← Back
BROOKLYN
2872 WEST 22ND STREET
BROOKLYN · BIN 3188941
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone AE
Locations of Work
ArchitecturePlumbingGeneral
Roof2p · 1 filing · 7 docs
Bulkhead2p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
1 job · most recent 07/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/30/2026——Gas, Storm, Water/Sanitary
Building Lifecycle
All (44)Filed (2)Objection (40)Special Inspection (2)
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
08/17/2026
Objection raised — Structural
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Inspections
08/13/2026
Objection raised — Admin
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Admin
08/13/2026
Objection raised — Admin
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Inspections
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Fire_Protection
08/13/2026
Objection raised — Inspections
08/13/2026
Objection raised — Fire_Protection
08/13/2026
Objection raised — Zoning
08/13/2026
Objection raised — Inspections
08/13/2026
Objection raised — Zoning
08/13/2026
Objection raised — Scope
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Mechanical
08/13/2026
Objection raised — Inspections
08/13/2026
Objection raised — Admin
08/13/2026
Objection raised — Scope
08/13/2026
Objection raised — Zoning
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
07/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO CONVERT BUILDING FROME ONE TO TWO FAMILY AS PER PLAN
B01411376-S1
07/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO CONVERT BUILDING FROME ONE TO TWO FAMILY AS PER PLAN
B01411376-I1
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/03/2026
Special inspection requirement — Lowest Floor Elevation
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRUST OF GAIL TOSKI PAYNE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESLIE M. GOOD ARCHITECTS207/30/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/03/2026Structural Stability – Alterations of existing buildings—special
06/03/2026Lowest Floor Elevation—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01411376-S1Request digital key ↗
08/16/2026B01411376-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026B01411376-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01411376-S1Open ↗
08/16/2026B01411376-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01411376-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026B01411376-I1Open ↗