← Back
Four families
2212 EAST 7 STREET
BROOKLYN · BIN 3193051
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R5Zoning
3,493 sfGross Floor Area
4Units
Rent Stabilized24 Open Violations ▸FDNY Report ↗
Four families · 3,160 sf lot · 1.11 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Floor 3Under Construction12p · 1 filing · 20 docs
Floor 2Under Construction10p · 1 filing · 20 docs
Floor 1Under Construction10p · 1 filing · 20 docs
CellarUnder Construction14p · 1 filing · 20 docs
1 job · most recent 12/18/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2025Permit IssuedBARUCH BUILDERS CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Carrier 24ABB336A350 36,000 BTU · Condensing Unit ×2
24ABB348A350 48,000 BTU · Condensing Unit ×2
FB4CNF036 36,000 BTU · Fan Coil Indoor ×2
FB4CNF048 48,000 BTU · Fan Coil Indoor ×2
Heating
Burnham ES29 280,000 BTU · Boiler ×1
Ventilation
Greenheck SQ 60D 135 CFM · Exhaust Fan ×4
1 job · most recent 12/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/18/2025Permit IssuedEXPERT PLUMBING & HEATINGGas, Storm, Water/Sanitary
1 job · most recent 12/04/2025
General Wiring
FiledStatusContractorScope
12/04/2025Permit IssuedFORSURE ELECTRIC NY INCGeneral Wiring
1 job · most recent 12/18/2025
Steel Wood
FiledStatusContractorScope
12/18/2025Permit IssuedBARUCH BUILDERS CORPSteel, Wood
1 job · most recent 08/19/2024
Fence
FiledStatusContractorScope
08/19/2024Permit IssuedBARUCH BUILDERS CORPFence
Building Lifecycle
All (150)Filed (9)Permit Issued (9)Violation (49)Inspection (6)Objection (47)Special Inspection (30)
07/15/2026
Permit issued — Construction Fence
B01084327-I1-FN
06/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2026
Violation issued (HPD, open)
A
05/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/13/2026
Permit issued — General Construction
B00980401-I1-GC
04/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
04/08/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
03/19/2026
Permit issued — Sprinklers
B00980401-S1-EW-SP
03/14/2026
Objection resolved — Addressed
03/14/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
02/23/2026
Objection raised — Scope
02/07/2026
Objection resolved — Addressed
01/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/19/2025
Permit issued — Plumbing
B00980401-S7-PL
12/18/2025
Filed — Alteration CO
CONVERT 4 FAMILY RESIDENCE INTO A SINGLE FAMILY RESIDENCE. HORIZONTAL AND VERTICAL ENLARGEMENT. - EXISTING TWO STORY BRICK AND WOOD JOISTS TO REMAIN & BE REPAI
B00980401-S7
11/20/2025
Violation issued (HPD, open)
I
07/29/2025
Permit issued — Construction Fence
B01084327-I1-FN
07/01/2025
Violation issued (ECB, closed)
Construction
06/23/2025
Violation issued (ECB, open)
Construction
06/16/2025
Permit issued — Earth Work
B00980401-S5-FO-EA
06/09/2025
Violation issued (HPD, open)
A
06/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
06/06/2025
Special inspection requirement — Final
Feng Zhang
06/06/2025
Special inspection requirement — Footing and Foundation
MOHAMED MAHMOUD
06/05/2025
Filed — Alteration CO
CONVERT 4 FAMILY RESIDENCE INTO A SINGLE FAMILY RESIDENCE. HORIZONTAL AND VERTICAL ENLARGEMENT. - EXISTING TWO STORY BRICK AND WOOD JOISTS TO REMAIN & BE REPAI
B00980401-P1
06/05/2025
Special inspection requirement — Footing and Foundation
MOHAMED MAHMOUD
06/05/2025
Special inspection requirement — Final
Feng Zhang
06/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
05/30/2025
Filed — Alteration CO
CONVERT 4 FAMILY RESIDENCE INTO A SINGLE FAMILY RESIDENCE. HORIZONTAL AND VERTICAL ENLARGEMENT. - EXISTING TWO STORY BRICK AND WOOD JOISTS TO REMAIN & BE REPAI
B00980401-S5
05/08/2025
Violation issued (ECB, open)
Construction
05/08/2025
Violation issued (ECB, open)
Construction
04/23/2025
Permit issued — General Construction
B00980401-I1-GC
04/23/2025
Permit issued — Structural
B00980401-S4-ST
03/21/2025
Objection resolved — Addressed
03/18/2025
Objection raised — Structural
03/07/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/10/2025
Objection resolved — Addressed
02/10/2025
Objection resolved — Addressed
02/03/2025
Objection raised — Other
02/03/2025
Objection raised — Structural
01/28/2025
Filed — Alteration CO
CONVERT 4 FAMILY RESIDENCE INTO A SINGLE FAMILY RESIDENCE. HORIZONTAL AND VERTICAL ENLARGEMENT. - EXISTING TWO STORY BRICK AND WOOD JOISTS TO REMAIN & BE REPAI
B00980401-S4
01/28/2025
Special inspection requirement — Structural Steel - Details
MOHAMED MAHMOUD
01/27/2025
Objection resolved — Addressed
01/15/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
01/15/2025
Special inspection requirement — Metering
MOHAMED MAHMOUD
01/15/2025
Special inspection requirement — Air barrier — testing
MOHAMED MAHMOUD
01/03/2025
Objection resolved — Addressed
01/03/2025
Special inspection requirement — Fireplaces
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Electric vehicle service equipment requirements
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Permanent certificate
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Protection of exposed foundation insulation
