Predominantly retail with other uses
1412 KINGS HIGHWAY
BROOKLYN · BIN 3182972
💬 Discuss this project
1925Year Built
3Stories
K4Building Class
C4-4AZoning
4,955 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 1412 KINGS REALTY LLC · 2,172 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
Mechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 6 docs
Floor 1Under Construction1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1412 KINGS REALTY608/30/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/16/2018$2.0M—SEDAGHATI MANAGEMENT INC. → 1412 KINGS REALTY LLC$404/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC208/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OZ BOSPH CONSTRUCTION CORGeneral Contractor303/21/2026
MKNKGeneral Contractor108/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422108/18/2026
ARCHITECTURAL CONCEPT3642110/31/2020
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Signed Off (1)Violation (9)Special Inspection (5)
08/28/2026
Permit issued — Mechanical Systems
B01445199-I1-MS
08/18/2026
Filed — Alteration
APPLICATION IS FILED TO CORRECT THE HVAC UNITS AND OBTAIN THE CERTIFICATE OF COMPLIANCE ALL AS PER PLANS SUBMITTED. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B01445199-I1
08/12/2026
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
08/12/2026
Special inspection requirement — Final
SERDAR CEYLAN
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
08/12/2026
Special inspection requirement — HVAC insulation and sealing
SERDAR CEYLAN
08/12/2026
Special inspection requirement — HVAC and service water heating system controls
SERDAR CEYLAN
07/22/2024
Violation issued (FDNY_NOV, closed)
12/13/2021
Violation issued (FDNY_NOV, closed)
01/21/2021
Signed off — Alteration
INSTALLATION OF AC (2) AND REFRIGATION CONDENSERS (1) ON EXISTING DUNNAGE BEAMS ON ROOF CONNECTING TO EXISTING DUCT SYSTEM AND INSTALLATION OF 1 FAN UNIT AT CELLAR ALL AS PER PLANS SUBMITTED. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00418897-I1
11/04/2020
Permit issued — Mechanical Systems
B00418897-I1-MS
10/31/2020
Filed — Alteration
INSTALLATION OF AC (2) AND REFRIGATION CONDENSERS (1) ON EXISTING DUNNAGE BEAMS ON ROOF CONNECTING TO EXISTING DUCT SYSTEM AND INSTALLATION OF 1 FAN UNIT AT CELLAR ALL AS PER PLANS SUBMITTED. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00418897-I1
06/12/2009
Violation issued (ECB, closed)
Construction
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/1996
Violation issued (FDNY_NOV, closed)
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMKNK CORP08/28/2026
DOB NOWMechanical SystemsSigned-offOZ BOSPH CONSTRUCTION COR11/04/2020
BISOTISSUEDREYES INTERNATIONAL ASST. INC.05/21/2004
BISOTISSUEDENTERPRISE ELECTRICAL CONTRACTIN12/21/1993
BISMHISSUEDENTERPRISE ELECTRICAL CONTRACTIN11/30/1993
BISEQISSUEDENTERPRISE ELECTRICAL CONTRACTIN11/30/1993
1 project · most recent 08/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedMKNK CORPHeating and Air Conditioning Systems
Heat / Cool
American Standard GBC060A3EMB05000 5 tons · Rooftop Unit ×1
GBC180A3EMB05000 15 tons · Rooftop Unit ×1
Trane TTA12043CAA01AS0000 10 tons · Rooftop Unit ×1
1 project · most recent 01/14/2022
FiledStatusContractorScope
01/14/2022Permit IssuedLENS ELECTRIC, INC1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/12/2026Mechanical SystemsSERDAR CEYLANspecial
08/12/2026FinalSERDAR CEYLANprogress
08/12/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
08/12/2026HVAC insulation and sealing SERDAR CEYLANenergy_progress
08/12/2026HVAC and service water heating system controls SERDAR CEYLANenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00418897-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/19/2026B01445199-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/02/2026B00418897-I1Open ↗
08/19/2026B01445199-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B01445199-I1Open ↗
08/29/2026B01445199-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B01445199-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/02/2026B00418897-I1Open ↗
08/19/2026B01445199-I1Open ↗