← Back
Elevator apt, semi-fireproof without stores
1233 EAST 19 STREET
BROOKLYN · BIN 3180730
💬 Discuss this project
1960Year Built
6Stories
D1Building Class
R7AZoning
53,275 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized19 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: UNAVAILABLE OWNER · 12,000 sf lot · 4.44 FAR built · Flood zone X
Locations of Work
Structural
Cellar1p · 1 filing · 7 docs
3 jobs · most recent 11/11/2024
General Wiring Boiler Controls
FiledStatusContractorScope
11/11/2024Permit IssuedFIRST QUALITY ELECL LLCGeneral Wiring
08/17/2020CompleteCOUNTY ELECL CONTRACTOR IBoiler Controls
04/20/2020CompleteSTAR ELEC'L CONTRACTORS C—
Building Lifecycle
All (94)Filed (4)Permit Issued (5)Signed Off (3)Facade (FISP) (12)Violation (60)Objection (2)Special Inspection (8)
08/21/2026
Violation issued (ECB, open)
Construction
08/11/2026
Violation issued (HPD, open)
A
08/10/2026
Violation issued (HPD, open)
A
08/03/2026
Violation issued (ECB, closed)
Elevators
08/01/2026
Violation issued (HPD, open)
A
07/22/2026
Violation issued (HPD, open)
A
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
A
07/22/2026
Violation issued (HPD, open)
B
07/22/2026
Violation issued (HPD, open)
B
04/20/2026
Violation issued (HPD, open)
C
04/20/2026
Violation issued (HPD, closed)
C
03/25/2026
Violation issued (HPD, closed)
B
03/25/2026
Violation issued (HPD, closed)
B
03/25/2026
Violation issued (HPD, closed)
C
03/25/2026
Violation issued (HPD, closed)
A
03/25/2026
Violation issued (HPD, closed)
B
03/25/2026
Violation issued (HPD, closed)
B
03/25/2026
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
A
11/04/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
A
10/27/2025
Violation issued (HPD, closed)
A
10/27/2025
Violation issued (HPD, closed)
A
10/27/2025
Violation issued (HPD, closed)
B
10/27/2025
Violation issued (HPD, closed)
A
10/27/2025
Violation issued (HPD, closed)
B
10/24/2025
Signed off — Alteration
Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.
B01220164-I1
09/05/2025
Permit issued — General Construction
B01220164-I1-GC-CX
08/19/2025
Objection resolved — Addressed
08/13/2025
Violation issued (HPD, closed)
B
07/18/2025
Violation issued (HPD, closed)
B
07/18/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, closed)
C
07/07/2025
Objection raised — Other
06/25/2025
Violation issued (HPD, closed)
B
06/19/2025
Filed — Alteration
Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.
B01220164-I1
06/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
AHMAD KHANZADA
06/18/2025
Violation issued (HPD, closed)
C
06/05/2025
Violation issued (HPD, closed)
C
06/05/2025
Violation issued (HPD, closed)
C
06/05/2025
Violation issued (HPD, closed)
B
06/05/2025
Violation issued (HPD, closed)
B
06/05/2025
Violation issued (HPD, closed)
A
05/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
05/02/2025
Special inspection requirement — Final
AHMAD KHANZADA
05/02/2025
Special inspection requirement — Concrete - Cast-In-Place
AHMAD KHANZADA
04/19/2025
Violation issued (HPD, open)
B
04/19/2025
Violation issued (HPD, open)
C
03/04/2025
Violation issued (HPD, closed)
B
03/04/2025
Violation issued (HPD, closed)
C
03/04/2025
Violation issued (HPD, closed)
A
03/04/2025
Violation issued (HPD, closed)
B
02/10/2025
Violation issued (ECB, closed)
Construction
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, closed)
B
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGSWAY REALTY103/22/2026
ARBA REALTY1203/22/2026
OWNER OF 133 E 19 ST BK N103/22/2026
ARBA MANAGEMENT C/O LAZAR203/22/2026
ARDA REALTY ASSOCIATES103/22/2026
ARABA REALTY ASSOICATE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAUER MECHANCIAL LLCPlumbing207/08/2026
NEW STAR CONTRACTING INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMKA & ASSOCIATES LLC8239106/19/2025
NEW YORK ENGINEERING ASSO851211/20/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNEW STAR CONTRACTING INC09/05/2025
DOB NOWPlumbingSigned-offMIDWOOD-RAFTERY PLBG &HTG11/04/2021
DOB NOWBoiler EquipmentSigned-offG. BAUER, INC11/19/2020
DOB NOWBoiler EquipmentSigned-offG. BAUER, INC08/24/2020
DOB NOWPlumbingSigned-offMIDWOOD-RAFTERY PLBG &HTG08/20/2020
BISPLISSUEDDUAL FUEL PLUMBING & HEATING09/23/1998
BISPLISSUEDSANFORD STEIN CONSULTANTS07/24/1992
BISOTISSUEDHYDRO COMPACTOR INC06/16/1992
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/19/2025Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
05/02/2025Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
05/02/2025FinalAHMAD KHANZADAprogress
05/02/2025Concrete - Cast-In-PlaceAHMAD KHANZADAspecial
11/23/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
11/23/2020Heating SystemsLOUIS ARENAspecial
11/23/2020HVAC and service water heating equipment LOUIS ARENAenergy_progress
11/23/2020Maintenance informationLOUIS ARENAenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00386048-S1Request digital key ↗
08/15/2026B00386048-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026B01220164-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00386048-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B01220164-I1Open ↗
08/13/2026B00386048-S1Open ↗
08/13/2026B00386048-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01220164-I1Open ↗
08/27/2026B00386048-S1Open ↗
08/27/2026B00386048-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01220164-I1Open ↗
09/01/2026B01220164-I1Open ↗
09/01/2026B01220164-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/13/2026B00386048-S1Open ↗
08/13/2026B00386048-P1Open ↗
08/13/2026B00386048-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00386048-S1Open ↗
08/13/2026B00386048-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01220164-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00386048-S1Open ↗