← Back
Three families
168 BAY 34 STREET
BROOKLYN · BIN 3185906
💬 Discuss this project
1925Year Built
2.5Stories
C0Building Class
R5Zoning
3,048 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 3,706 sf lot · 0.82 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanical
Cellar7p · 2 filings · 20 docs
Nothing on file for this building.
Building Lifecycle
All (51)Filed (5)Permit Issued (2)Signed Off (2)Violation (7)Inspection (5)Special Inspection (30)
03/21/2023
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
A
01/13/2022
Signed off — Alteration
INSTALL 3 NEW BOILER, 3 H.W.H, GAS & PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00602541-I1
01/13/2022
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00602653-I1
12/28/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
HO YIN LAW
12/03/2021
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
12/03/2021
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
12/03/2021
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
12/03/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
12/03/2021
Special inspection requirement — Insulation placement and R values
HO YIN LAW
12/03/2021
Special inspection requirement — Metering
HO YIN LAW
12/03/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
HO YIN LAW
12/03/2021
Special inspection requirement — Fenestration areas
HO YIN LAW
12/03/2021
Special inspection requirement — Fenestration air leakage
HO YIN LAW
12/03/2021
Special inspection requirement — Interior lighting power
HO YIN LAW
12/03/2021
Special inspection requirement — Air barrier - visual inspection
HO YIN LAW
12/03/2021
Special inspection requirement — Final
HO YIN LAW
12/03/2021
Special inspection requirement — Fire-Resistance Rated Construction
HO YIN LAW
12/03/2021
Special inspection requirement — Lowest Floor Elevation
HO YIN LAW
12/03/2021
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
12/02/2021
Filed — Alteration
INTERIOR RENOVATION OF CELLAR AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00602653-P2
12/02/2021
Filed — Alteration
INSTALL 3 NEW BOILER, 3 H.W.H, GAS & PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00602541-P1
12/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
12/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
HO YIN LAW
12/01/2021
Special inspection requirement — Lowest Floor Elevation
HO YIN LAW
12/01/2021
Special inspection requirement — Interior lighting power
HO YIN LAW
12/01/2021
Special inspection requirement — Insulation placement and R values
HO YIN LAW
12/01/2021
Special inspection requirement — Fenestration areas
HO YIN LAW
12/01/2021
Special inspection requirement — Fenestration air leakage
HO YIN LAW
12/01/2021
Special inspection requirement — Air barrier - visual inspection
HO YIN LAW
12/01/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
HO YIN LAW
12/01/2021
Special inspection requirement — Metering
HO YIN LAW
12/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
12/01/2021
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
11/24/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2021
Permit issued — General Construction
B00602653-I1-GC
10/05/2021
Filed — Alteration
INTERIOR RENOVATION OF CELLAR AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00602653-P1
09/29/2021
Filed — Alteration
INSTALL 3 NEW BOILER, 3 H.W.H, GAS & PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00602541-I1
09/29/2021
Filed — Alteration
INTERIOR RENOVATION OF CELLAR AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00602653-I1
09/29/2021
Permit issued — Plumbing
B00602541-I1-PL
04/07/2021
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (HPD, closed)
A
07/26/2018
Violation issued (ECB, closed)
Zoning
10/07/2015
Violation issued (HPD, closed)
I
04/17/2007
Violation issued (ECB, closed)
Zoning
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KL INNOVATIVE DESIGN INC512/02/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KL INNOVATIVE DESIGN INC7225512/02/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY10/07/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC09/29/2021
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
12/03/2021Structural Stability – Alterations of existing buildingsHO YIN LAWspecial
12/03/2021Energy Code Compliance InspectionsHO YIN LAWprogress
12/03/2021HVAC-R and service water heating system controlsHO YIN LAWenergy_progress
12/03/2021HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
12/03/2021HVAC-R and service water piping design and insulationHO YIN LAWenergy_progress
12/03/2021Fire-Resistant Penetrations and JointsHO YIN LAWspecial
12/03/2021Insulation placement and R valuesHO YIN LAWenergy_progress
12/03/2021MeteringHO YIN LAWenergy_progress
12/03/2021Fenestration and door U-factor and product ratingsHO YIN LAWenergy_progress
12/03/2021Fenestration areasHO YIN LAWenergy_progress
12/03/2021Fenestration air leakageHO YIN LAWenergy_progress
12/03/2021Interior lighting powerHO YIN LAWenergy_progress
12/03/2021Air barrier - visual inspectionHO YIN LAWenergy_progress
12/03/2021FinalHO YIN LAWprogress
12/03/2021Fire-Resistance Rated ConstructionHO YIN LAWprogress
12/03/2021Lowest Floor ElevationHO YIN LAWprogress
12/03/2021Energy Code Compliance InspectionsHO YIN LAWprogress
12/03/2021Fire-Resistant Penetrations and JointsHO YIN LAWspecial
12/01/2021HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
12/01/2021Fire-Resistance Rated ConstructionHO YIN LAWprogress
12/01/2021Lowest Floor ElevationHO YIN LAWprogress
12/01/2021Interior lighting powerHO YIN LAWenergy_progress
12/01/2021Insulation placement and R valuesHO YIN LAWenergy_progress
12/01/2021Fenestration areasHO YIN LAWenergy_progress
12/01/2021Fenestration air leakageHO YIN LAWenergy_progress
Latest 25 of 49.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00602653-P1Request digital key ↗
09/01/2026B00602653-P2Request digital key ↗
09/01/2026B00602653-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00602541-P1Open ↗
09/02/2026B00602541-P1Open ↗
08/28/2026B00602653-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00602653-P1Open ↗
09/01/2026B00602653-P2Open ↗
09/01/2026B00602653-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00602541-P1Open ↗
08/28/2026B00602653-P1Open ↗
08/26/2026B00602653-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00602653-P1Open ↗
09/01/2026B00602653-P2Open ↗
09/01/2026B00602653-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00602541-I1Open ↗
08/13/2026B00602653-I1Open ↗