← Back
Two family frame
1616 EAST 23 STREET
BROOKLYN · BIN 3182613
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R3-2Zoning
2,624 sfGross Floor Area
2Units
Two family frame · Owner of record: 1616 EAST 23RD STREET LLC · 4,000 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 3 docs
Floor 2Under Construction2p · 2 filings · 8 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEK CONSTRUCTION LLC207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES205/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&T CONSULTANTS LLCGeneral Contractor105/29/2026
AL PLUMBING & CONT. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524105/21/2026
Building Lifecycle
All (7)Filed (2)Permit Issued (2)Special Inspection (3)
05/27/2026
Permit issued — Plumbing
B01405663-I1-PL
05/27/2026
Permit issued — General Construction
B01405636-I1-GC
05/21/2026
Filed — Alteration
PLUMBING WORK AT 2ND FLOOR AS PER PLAN
B01405663-I1
05/21/2026
Filed — Alteration
INTERIOR RENOVATION AT 2ND FLOOR AS PER PLAN
B01405636-I1
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
05/21/2026
Special inspection requirement — Final
Shahrish Shuvo
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAL PLUMBING & CONT. INC05/27/2026
DOB NOWGeneral ConstructionPermit IssuedL&T CONSULTANTS LLC05/27/2026
1 project · most recent 05/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/21/2026Permit IssuedAL PLUMBING & CONT. INCGas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/21/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/21/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
05/21/2026FinalShahrish Shuvoprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01405636-I1Request digital key ↗
08/16/2026B01405663-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01405636-I1Open ↗
08/16/2026B01405663-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026B01405636-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026B01405636-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026B01405636-I1Open ↗
08/16/2026B01405663-I1Open ↗