← Back
Adult care facility
2922 86 STREET
BROOKLYN · BIN 3194290
💬 Discuss this project
1960Year Built
3Stories
I7Building Class
R5Zoning
3,465 sfGross Floor Area
1Units
12 Open Violations ▸FDNY Report ↗
Adult care facility · 2,145 sf lot · 1.62 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED CEREBRAL PALSY ASSOCIATIO103/21/2026
CEREBRAL PALSY ASSN OF NYS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT PAPAZIAN ARCHITECT PC307/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROBERT PAPAZIAN ARCHITECT PC603/21/2026
Building Lifecycle
All (41)Filed (3)Violation (12)Objection (14)Special Inspection (12)
09/15/2023
Objection resolved — Resolved
08/02/2023
Objection resolved — Resolved
07/20/2023
Objection resolved — Resolved
07/20/2023
Objection resolved — Resolved
07/14/2023
Objection raised — Scope
07/14/2023
Objection raised — Scope
07/14/2023
Objection raised — Scope
07/13/2023
Objection raised — Scope
07/13/2023
Objection raised — Scope
07/12/2023
Objection raised — Scope
07/12/2023
Objection raised — Other
07/12/2023
Objection raised — Scope
07/12/2023
Objection raised — Structural
07/12/2023
Objection raised — Scope
07/07/2023
Filed — Alteration
Installation of new exhaust in proposed bathroom and associated duct and louver.
B00881464-S1
07/07/2023
Filed — Alteration
Installation of new exhaust in proposed bathroom and associated duct and louver.
B00881464-I1
07/07/2023
Filed — Alteration
Installation of new exhaust in proposed bathroom and associated duct and louver.
B00881464-S2
06/06/2023
Special inspection requirement — Insulation placement and R values
06/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/06/2023
Special inspection requirement — Interior lighting power
06/06/2023
Special inspection requirement — Shutoff dampers
06/06/2023
Special inspection requirement — Metering
06/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
06/06/2023
Special inspection requirement — Air barrier - visual inspection
06/06/2023
Special inspection requirement — Fenestration air leakage
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/31/2023
Special inspection requirement — Final
05/31/2023
Special inspection requirement — Mechanical Systems
05/26/2023
Special inspection requirement — Final
Robert Papazian
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
1 project · most recent 07/07/2023
Ventilation Systems
FiledStatusContractorScope
07/07/2023——Ventilation Systems
1 project · most recent 07/07/2023
Water/Sanitary
FiledStatusContractorScope
07/07/2023——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/06/2023Insulation placement and R values—energy_progress
06/06/2023Fire-Resistant Penetrations and Joints—special
06/06/2023Interior lighting power—energy_progress
06/06/2023Shutoff dampers—energy_progress
06/06/2023Metering—energy_progress
06/06/2023Fenestration and door U-factor and product ratings—energy_progress
06/06/2023Air barrier - visual inspection—energy_progress
06/06/2023Fenestration air leakage—energy_progress
06/01/2023Fire-Resistant Penetrations and Joints—special
05/31/2023Final—progress
05/31/2023Mechanical Systems—special
05/26/2023FinalRobert Papazianprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/14/2026B00881464-I1Request digital key ↗
08/14/2026B00881464-S1Request digital key ↗
08/14/2026B00881464-S2Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00881464-S1Open ↗
08/27/2026B00881464-S2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/14/2026B00881464-I1Open ↗
08/14/2026B00881464-S1Open ↗
08/14/2026B00881464-S2Open ↗