← Back
Zoned residential, not Manhattan
2207 EAST 3 STREET
BROOKLYN · BIN 3192903
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R4Zoning
0 sfGross Floor Area
0Units
2 Open Violations ▸FDNY Report ↗
Zoned residential, not Manhattan · 2,000 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 1 filing · 20 docs
Floor 2Under Construction30p · 1 filing · 20 docs
Floor 1Under Construction30p · 1 filing · 20 docs
CellarUnder Construction29p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LUSSO HOME ARTISANS LLC103/22/2026
SARWAY CONSTRUCTION103/22/2026
MOD CONSULTANTS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC301/23/2026
ROBERT SIQECA PE305/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SARWAY CONSTRUCTION LLCGeneral Contractor1007/30/2026
MOD CONSULTANTS LLCGeneral Contractor207/08/2026
BROOKLYN MECH WORKS CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL ENGINEERING &5699501/23/2026
Building Lifecycle
All (115)Filed (6)Permit Issued (13)Violation (7)Inspection (7)Objection (52)Special Inspection (30)
07/29/2026
Permit issued — Structural
B00928773-S2-ST
07/29/2026
Permit issued — Support of Excavation
B00928773-S4-SE
06/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Permit issued — General Construction
B00928773-I1-GC
05/18/2026
Permit issued — Foundation
B00928773-S3-FO
05/18/2026
Permit issued — Construction Fence
B00928773-S1-FN
04/24/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/01/2026
Permit issued — Plumbing
B00928773-S5-PL
01/23/2026
Filed — New Building
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE AT CELLAR FLOOR, FIRST FLOOR, SECOND FLOOR AND ATTIC FLOOR; INSTALLATION OF NEW PLUMBING FIXTURES, COLD AND HOT WATER PIPES, IN CONJUNCTION TO ALT JOBB00928773-I1
B00928773-S5
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT SIQECA
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT SIQECA
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT SIQECA
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT SIQECA
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT SIQECA
01/21/2026
Special inspection requirement — Maintenance information
ROBERT SIQECA
01/21/2026
Special inspection requirement — Permanent certificate
ROBERT SIQECA
12/24/2025
Violation issued (ECB, closed)
Construction
12/24/2025
Violation issued (ECB, open)
Cranes and Derricks
12/24/2025
Violation issued (ECB, open)
Cranes and Derricks
11/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/27/2025
Violation issued (ECB, closed)
Construction
06/18/2025
Permit issued — Structural
B00928773-S2-ST
06/17/2025
Permit issued — Foundation
B00928773-S3-FO
06/17/2025
Permit issued — Construction Fence
B00928773-S1-FN
06/17/2025
Permit issued — General Construction
B00928773-I1-GC
06/16/2025
Permit issued — Support of Excavation
B00928773-S4-SE
06/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2025
Objection resolved — Addressed
05/08/2025
Filed — New Building
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE AT CELLAR FLOOR, FIRST FLOOR, SECOND FLOOR AND ATTIC FLOOR; INSTALLATION OF NEW PLUMBING FIXTURES, COLD AND HOT WATER PIPES, IN CONJUNCTION TO ALT JOBB00928773-I1
B00928773-S2
05/08/2025
Objection raised — Other
05/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT SIQECA
04/01/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Objection raised — Other
03/06/2025
Objection resolved — Addressed
03/04/2025
Filed — New Building
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE AT CELLAR FLOOR, FIRST FLOOR, SECOND FLOOR AND ATTIC FLOOR; INSTALLATION OF NEW PLUMBING FIXTURES, COLD AND HOT WATER PIPES, IN CONJUNCTION TO ALT JOBB00928773-I1
B00928773-S3
03/04/2025
Filed — New Building
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE AT CELLAR FLOOR, FIRST FLOOR, SECOND FLOOR AND ATTIC FLOOR; INSTALLATION OF NEW PLUMBING FIXTURES, COLD AND HOT WATER PIPES, IN CONJUNCTION TO ALT JOBB00928773-I1
B00928773-S4
01/27/2025
Violation issued (ECB, closed)
Construction
01/27/2025
Violation issued (ECB, closed)
Construction
12/06/2024
Special inspection requirement — Structural Wood Frame
ROBERT SIQECA
12/06/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT SIQECA
12/06/2024
Special inspection requirement — Subgrade Inspections
ROBERT SIQECA
12/06/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
12/06/2024
Special inspection requirement — Footing and Foundation
ROBERT SIQECA
12/06/2024
Special inspection requirement — Structural Cold-Formed Steel
ROBERT SIQECA
12/06/2024
Special inspection requirement — Structural Steel - Details
ROBERT SIQECA
12/06/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ROBERT SIQECA
12/06/2024
Special inspection requirement — Structural Steel - Welding
ROBERT SIQECA
12/06/2024
Special inspection requirement — Final
ROBERT SIQECA
11/14/2024
Permit issued — General Construction
B00928773-I1-GC
11/12/2024
Permit issued — Construction Fence
B00928773-S1-FN
02/15/2024
Objection resolved — Addressed
11/28/2023
Objection resolved — Addressed
11/22/2023
