1840 East 13 Street, Brooklyn: 5 DOB NOW job filings; 8 work permits (3 open, 5 signed off); 82 open violations. Most recent permit issued 2026-08-19.
| Design firm | Discipline | Jobs at this building |
|---|---|---|
| Dooling & Company Architects | Architecture | 1 |
| Ma Engineering, P.C. | General Engineering | 1 |
| Mumtaz Enterprises | General Engineering | 1 |
| Business | Jobs at this building |
|---|---|
| All Empire Building Con | 1 |
| K & G NY Restoration Inc. | 1 |
| Mnk Enterprises LLC | 1 |
| Rj NY Restorations Inc. | 1 |
| Sasco Construction Enter | 1 |
| Issued | Work type | Status | Business | Description |
|---|---|---|---|---|
| 2026-08-19 | Supported Scaffold | Permit Issued | All Empire Building Con | CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUI… |
| 2026-08-13 | Sidewalk Shed | Permit Issued | All Empire Building Con | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE I… |
| 2026-08-03 | General Construction | Signed-off | K & G NY Restoration Inc. | APPLICATION FILING TO MINOR REPAIR INCLUDING RE-POINTING, FACE BRICKS REPLACEMENT, REPLACE ANGLE LINE AT FRONT FACADE AS PER PLAN TO SUPERSEDE JOB# B01157080-I1. NO CHAN… |
| 2025-02-18 | General Construction | Permit Issued | Rj NY Restorations Inc. | PROPOSED GRINDING AND POINTING AND RUSTED LINTLES AS PER PLANS. THERE IS NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| 2022-08-11 | Sidewalk Shed | Signed-off | Mnk Enterprises LLC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING C… |
| 2021-08-10 | Sidewalk Shed | Signed-off | Mnk Enterprises LLC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING C… |
| 2021-03-03 | General Construction | Signed-off | Sasco Construction Enter | FACADE REPAIRS AS PER PLAMS. NO CHANGE IN USE, EGRESS OR OCUPPANCY. |
| 2020-08-03 | Sidewalk Shed | Signed-off | Mnk Enterprises LLC | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING C… |
| Job | Filed | Type | Status |
|---|---|---|---|
| B01444073 | 2026-08-13 | Alteration | Permit Entire |
| B01423470 | 2026-07-07 | Alteration | Permit Entire |
| B01157080 | 2024-12-18 | Alteration | On Hold – Administrative Action |
| B00445642 | 2021-07-16 | Alteration | Approved |
| B00379488 | 2020-08-03 | Alteration | LOC Issued |
Latest 15 of 82 open violations.
| Issued | Source | Type | Description |
|---|---|---|---|
| 2026-08-08 | hpd | B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6M, 6th STORY, 2nd… |
| 2026-08-08 | hpd | B | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL ELECTRICAL OUTLETS AND AT LIGHT FIXTURE IN THE 1st ROOM FROM EAST AT S… |
| 2026-08-08 | hpd | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT F… |
| 2026-08-08 | hpd | B | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL ELECTRICAL OUTLETS AND AT LIGHT FIXTURE IN THE FOYER LOCATED AT APT 6M… |
| 2026-08-08 | hpd | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| 2026-07-07 | hpd | B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE W… |
| 2026-07-07 | hpd | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE KITCHEN , THE FOYER ,… |
| 2026-07-07 | hpd | B | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ELECTRICAL OUTLETS AT THE EAST WALL, SOUTH WALL AND WEST WALL IN THE 1st ROOM… |
| 2026-07-07 | hpd | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , S… |
| 2026-07-07 | hpd | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT… |
| 2026-07-07 | hpd | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MARBLE SADDLE AT DOOR IN THE BATHROOM LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH ,… |
| 2026-07-07 | hpd | B | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ELECTRICAL OUTLETS AT THE NORTH WALL AND WEST WALL IN THE FOYER LOCATED AT AP… |
| 2026-07-07 | hpd | B | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURE AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6M, 6th… |
| 2026-07-07 | hpd | A | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT NO… |
| 2026-07-07 | hpd | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE IN THE 4th ROOM FROM E… |
Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.