← Back
Large suburban residence
2171 OCEAN PARKWAY
BROOKLYN · BIN 3193062
💬 Discuss this project
1925Year Built
3Stories
A3Building Class
R5Zoning
3,713 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Large suburban residence · 3,445 sf lot · 1.08 FAR built · Flood zone X500
Locations of Work
StructuralFire Protection
Roof1p · 1 filing · 3 docs
Floor 334p · 1 filing · 13 docs
Floor 234p · 1 filing · 13 docs
Floor 136p · 1 filing · 13 docs
Cellar34p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Y LEVY CONTRACTING403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC108/30/2023
M C STRUCTURAL ENGINEERING301/12/2022
A&D ENGINEERING, PLLC112/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAM BERGMAN CONSTRUCTION AND DEVEL403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Y LEVY CONTRACTING CORPGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659101/12/2022
Building Lifecycle
All (39)Filed (5)Permit Issued (1)Violation (6)Objection (7)Special Inspection (20)
12/05/2024
Violation issued (ECB, open)
Construction
12/05/2024
Violation issued (ECB, open)
Construction
08/30/2023
Filed — Alteration
B00919705-I1
09/29/2022
Violation issued (ECB, closed)
Construction
08/28/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/28/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/2022
Objection resolved — Addressed
04/09/2022
Violation issued (ECB, closed)
Construction
01/20/2022
Permit issued — Foundation
B00331716-S1-FO
01/12/2022
Filed — Alteration
B00331716-S1
01/12/2022
Special inspection requirement — Structural Steel - Details
01/12/2022
Special inspection requirement — Concrete - Cast-In-Place
ALBERTO ROMAN
01/12/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ALBERTO ROMAN
01/12/2022
Special inspection requirement — Subgrade Inspections
ALBERTO ROMAN
01/12/2022
Special inspection requirement — Underpinning
ALBERTO ROMAN
01/12/2022
Special inspection requirement — Final
Alfred Mierzejewski
01/12/2022
Special inspection requirement — Footing and Foundation
ALBERTO ROMAN
12/21/2021
Objection resolved — Addressed
12/21/2021
Objection resolved — Addressed
12/21/2021
Special inspection requirement — Concrete - Cast-In-Place
12/16/2021
Objection raised — Admin
12/16/2021
Objection raised — Inspections
12/16/2021
Objection raised — Structural
12/16/2021
Objection raised — Admin
12/15/2021
Filed — Alteration
B00331716-P1
11/17/2021
Special inspection requirement — Structural Steel - High Strength Bolting
11/17/2021
Special inspection requirement — Structural Steel - Welding
11/17/2021
Special inspection requirement — Structural Cold-Formed Steel
11/17/2021
Special inspection requirement — Final
08/10/2020
Filed — Alteration
B00331716-I1
08/04/2020
Special inspection requirement — Post-installed Anchors
08/04/2020
Special inspection requirement — Structural Wood Frame
03/12/2020
Special inspection requirement — Structural Steel - Details
03/12/2020
Special inspection requirement — Structural Steel - Welding
03/12/2020
Special inspection requirement — Final
03/12/2020
Special inspection requirement — Structural Cold-Formed Steel
03/12/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/12/2020
Special inspection requirement — Structural Steel - High Strength Bolting
12/26/2019
Filed — Alteration
B00287517-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedY LEVY CONTRACTING CORP01/20/2022
BISPLISSUEDCAM ENERGY HTG&MECH CORP02/17/2026
BIS—ISSUEDY LEVY CONTRACTING CORP08/19/2025
BIS—ISSUEDY LEVY CONTRACTING CORP08/19/2025
BISEQISSUEDY LEVY CONTRACTING CORP07/28/2025
BIS—ISSUEDY LEVY CONTRACTING CORP09/03/2024
BISEQISSUEDY LEVY CONTRACTING CORP07/17/2024
BIS—ISSUEDY LEVY CONTRACTING CORP07/17/2024
BISPLISSUEDPIPESTYLISTS, INC11/28/2023
BIS—ISSUEDY LEVY CONTRACTING CORP08/18/2023
BISEQISSUEDY LEVY CONTRACTING CORP08/01/2023
BIS—ISSUEDY LEVY CONTRACTING CORP08/01/2023
BIS—ISSUEDY LEVY CONTRACTING CORP08/22/2022
BIS—ISSUEDY LEVY CONTRACTING CORP08/22/2022
BISEQISSUEDY LEVY CONTRACTING CORP08/22/2022
BIS—ISSUEDY LEVY CONTRACTING CORP08/11/2021
BIS—ISSUEDY LEVY CONTRACTING CORP08/11/2021
BIS—ISSUEDY LEVY CONTRACTING CORP08/02/2021
BIS—ISSUEDY LEVY CONTRACTING CORP08/02/2021
BIS—ISSUEDY LEVY CONTRACTING CORP07/01/2021
BISEQISSUEDY LEVY CONTRACTING CORP07/01/2021
BIS—ISSUEDY LEVY CONTRACTING CORP07/01/2021
1 project · most recent 01/14/2024
General Wiring
FiledStatusContractorScope
01/14/2024Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/12/2022Structural Steel - Details—special
