DOB02/18/2026INSTALL APPROX 90 TOTAL LINEAR FT (8FT IN HEIGHT) OF TEMPORARY CONSTRUCTION FENCE PROTECTION TO ENCLOSE HAZARDOUS SITE IMMEDIATELY AS PER CODE (BC 3307.7) -APPROX 35 LINEAR FT AT REAR YARD EXPOSURE-2 -APPROX 20 LINEAR FT AT REAR YARD EXPOSURE-3 -APPROX 35 LINEAR FT AT REAR YARD EXPOSURE-4
ECB02/17/2026VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER .ATOI OBSERVED ON THE 1ST FL AND BASEMENT IMPROPER STORAGE OF GAS CANS AND PROPANE CANISTER NEXT TO COMBUSTIBLE MATERIALS WHILE ON GOIN$2K due
DOB02/17/2026NOTED: ATOI OBSERVED IN THE BASEMENT OF THE HOUSE OF WORDSHIP EXCAVATION IN MULTIPLE LOCATIONS ALONG ITS WALLS WITH UNDER PINNING'S
DOB02/17/2026FULL VACATE ORDER ISSUED FOR THE ENTIRE BUILDING: ATOI OBSERVED IN THE BASEMENT OF THE HOUSE OF WORDSHIP MULTIPLE UNPERMITTED EXCAVATIONS ALONG ITS WALL WITH UNDER PINING'S WHICH IS A HAZZARD AND HAS COMPROMISED THE ENTIRE BUILDING
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
ECB02/17/2026WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL PLUMBING WORK BEING DONE ON THE INTERIOR OF THE HOUSE OF WORDSHIP. ATOI OBSERVED IN THE INTERIOR OF THE HOUSE OF WORDSHIP AT THE FIRST FLOOR STREET LEVEL NEWLY INSTALLEDHearing held — result not yet published$2K proposed
ECB02/17/2026WORK WITHOUT PERMIT. FSWO ISSUED FOR ALL GENERAL CONSTRUCTION. EXCAVATION, MASONRY, CARPENTRY AND STRUCTURAL WORK BEING DONE. ATOI OBSERVED ON THE 1ST FL AND BASEMENT OF THE HOUSE OF WORSHIP NEWLY INSTALLED PARHearing held — result not yet published$2K proposed
ECB02/17/2026WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE INTERIOR OF THE HOUSE OF WORDSHIP. ATOI AT 1PM OBSERVED IN THE INTERIOR OF THE HOUSE OF WORDSHIP AT STREET AND BASEMENT LEVEL NEWLY INSHearing held — result not yet published$2K proposed
Church, synagogue, chapel · Owner of record: OTZAR HATORAH INC. · 1,975 sf lot · 1.26 FAR built · Flood zone X500