← Back
Elevator apt, semi-fireproof without stores
2850 OCEAN PARKWAY
BROOKLYN · BIN 3196300
💬 Discuss this project
1955Year Built
6Stories
D1Building Class
R6Zoning
107,900 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized26 Open Violations 22 unresolved · 4 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 2850 SHORE PARKWAY RLTY CO · 28,400 sf lot · 3.8 FAR built · Flood zone AE
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
CellarUnder Construction5p · 1 filing · 7 docs
1 job · most recent 05/01/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/01/2025Signed-offSERVICE TECH MECH&PLBG INGas, Water/Sanitary
3 jobs · most recent 07/28/2025
Boiler Controls
FiledStatusContractorScope
07/28/2025CompleteLIVE WIRE ELECTRICAL, INCBoiler Controls
05/13/2025Permit IssuedRICHARD NEU—
09/09/2022Permit IssuedTHE METRO GROUP ELECTRIC—
1 job · most recent 05/22/2025
FiledStatusContractorScope
05/22/2025Permit IssuedSAFETECH ENTERPRISES CORP1 scope_items
1 job · most recent 06/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/11/2025Permit IssuedSAFETECH ENTERPRISES CORPSuspended Scaffold (SC)
Building Lifecycle
All (102)Filed (5)Permit Issued (11)Signed Off (2)Violation (60)Inspection (3)Special Inspection (21)
09/01/2026
Permit issued — Sidewalk Shed
B01223848-I1-SH
08/31/2026
Permit issued — Supported Scaffold
B01289654-I1-SF
07/06/2026
Signed off — Alteration
REPLACE GAS BOILER.
B01213496-S1
07/06/2026
Signed off — Alteration
REPLACE GAS BOILER.
B01213496-I1
06/04/2026
Permit issued — Sidewalk Shed
B01223848-I1-SH
06/04/2026
Permit issued — General Construction
B01224435-I1-GC-CX
04/23/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/16/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/11/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/05/2025
Permit issued — Suspended Scaffold
B01236699-I1-SC
06/18/2025
Permit issued — Structural
B01224435-I1-GC-CX
06/13/2025
Permit issued — Suspended Scaffold
B01236699-I1-SC
06/11/2025
Filed — Alteration
Suspended scaffold for facade restoration as shown on plans
B01236699-I1
06/05/2025
Special inspection requirement — Post-installed Anchors
Michael Walsh
06/05/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
06/02/2025
Permit issued — General Construction
B01224435-I1-GC-CX
05/22/2025
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AND GARAGE REAPIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01224435-I1
05/20/2025
Special inspection requirement — Air barrier - visual inspection
Marco Batista
05/15/2025
Permit issued — Plumbing
B01213496-S1-PL
05/15/2025
Permit issued — Boiler Equipment
B01213496-I1-BE
05/12/2025
Permit issued — Sidewalk Shed
B01223848-I1-SH
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
alon egozi
05/12/2025
Special inspection requirement — Post-installed Anchors
alon egozi
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Marco Batista
05/12/2025
Special inspection requirement — Final
Marco Batista
05/12/2025
Special inspection requirement — Masonry
alon egozi
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
05/11/2025
Filed — Alteration
B01223848-I1
05/01/2025
Filed — Alteration
REPLACE GAS BOILER.
B01213496-S1
05/01/2025
Filed — Alteration
REPLACE GAS BOILER.