01/12/2022Concrete - Cast-In-PlaceALBERTO ROMANspecial
01/12/2022Excavations - Sheeting, Shoring, and BracingALBERTO ROMANspecial
01/12/2022Subgrade InspectionsALBERTO ROMANspecial
01/12/2022UnderpinningALBERTO ROMANspecial
01/12/2022FinalAlfred Mierzejewskiprogress
01/12/2022Footing and FoundationALBERTO ROMANprogress
12/21/2021Concrete - Cast-In-Place—special
11/17/2021Structural Steel - High Strength Bolting—special
11/17/2021Structural Steel - Welding—special
11/17/2021Structural Cold-Formed Steel—special
11/17/2021Final—progress
08/04/2020Post-installed Anchors—special
08/04/2020Structural Wood Frame—progress
03/12/2020Structural Steel - Details—special
03/12/2020Structural Steel - Welding—special
03/12/2020Final—progress
03/12/2020Structural Cold-Formed Steel—special
03/12/2020Structural Stability – Alterations of existing buildings—special
03/12/2020Structural Steel - High Strength Bolting—special
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Structural2
08/31/2026B00331716-I1Request digital key ↗
08/15/2026B00331716-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/31/2026B00331716-S1Request digital key ↗
08/26/2026B00919705-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00287517-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION20
01/06/2026320593256Open ↗
01/02/2026320593256Open ↗
10/28/2025320593256Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION20
02/17/2026320593256Open ↗
04/30/2024320593256Open ↗
11/28/2023320593256Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/17/2025320593256Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/02/2020320593256Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/14/2020320593256Open ↗
▸BISZONING DIAGRAM1
10/13/2020320593256Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/02/2020320593256Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00919705-I1Open ↗
08/13/2026B00331716-P1Open ↗
08/13/2026B00287517-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/22/2022320593256Open ↗
06/24/2021320593256Open ↗
06/10/2021320593256Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00331716-S1Open ↗
08/26/2026B00331716-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00331716-S1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
04/19/2024320593256Open ↗
04/10/2024320593256Open ↗
04/03/2024320593256Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
08/13/2020320593256Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
02/01/2021322007154Open ↗
08/13/2020320593256Open ↗
11/06/2019322007154Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/24/2021320593256Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B00287517-I1Open ↗
08/13/2026B00331716-S1Open ↗
08/13/2026B00331716-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/13/2020320593256Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/22/2022320593256Open ↗
06/24/2021320593256Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/30/2021320593256Open ↗
08/13/2020320593256Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/30/2021320593256Open ↗
10/13/2020320593256Open ↗
10/13/2020320593256Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/30/2021320593256Open ↗
06/24/2021320593256Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
06/10/2021320593256Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
10/13/2020320593256Open ↗
▸BISSOIL REPORT1
10/13/2020320593256Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/30/2021320593256Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/17/2026320593256Open ↗
02/01/2021322007154Open ↗
02/01/2021322007154Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
11/02/2020320593256Open ↗
07/28/2020320593256Open ↗
08/23/2017320593256Open ↗
▸BISBSA/CPC APPROVAL1
04/08/2020320593256Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/14/2020320593256Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION10
11/07/2025320593256Open ↗
05/06/2024320593256Open ↗
05/03/2024320593256Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
08/28/2020320593256Open ↗
11/06/2019322007154Open ↗
08/24/2017320593256Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/01/2021322007154Open ↗
▸BISBOROUGH INTAKE FORM1
04/30/2024320593256Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
09/14/2020320593256Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/13/2020320593256Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00331716-S1Open ↗