One family attached or semi-detached
2018 WEST 10 STREET
BROOKLYN · BIN 3190878
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R4-1Zoning
980 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One family attached or semi-detached · 1,908 sf lot · 0.51 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbing
Roof3p · 2 filings · 19 docs
Floor 23p · 2 filings · 19 docs
Floor 1
Cellar3p · 1 filing · 15 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/30/2015$660K—Private party → Private party$673/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP110/01/2025
AARON MCDONALD ARCHITECT104/02/2024
BILLAH ENGINEERING PLLC112/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS203/21/2026
ECDESIGN STUDIO203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371104/02/2024
Building Lifecycle
All (68)Filed (3)Violation (2)Objection (40)Special Inspection (23)
10/01/2025
Filed — Alteration
REPLACE AND REPLACED EXISTING KITCHEN AND BATHROOM IN CELLAR THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01027084-S1
09/11/2025
Objection resolved — Addressed
05/13/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Cost
04/09/2025
Objection resolved — Addressed
02/04/2025
Objection resolved — Addressed
12/18/2024
Objection resolved — Addressed
10/22/2024
Objection resolved — Addressed
10/22/2024
Objection resolved — Addressed
10/22/2024
Objection resolved — Addressed
10/22/2024
Objection resolved — Addressed
10/22/2024
Objection resolved — Addressed
04/08/2024
Objection raised — Structural
04/08/2024
Objection raised — Zoning
04/08/2024
Objection raised — Scope
04/08/2024
Objection raised — Structural
04/08/2024
Objection raised — Mechanical
04/08/2024
Objection raised — Structural
04/08/2024
Objection raised — Fire_Protection
04/08/2024
Objection raised — Structural
04/08/2024
Objection raised — Admin
04/02/2024
Filed — Alteration
REPLACE AND REPLACED EXISTING KITCHEN AND BATHROOM IN CELLAR THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01027084-I1
03/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
03/29/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Eric Sun
03/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/29/2024
Special inspection requirement — Smoke Control Systems Testing
Eric Sun
03/29/2024
Special inspection requirement — Sprayed fire-resistant materials
Eric Sun
03/29/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Eric Sun
03/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
03/29/2024
Special inspection requirement — Fenestration air leakage
Eric Sun
03/29/2024
Special inspection requirement — Insulation placement and R values
Eric Sun
03/29/2024
Special inspection requirement — Fenestration areas
Eric Sun
03/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
03/29/2024
Special inspection requirement — Structural Wood Frame
Eric Sun
03/29/2024
Special inspection requirement — Preliminary
Eric Sun
03/29/2024
Special inspection requirement — Interior lighting power
Eric Sun
03/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
03/29/2024
Special inspection requirement — Air barrier - visual inspection
Eric Sun
03/29/2024
Special inspection requirement — Maintenance information
Eric Sun
03/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
03/28/2024
Special inspection requirement — Wood – Prefabricated I-Joists
Eric Sun
03/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Sun
03/28/2024
Special inspection requirement — Final
03/28/2024
Special inspection requirement — Mechanical Systems
Eric Sun
02/07/2024
Violation issued (ECB, open)
Construction
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
01/06/2023
Objection raised — Other
Latest 60 of 68 events.
Nothing on file for this building.
1 project · most recent 10/01/2025
Air Conditioning Systems
FiledStatusContractorScope
10/01/2025——Air Conditioning Systems
1 project · most recent 10/01/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/01/2025——Gas, Water/Sanitary
1 project · most recent 10/01/2025
Wood
FiledStatusContractorScope
10/01/2025——Wood
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/29/2024HVAC-R and service water piping design and insulationEric Sunenergy_progress
03/29/2024Exterior Insulation and Finish Systems (EIFS)Eric Sunspecial
03/29/2024Fire-Resistant Penetrations and JointsEric Sunspecial
03/29/2024Smoke Control Systems TestingEric Sunspecial
03/29/2024Sprayed fire-resistant materialsEric Sunspecial
03/29/2024Wall Panels, Curtain Walls, and VeneersEric Sunspecial
03/29/2024Fenestration and door U-factor and product ratingsEric Sunenergy_progress
03/29/2024Fenestration air leakageEric Sunenergy_progress
03/29/2024Insulation placement and R valuesEric Sunenergy_progress
03/29/2024Fenestration areasEric Sunenergy_progress
03/29/2024Energy Code Compliance InspectionsEric Sunprogress
03/29/2024Fire-Resistance Rated ConstructionEric Sunprogress
03/29/2024Structural Wood FrameEric Sunprogress
03/29/2024PreliminaryEric Sunprogress
03/29/2024Interior lighting powerEric Sunenergy_progress
03/29/2024HVAC-R and service water heating equipmentEric Sunenergy_progress
03/29/2024Air barrier - visual inspectionEric Sunenergy_progress
03/29/2024Maintenance informationEric Sunenergy_progress
03/29/2024HVAC-R and service water heating system controlsEric Sunenergy_progress
03/28/2024Wood – Prefabricated I-JoistsEric Sunspecial
03/28/2024Structural Stability – Alterations of existing buildingsEric Sunspecial
03/28/2024Final—progress
03/28/2024Mechanical SystemsEric Sunspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026B01027084-I1Request digital key ↗
08/25/2026B01027084-S1Request digital key ↗
08/14/2026B00806317-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01027084-I1Open ↗
08/13/2026B00806317-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026B01027084-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026B01027084-I1Open ↗
08/25/2026B01027084-S1Open ↗
08/13/2026B00806317-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B01027084-I1Open ↗
08/23/2026B01027084-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01027084-I1Open ↗
08/23/2026B01027084-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B01027084-S1Open ↗
08/25/2026B01027084-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/13/2026B01027084-I1Open ↗
08/13/2026B00806317-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01027084-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01027084-I1Open ↗