement — Underpinning
08/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/24/2026
Special inspection requirement — Final
08/24/2026
Special inspection requirement — Footing and Foundation
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
08/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/28/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Addressed
07/28/2026
Objection resolved — Addressed
07/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Other
06/22/2026
Objection raised — Other
06/15/2026
Filed — Alteration
INTERIOR RENOVATION AND EXTENSION AT FIRST FLOOR OF AN EXISTING ONE (1) STORY BUILDING.
B01270358-S4
06/12/2026
Objection resolved — Addressed
06/12/2026
Objection resolved — Addressed
06/12/2026
Objection resolved — Addressed
06/12/2026
Objection resolved — Addressed
06/12/2026
Objection resolved — Addressed
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
06/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/20/2026
Special inspection requirement — Fenestration areas
Paul Raymond
05/20/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Paul Raymond
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
05/20/2026
Special inspection requirement — Final
Paul Raymond
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
05/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
05/20/2026
Special inspection requirement — Air barrier — testing
Paul Raymond
05/20/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
05/20/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
05/20/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
05/20/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
05/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Admin
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Structural
05/07/2026
Filed — Alteration CO
ALT 1 FILING TO PROPOSE CHANGE OF USE FOR EXISTING ONE (1) STORY BUILDING AND PROPOSED NEW MEZZANINE WITHIN EXISTING BULK.
B01335694-S2
05/07/2026
Filed — Alteration
INTERIOR RENOVATION AND EXTENSION AT FIRST FLOOR OF AN EXISTING ONE (1) STORY BUILDING.
B01270358-P1
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
05/04/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
05/04/2026
Special inspection requirement — Air barrier — testing
Paul Raymond
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
05/04/2026
Special inspection requirement — Final
Paul Raymond
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
Latest 60 of 101 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALLIAH MANAGEMENT809/15/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TITAN ENGINEERS PC309/08/2026
DNB ENGINEERING PLLC106/15/2026
RISE ARCHITECTURE405/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DM80 SOLUTIONS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394205/07/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDM80 SOLUTIONS LLC03/24/2026
BISMHISSUEDULTIMATE IMPROVED INC11/26/2003
BISOTISSUEDALL ABOUT HEATING07/16/1997
BISPLISSUEDCC CONTROLLED PLBG CO INC07/16/1997
BISFBISSUEDNEW YORK HEATING CO10/16/1991
BISBLISSUEDNEW YORK HEATING CO01/30/1991
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/13/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/24/2026Post-installed Anchors—special
08/24/2026Structural Stability – Alterations of existing buildings—special
08/24/2026Subgrade Inspections—special
08/24/2026Subsurface Conditions – Fill Placement & In-Place Density—special
08/24/2026Underpinning—special
08/24/2026Subsurface Investigations (Borings/Test Pits)—special
08/24/2026Final—progress
08/24/2026Footing and Foundation—progress
08/24/2026Concrete - Cast-In-Place—special
08/24/2026Excavations - Sheeting, Shoring, and Bracing—special
06/12/2026Energy Code Compliance Inspections—progress
06/12/2026Fire-Resistance Rated Construction—progress
05/20/2026Fenestration areasPaul Raymondenergy_progress
05/20/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Paul Raymondspecial
05/20/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/20/2026FinalPaul Raymondprogress
05/20/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
05/20/2026Energy Code Compliance InspectionsPaul Raymondprogress
05/20/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
05/20/2026Air barrier — testing Paul Raymondenergy_progress
05/20/2026Insulation placement and R valuesPaul Raymondenergy_progress
05/20/2026Fenestration air leakagePaul Raymondenergy_progress
05/20/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
05/20/2026Air barrier - visual inspectionPaul Raymondenergy_progress
05/04/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
Latest 25 of 53.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026B01335694-S1Request digital key ↗
08/19/2026B01335694-S2Request digital key ↗
08/17/2026B01270358-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
01/11/2018321524178Open ↗
02/13/2017321524178Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/10/2018321524178Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/10/2018321524178Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/19/2026B01335694-S2Open ↗
08/19/2026B01335694-S1Open ↗
08/19/2026B01335694-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01270358-P1Open ↗
09/01/2026B01270358-P1Open ↗
08/27/2026B01270358-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01270358-P1Open ↗
09/01/2026B01270358-P1Open ↗
08/27/2026B01270358-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/10/2018321524178Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01270358-I1Open ↗
08/17/2026B01270358-P1Open ↗
08/15/2026B01335694-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/10/2018321524178Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/14/2026B01270358-S3Open ↗
08/14/2026B01270358-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B01270358-S4Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
02/13/2017321524178Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/13/2017321524178Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
02/13/2017321524178Open ↗
▸DOB NOWPlot Diagram1
08/14/2026B01270358-S4Open ↗