Objection raised — Structural
11/22/2023
Objection raised — Other
11/20/2023
Filed — New Building
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE AT CELLAR FLOOR, FIRST FLOOR, SECOND FLOOR AND ATTIC FLOOR; INSTALLATION OF NEW PLUMBING FIXTURES, COLD AND HOT WATER PIPES, IN CONJUNCTION TO ALT JOBB00928773-I1
B00928773-S1
11/17/2023
Objection raised — Zoning
11/17/2023
Objection resolved — Addressed
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSARWAY CONSTRUCTION LLC07/29/2026
DOB NOWSupport of ExcavationPermit IssuedSARWAY CONSTRUCTION LLC07/29/2026
DOB NOWGeneral ConstructionPermit IssuedSARWAY CONSTRUCTION LLC05/18/2026
DOB NOWFoundationPermit IssuedSARWAY CONSTRUCTION LLC05/18/2026
DOB NOWConstruction FencePermit IssuedSARWAY CONSTRUCTION LLC05/18/2026
DOB NOWPlumbingPermit IssuedBROOKLYN MECH WORKS CORP04/01/2026
DOB NOWStructuralPermit IssuedSARWAY CONSTRUCTION LLC06/18/2025
DOB NOWFoundationPermit IssuedSARWAY CONSTRUCTION LLC06/17/2025
DOB NOWConstruction FencePermit IssuedSARWAY CONSTRUCTION LLC06/17/2025
DOB NOWGeneral ConstructionPermit IssuedSARWAY CONSTRUCTION LLC06/17/2025
DOB NOWSupport of ExcavationPermit IssuedSARWAY CONSTRUCTION LLC06/16/2025
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC11/14/2024
DOB NOWConstruction FencePermit IssuedMOD CONSULTANTS LLC11/12/2024
BISEQISSUEDSAL ANDREW CONTRACTING10/23/1998
BIS—ISSUEDSAL ANDREW CONTRACTING10/23/1998
1 job · most recent 01/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/23/2026Permit IssuedBROOKLYN MECH WORKS CORPGas, Storm, Water/Sanitary
1 job · most recent 01/23/2026
Steel Wood
FiledStatusContractorScope
01/23/2026Permit IssuedSARWAY CONSTRUCTION LLCSteel, Wood
1 job · most recent 01/23/2026
Fence
FiledStatusContractorScope
01/23/2026Permit IssuedSARWAY CONSTRUCTION LLCFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Pass-Final PL - UndergroundPassView ↗
11/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
01/21/2026HVAC-R and service water heating equipmentROBERT SIQECAenergy_progress
01/21/2026HVAC-R and service water heating system controlsROBERT SIQECAenergy_progress
01/21/2026HVAC-R and service water piping design and insulationROBERT SIQECAenergy_progress
01/21/2026Fire-Resistant Penetrations and JointsROBERT SIQECAspecial
01/21/2026Energy Code Compliance InspectionsROBERT SIQECAprogress
01/21/2026Maintenance informationROBERT SIQECAenergy_progress
01/21/2026Permanent certificateROBERT SIQECAenergy_progress
05/07/2025Structural Stability – Alterations of existing buildingsROBERT SIQECAspecial
12/06/2024Structural Wood FrameROBERT SIQECAprogress
12/06/2024Excavations - Sheeting, Shoring, and BracingROBERT SIQECAspecial
12/06/2024Subgrade InspectionsROBERT SIQECAspecial
12/06/2024Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
12/06/2024Footing and FoundationROBERT SIQECAprogress
12/06/2024Structural Cold-Formed SteelROBERT SIQECAspecial
12/06/2024Structural Steel - DetailsROBERT SIQECAspecial
12/06/2024Structural Steel - High Strength BoltingROBERT SIQECAspecial
12/06/2024Structural Steel - WeldingROBERT SIQECAspecial
12/06/2024FinalROBERT SIQECAprogress
10/25/2023FireplacesROBERT SIQECAenergy_progress
10/25/2023Electric vehicle service equipment requirementsROBERT SIQECAenergy_progress
10/25/2023Protection of exposed foundation insulationROBERT SIQECAenergy_progress
09/12/2023Air barrier — testing ROBERT SIQECAenergy_progress
09/12/2023Insulation placement and R valuesROBERT SIQECAenergy_progress
09/12/2023Maintenance informationROBERT SIQECAenergy_progress
09/12/2023Air barrier - visual inspectionROBERT SIQECAenergy_progress
Latest 25 of 37.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/18/2026B00928773-S3Request digital key ↗
08/18/2026B00928773-S5Request digital key ↗
08/15/2026B00928773-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00928773-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00928773-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature10
08/27/2026B00928773-S5Open ↗
08/25/2026B00928773-I1Open ↗
08/23/2026B00928773-S4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026B00928773-S5Open ↗
08/27/2026B00928773-S5Open ↗
08/25/2026B00928773-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026B00928773-S4Open ↗
08/18/2026B00928773-I1Open ↗
08/18/2026B00928773-S1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00928773-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/14/2026B00928773-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00928773-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026B00928773-S4Open ↗
08/13/2026B00928773-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00928773-S3Open ↗
08/13/2026B00928773-S4Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/18/2026B00928773-S3Open ↗
08/13/2026B00928773-S4Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026B00928773-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00928773-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00928773-S4Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B00928773-I1Open ↗