← Back
Four families
1241 EAST 18 STREET
BROOKLYN · BIN 3180718
💬 Discuss this project
1925Year Built
2Stories
C3Building Class
R7AZoning
3,432 sfGross Floor Area
4Units
Rent Stabilized17 Open Violations ▸FDNY Report ↗
Four families · Owner of record: HASC CENTER, INC. · 3,000 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction16p · 2 filings · 13 docs
Floor 1Under Construction15p · 2 filings · 13 docs
CellarUnder Construction16p · 3 filings · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2024$1.6M—BANDC LLC → HASC CENTER, INC.$481/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VAA307/31/2026
DOWNTOWN ENGINEERS203/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VAA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TARGET PIPING NY LLCFire Protection107/03/2026
EURO BUILDING GROUP INCGeneral Contractor107/08/2026
B&B MECH PLBG & HTG LLCPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394204/30/2026
Building Lifecycle
All (65)Filed (5)Permit Issued (3)Violation (23)Inspection (4)Objection (13)Special Inspection (17)
09/29/2026
Objection raised — Zoning
09/29/2026
Objection raised — Zoning
09/29/2026
Objection raised — Zoning
09/29/2026
Objection raised — Zoning
09/29/2026
Objection raised — Zoning
09/29/2026
Objection raised — Zoning
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2026
Objection raised — Zoning
07/31/2026
Filed — Alteration CO
Propose to remove and install some interior non-bearing partitions for 2 Individualized Residential Alternative R-3. All as per plans filed herewith.
B01436868-I1
07/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2026
Permit issued — Sprinklers
B01307759-I1-EW-SP
06/23/2026
Permit issued — Sprinklers
B01307759-I1-PL
05/13/2026
Permit issued — General Construction
B01394259-I1-GC
05/04/2026
Violation issued (HPD, open)
A
04/30/2026
Filed — Alteration
Propose to remove and install some interior non bearing partitions as per plans filed herewith. No Change in use egress or ocupancy is proposed under this application.
B01394259-I1
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/29/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/29/2026
Special inspection requirement — Interior lighting power
Paul Raymond
04/29/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
04/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
04/28/2026
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
04/28/2026
Special inspection requirement — Masonry
Paul Raymond
04/28/2026
Special inspection requirement — Final
Paul Raymond
03/20/2026
Objection raised — Structural
03/20/2026
Objection raised — Admin
03/20/2026
Objection raised — Cost
03/20/2026
Objection raised — Structural
03/20/2026
Objection raised — Zoning
03/20/2026
Objection raised — Scope
03/05/2026
Filed — Alteration
Propose to install mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
B01307759-S1
03/05/2026
Filed — Alteration
Propose to install mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
B01307759-I1
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/02/2026
Special inspection requirement — Maintenance information
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
02/27/2026
Filed — Alteration CO
Propose to remove and install some interior non bearing partitions for 2-Individulalized Residential Alternatives R-3 all as per plans filed herewith.
B01307270-I1
11/20/2025
Violation issued (HPD, open)
I
10/23/2025
Special inspection requirement — Mechanical Systems
10/23/2025
Special inspection requirement — Final
06/09/2025
Violation issued (HPD, open)
A
04/09/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, closed)
I
03/22/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, open)
A
04/08/2021
Violation issued (HPD, open)
A
10/08/2015
Violation issued (HPD, closed)
I
02/18/2015
Violation issued (HPD, closed)
I
05/17/1999
Violation issued (HPD, open)
B
09/22/1987
Violation issued (HPD, open)
A
09/22/1987
Violation issued (HPD, open)
A
09/22/1987
Violation issued (HPD, open)
B
09/22/1987
Violation issued (HPD, open)
B
09/22/1987
Violation issued (HPD, open)
A
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC07/01/2026
DOB NOWSprinklersPermit IssuedB&B MECH PLBG & HTG LLC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedEURO BUILDING GROUP INC05/13/2026
1 project · most recent 03/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TUHYE0723AN41AN 6 tons · Condensing Unit ×1
TUHYE0963AN41AN 8 tons · Vrf Outdoor ×1
1 project · most recent 03/05/2026
FiledStatusContractorScope
03/05/2026Permit IssuedTARGET PIPING NY LLC270 heads
1 project · most recent 03/05/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
03/05/2026Permit IssuedB&B MECH PLBG & HTG LLCGas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/29/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
04/29/2026Air barrier - visual inspectionPaul Raymondenergy_progress
04/29/2026Interior lighting powerPaul Raymondenergy_progress
04/29/2026Insulation placement and R valuesPaul Raymondenergy_progress
04/29/2026Energy Code Compliance InspectionsPaul Raymondprogress
04/29/2026Structural Stability – Alterations of existing buildingsPaul Raymondspecial
04/28/2026Concrete - Cast-In-PlacePaul Raymondspecial
04/28/2026MasonryPaul Raymondspecial
04/28/2026FinalPaul Raymondprogress
03/02/2026HVAC-R and service water piping design and insulation—energy_progress
03/02/2026HVAC-R and service water heating equipment—energy_progress
03/02/2026Maintenance information—energy_progress
03/02/2026Fire-Resistant Penetrations and Joints—special
03/02/2026HVAC-R and service water heating system controls—energy_progress
03/02/2026Energy Code Compliance Inspections—progress
10/23/2025Mechanical Systems—special
10/23/2025Final—progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B01307759-S1Request digital key ↗
08/18/2026B01307759-I1Request digital key ↗
08/17/2026B01394259-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01436868-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01394259-I1Open ↗
08/16/2026B01436868-I1Open ↗
08/13/2026B01307759-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01394259-I1Open ↗
08/26/2026B01394259-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01394259-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01436868-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWOER: Notice to Proceed1
08/18/2026B01307759-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/17/2026B01394259-I1Open ↗
08/14/2026B01436868-I1Open ↗
08/13/2026B01307759-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026B01436868-I1Open ↗