← Back
Primarily 2 family with 1 store or office
1324 AVENUE M
BROOKLYN · BIN 3180830
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R7AZoning
2,721 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: ZIM PROPERTIES CORP. · 920 sf lot · 2.96 FAR built · Flood zone X
Locations of Work
Architecture
Floor 32p · 2 filings · 12 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60TH VENTURE1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KOSSAR + GARRY ARCHITECTS, LLP210/20/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILTON CONSTRUCTION MNGRSGeneral Contractor303/21/2026
EL-ROC CONTRACTING OF BKPlumbing107/08/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SE INSPECTIONS7486110/20/2022
Building Lifecycle
All (7)Filed (2)Permit Issued (3)Signed Off (2)
05/05/2023
Signed off — Alteration
Herewith filing for the selective removal of plaster, removal and replacement of all interior doors, door and window trims, floor finishes, kitchen and bathroom fixtures, and kitchen cabinets. All walls and ceilings will be laminated.
B08023333-I1
02/02/2023
Signed off — Alteration
Replacement of existing plumbing fixtures in the bathroom and kitchen.
B08023991-I1
12/01/2022
Permit issued — Plumbing
B08023991-I1-PL
10/27/2022
Permit issued — Plumbing
B08023991-I1-PL
10/26/2022
Permit issued — General Construction
B08023333-I1-GC
10/20/2022
Filed — Alteration
Herewith filing for the selective removal of plaster, removal and replacement of all interior doors, door and window trims, floor finishes, kitchen and bathroom fixtures, and kitchen cabinets. All walls and ceilings will be laminated.
B08023333-I1
10/20/2022
Filed — Alteration
Replacement of existing plumbing fixtures in the bathroom and kitchen.
B08023991-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK12/01/2022
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP10/27/2022
DOB NOWGeneral ConstructionSigned-offWILTON CONSTRUCTION MNGRS10/26/2022
1 project · most recent 11/30/2022
FiledStatusContractorScope
11/30/2022Permit IssuedAMC ELEC'L SERVICES, INC.4 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/20/2022Lighting in dwelling unitsSpencer Goroffenergy_progress
10/19/2022Fire-Resistant Penetrations and JointsSpencer Goroffspecial
10/19/2022Energy Code Compliance InspectionsSpencer Goroffprogress
10/19/2022FinalSpencer Goroffprogress
10/19/2022Fenestration air leakageSpencer Goroffenergy_progress
10/19/2022Fenestration and door U-factor and product ratingsSpencer Goroffenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B08023333-I1Request digital key ↗
08/28/2026B08023991-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B08023333-I1Open ↗
08/24/2026B08023333-I1Open ↗
08/24/2026B08023333-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B08023991-I1Open ↗
08/13/2026B08023333-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B08023333-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B08023333-I1Open ↗
08/13/2026B08023991-I1Open ↗