← Back
Building

1675 East 18 Street, Brooklyn

1675 East 18 Street, Brooklyn: 2 DOB NOW job filings; 6 work permits (4 open, 2 signed off); 3 open violations. Most recent permit issued 2025-10-24.

Building facts

Borough
Brooklyn
Year built
1940
Stories
6
Dwelling units
58
Building floor area (sq ft)
60,500
Zoning
R7A
Building class
D1

Design team

Design firmDisciplineJobs at this building
Tectonic EngineeringGeneral Engineering1

Contractors and firms on permits

BusinessJobs at this building
Communication Component S1
Harry Construction Group1

Work permits

IssuedWork typeStatusBusinessDescription
2025-10-24AntennaSigned-offCommunication Component SModification to existing VERIZON site on the roof. Installation of 5 antennas, 5 RRH units and 1 equipment platform with related cabinets. Replacement of 4 antennas and…
2025-08-19AntennaSigned-offCommunication Component SModification to existing VERIZON site on the roof. Installation of 5 antennas, 5 RRH units and 1 equipment platform with related cabinets. Replacement of 4 antennas and…
2020-10-05Sidewalk ShedPermit IssuedHarry Construction GroupPROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUAR…
2020-02-04Sidewalk ShedPermit IssuedHarry Construction GroupPROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUAR…
2019-10-08Sidewalk ShedPermit IssuedHarry Construction GroupPROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUAR…
2019-07-30Sidewalk ShedPermit IssuedHarry Construction GroupPROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUAR…

Job filings

JobFiledTypeStatus
B008486482025-03-28AlterationApproved
B002018272019-07-29AlterationPermit Entire

Open violations

IssuedSourceTypeDescription
2020-01-26hpdC§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION…
2019-12-02hpdC§ 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 200…
2003-09-14hpdA§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT F5, 6th STO…

Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.