DOB01/17/2026AS PER SECTION 28-207.2 STOP ALL WORK UNDER PERMIT # B00352085-I1 ON 10/22/25. DUE TO INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE
ECB05/20/2025TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. ATOI, NOTED THAT NO SWO POSTED ON PROPERTY. FULL SWO ISSUED 2/21/24 FOR VIOS 39106517L, 39106508J, 39106509L, & 39106510Z. SWO HAS BEEN TAKEN$5K due
ECB05/20/2025UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION, NOTED, BRICK EXTERIOR FINISHED, ROOF SHINGLES COMPLETE ON FIRST FLOOR. SCAFFOLDING ADDED TO EXPOSURE 4. CONSTRUCTION FENCE$10K due
ECB08/26/2021UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.NOTED ASTOP WORK ORDER WAS PLACED ON PROPERTY JULY 27,2021 TO STOP ALL WORK AND OBTAIN PERMIT.HOWEVER,I OBSERVED FRESH CONCRETE AT REAR YARD INTO CNothing owed — awaiting certificate of correction
ECB07/27/2021FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF DEMOLITION. AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE OBSERVED,ATEXP#3 THERE WAS A DEMOLISHED GARAGE W/NO NOTIFICATION PROVIDE COMMENCENothing owed — awaiting certificate of correction
ECB07/27/2021WORK W/O PERMIT. AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE OBSERVED EXCAVATION OPERATION INPROGRESS W/HEAVY EQUIPMENT,UPON RESEARCH ON BIS & DOB NOW TO VERIFY THE COMPLIANCE,THE RESEARCH REVEAL THAT,THERENothing owed — awaiting certificate of correction
ECB07/27/2021DEMOLITION WORK W/O REQUIRED DEMOLITION PERMIT. AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE OBSERVED,AT EXP#3 THERE WAS DEMOLITION OF GARRAGE UPON RESEARCH ON BIS & DOB NOW THE RESEARCH REVEAL THAT,THERE WASNothing owed — awaiting certificate of correction
ECB07/27/2021FAILURE TO NOTIFY THE DEPT PRIOR TO THE COMMECEMENT OF EARTHWORK. AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE OBSERVED,EXCAVATION OPERATION IN PROGRESS,UPON RESEARCH ON DEPT SYSTEM BIS & DOB NOW FOR NOTIFICANothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X500