← Back
Three families
14 BAY 40 STREET
BROOKLYN · BIN 3185699
💬 Discuss this project
1935Year Built
2Stories
C0Building Class
R5Zoning
—Gross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 1.24 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 01/19/2023
FiledStatusContractorScope
01/19/2023CompleteKEVIN KEAVENY ELEC CO INC4 meters, 1 new_meters
Building Lifecycle
All (14)Filed (3)Permit Issued (2)Signed Off (1)Violation (3)Inspection (2)Special Inspection (3)
03/06/2023
Signed off — Alteration
INSTALLATION (5) SPRINKLER HEADS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00476569-I1
01/04/2023
Filed — Alteration
INSTALLATION (5) SPRINKLER HEADS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00476569-P2
01/04/2023
Special inspection requirement — Sprinkler Systems
XIONGCAI GU
01/04/2023
Special inspection requirement — Sprinkler Systems
MOHAMMAD BILLAH
10/14/2022
Permit issued — Sprinklers
B00476569-I1-EW-SP
04/15/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/15/2022
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
11/13/2021
Permit issued — Sprinklers
B00476569-I1-EW-SP
08/20/2021
Filed — Alteration
INSTALLATION (5) SPRINKLER HEADS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00476569-P1
08/19/2021
Special inspection requirement — Sprinkler Systems
MOHAMMAD BILLAH
02/26/2021
Filed — Alteration
INSTALLATION (5) SPRINKLER HEADS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00476569-I1
12/17/2005
Violation issued (ECB, closed)
Construction
10/28/2005
Violation issued (ECB, closed)
Site Safety
10/28/2005
Violation issued (ECB, closed)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUST CONSULTING ENGINEERING201/04/2023
BILLAH ENGINEERING PLLC108/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PASQUALE QUARATINO INCFire Protection207/08/2026
KEVIN KEAVENY ELEC CO INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BILLAH ENGINEERING5838201/04/2023
G ENGINEERING PC7778102/26/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPASQUALE QUARATINO INC10/14/2022
DOB NOWSprinklersSigned-offPASQUALE QUARATINO INC11/13/2021
BIS—ISSUEDSPLEN CONSTRUCTION INC04/12/2021
BIS—ISSUEDSJ EMPIRE CORP04/03/2019
BISPLISSUEDPASQUALE QUARATINO INC02/07/2006
BIS—ISSUEDKEEP IT SIMPLE SOLUTIONS12/12/2005
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/04/2023Sprinkler SystemsXIONGCAI GUspecial
01/04/2023Sprinkler SystemsMOHAMMAD BILLAHspecial
08/19/2021Sprinkler SystemsMOHAMMAD BILLAHspecial
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Sprinkler3
08/28/2026B00476569-I1Request digital key ↗
08/15/2026B00476569-P1Request digital key ↗
08/15/2026B00476569-P2Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION20
11/12/2025302047540Open ↗
10/29/2025302047540Open ↗
07/12/2023302047540Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION2
04/13/2021302047540Open ↗
04/05/2019302047540Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/17/2023302047540Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/11/2025302047540Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/21/2025302047540Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00476569-P2Open ↗
08/13/2026B00476569-I1Open ↗
08/13/2026B00476569-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/02/2019302047540Open ↗
06/19/2017321566952Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B00476569-P2Open ↗
08/25/2026B00476569-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
06/11/2009320032139Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/19/2017321566952Open ↗
▸Environmental & Asbestos1
▸BIS* ASBESTOS ACP 7 OR 5 OR ASB 41
06/18/2025302047540Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/09/2019302047540Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE5
07/06/2023302047540Open ↗
07/05/2023302047540Open ↗
07/02/2023302047540Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
06/11/2009320032139Open ↗
▸BISSUPERSEDING LETTER1
04/13/2021302047540Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT2
06/19/2017321566952Open ↗
06/11/2009320032139Open ↗
▸BISCARBON MONOXIDE AFFIDAVIT1
03/02/2026302047540Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/27/2026302047540Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION3
07/12/2023302047540Open ↗
03/03/2021302047540Open ↗
02/25/2021302047540Open ↗
▸BISEFILING COVER SHEET2
06/19/2017321566952Open ↗
06/11/2009320032139Open ↗
▸BISBOROUGH INTAKE FORM2
04/13/2021302047540Open ↗
04/23/2019321566952Open ↗