B01213496-I1
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/29/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
04/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/21/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/21/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
04/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
05/11/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2022
Violation issued (ECB, closed)
Elevators
04/29/2022
Violation issued (ECB, open)
Elevators
02/15/2022
Violation issued (ECB, open)
Elevators
11/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/17/2020
Violation issued (ECB, closed)
Elevators
08/17/2020
Violation issued (ECB, closed)
Elevators
12/30/2019
Violation issued (ECB, closed)
Construction
09/18/2019
Violation issued (ECB, closed)
Elevators
07/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/29/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2019
Violation issued (ECB, closed)
Elevators
04/08/2019
Violation issued (ECB, closed)
Elevators
03/04/2019
Violation issued (HPD, closed)
B
03/04/2019
Violation issued (HPD, closed)
C
03/04/2019
Violation issued (HPD, closed)
B
03/04/2019
Violation issued (HPD, closed)
A
Latest 60 of 102 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFETECH ENTERPRISES809/02/2026
ROTH COHEN REALTY1807/08/2026
2850 SHORE PKWY RLTY CO1603/22/2026
2350 SHORE PARKWAY REALTY103/22/2026
2850 SHORE PARKWAY RLT CO103/22/2026
2850 SHORE PARKWAY RE503/22/2026
R & C MANAGEMENT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING105/22/2025
ASR ENGINEERING PC105/11/2025
NEW YORK ENGINEERING ASSOC., P.C.205/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
NORTHEAST EXPEDITING203/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFETECH ENTERPRISES CORPGeneral Contractor909/02/2026
SERVICE TECH MECH&PLBG INPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745106/11/2025
ASE ENGINEERING PLLC5785105/22/2025
NEW YORK ENGINEERING ASSO851205/01/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP09/01/2026
DOB NOWSupported ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP08/31/2026
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP06/04/2026
DOB NOWGeneral ConstructionPermit IssuedSAFETECH ENTERPRISES CORP06/04/2026
DOB NOWSuspended ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP09/05/2025
DOB NOWStructuralPermit IssuedSAFETECH ENTERPRISES CORP06/18/2025
DOB NOWSuspended ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP06/13/2025
DOB NOWGeneral ConstructionPermit IssuedSAFETECH ENTERPRISES CORP06/02/2025
DOB NOWPlumbingSigned-offSERVICE TECH MECH&PLBG IN05/15/2025
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN05/15/2025
DOB NOWSidewalk ShedPermit IssuedSAFETECH ENTERPRISES CORP05/12/2025
BISOTISSUEDUMER CONSTRUCTION CORP07/02/2015
BISFSISSUEDBETA MECHANICAL INC/ BETTER ENER04/30/1996
BISOTISSUEDBETA MECHANICAL INC/ BETTER ENER04/29/1996
BISPLRE-ISSUEDCROOM PLUMBING & HEATING CORP08/12/1993
BISOTISSUEDHYDRO COMPACTOR INC05/18/1993
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/23/2026Pass-Final PL - UndergroundPassView ↗
04/16/2026Pass-Final PL - UndergroundPassView ↗
03/11/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/05/2025Post-installed AnchorsMichael Walshspecial
06/05/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
05/20/2025Air barrier - visual inspectionMarco Batistaenergy_progress
05/12/2025Tenant Protection Plan Compliancealon egozispecial
05/12/2025Post-installed Anchorsalon egozispecial
05/12/2025Energy Code Compliance InspectionsMarco Batistaprogress
05/12/2025FinalMarco Batistaprogress
05/12/2025Masonryalon egozispecial
05/12/2025Structural Stability – Alterations of existing buildingsalon egozispecial
04/29/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/29/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/29/2025Maintenance informationLOUIS ARENAenergy_progress
04/29/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/21/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
04/21/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/21/2025Heating SystemsLOUIS ARENAspecial
04/21/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/21/2025Maintenance informationLOUIS ARENAenergy_progress
04/21/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/21/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/21/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01213496-I1Request digital key ↗
08/21/2026B01213496-S1Request digital key ↗
08/21/2026B01223848-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/29/2015340275302Open ↗
▸BISWORK PERMIT APPLICATION1
06/29/2015340275302Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01213496-I1Open ↗
08/28/2026B01224435-I1Open ↗
08/28/2026B01224435-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01213496-I1Open ↗
08/28/2026B01224435-I1Open ↗
08/26/2026B01236699-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01223848-I1Open ↗
08/13/2026B01213496-S1Open ↗
08/13/2026B01213496-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/29/2015340275302Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/29/2015340275302Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/29/2015340275302Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B01213496-I1Open ↗
08/13/2026B01213496-S1Open ↗
08/13/2026B01224435-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/29/2015340275302Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/29/2015340275302Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/29/2015340275302Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/29/2015340275302Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/29/2015340275302Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01236699-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01236699-I1Open ↗