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
12/25/2024
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
Latest 60 of 150 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARUCH BUILDERS303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2023$1.9M—Private party → Private party$530/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEE2000 ARCHITECT P.C.112/18/2025
MSM ENGINEERING SERVICES, PLLC206/05/2025
HESHAM ELSHAMY PE601/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DCS1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BARUCH BUILDERS CORPGeneral Contractor807/16/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
EXPERT PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449406/05/2025
INFINITY DESIGN CONSULTAN2760208/21/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedBARUCH BUILDERS CORP07/15/2026
DOB NOWGeneral ConstructionPermit IssuedBARUCH BUILDERS CORP04/13/2026
DOB NOWSprinklersPermit IssuedARCO PLBG AND HTG INC03/19/2026
DOB NOWPlumbingPermit IssuedEXPERT PLUMBING & HEATING12/19/2025
DOB NOWConstruction FencePermit IssuedBARUCH BUILDERS CORP07/29/2025
DOB NOWEarth WorkPermit IssuedBARUCH BUILDERS CORP06/16/2025
DOB NOWGeneral ConstructionPermit IssuedBARUCH BUILDERS CORP04/23/2025
DOB NOWStructuralPermit IssuedBARUCH BUILDERS CORP04/23/2025
DOB NOWConstruction FencePermit IssuedBARUCH BUILDERS CORP08/27/2024
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/08/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
06/06/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
06/06/2025FinalFeng Zhangprogress
06/06/2025Footing and FoundationMOHAMED MAHMOUDprogress
06/05/2025Footing and FoundationMOHAMED MAHMOUDprogress
06/05/2025FinalFeng Zhangprogress
06/05/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
01/28/2025Structural Steel - DetailsMOHAMED MAHMOUDspecial
01/15/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
01/15/2025MeteringMOHAMED MAHMOUDenergy_progress
01/15/2025Air barrier — testing MOHAMED MAHMOUDenergy_progress
01/03/2025FireplacesMOHAMED MAHMOUDenergy_progress
12/25/2024Electric vehicle service equipment requirementsMOHAMED MAHMOUDenergy_progress
12/25/2024Fenestration air leakageMOHAMED MAHMOUDenergy_progress
12/25/2024Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
12/25/2024Permanent certificateMOHAMED MAHMOUDenergy_progress
12/25/2024Fenestration areasMOHAMED MAHMOUDenergy_progress
12/25/2024Protection of exposed foundation insulationMOHAMED MAHMOUDenergy_progress
12/25/2024Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
12/25/2024Maintenance informationMOHAMED MAHMOUDenergy_progress
12/25/2024Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
10/23/2024Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
10/23/2024Structural Stability – Alterations of existing buildings—special
09/26/2024FinalFeng Zhangprogress
08/20/2024HVAC-R and service water heating system controlsSamy Abouzidenergy_progress
08/20/2024Maintenance informationSamy Abouzidenergy_progress
Latest 25 of 37.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026B00980401-S1Request digital key ↗
08/19/2026B00980401-S5Request digital key ↗
08/19/2026B00980401-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00980401-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
08/30/2026B00980401-S5Open ↗
08/30/2026B00980401-S5Open ↗
08/30/2026B00980401-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026B01084316-I1Open ↗
08/13/2026B01084327-I1Open ↗
08/13/2026B00980401-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00980401-S1Open ↗
09/01/2026B00980401-S1Open ↗
09/01/2026B00980401-S1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026B01084316-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01084316-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01084316-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01084316-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00980401-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00980401-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00980401-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/15/2026B01084316-I1Open ↗
08/13/2026B00980401-S2Open ↗
08/13/2026B00980401-S5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026B00980401-S1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01084316-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00980401-S5Open ↗
▸Other Documents11
▸DOB NOWPlot Diagram3
08/13/2026B00980401-S5Open ↗
08/13/2026B00980401-I1Open ↗
08/13/2026B00980401-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026B01084316-I1Open ↗
08/13/2026B00980401-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01084316-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01084316-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00980401-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00980401-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00980401-S5Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01084316-I1Open ↗