One story retail building
3460 NOSTRAND AVENUE
BROOKLYN · BIN 3200249
💬 Discuss this project
2005Year Built
1Stories
K1Building Class
R4Zoning
—Gross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: 3040 NOSTRAND AVE., · 1.22 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BBM CONSTRUCTION109/22/2026
3040 NOSTRAND AVE.,303/22/2026
IBM INDUSTRIES103/22/2026
K F C NATIONAL MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN42 ARCHITECTURE, LLC109/17/2026
Building Lifecycle
All (19)Filed (1)Violation (9)Special Inspection (9)
09/17/2026
Filed — Alteration CO
INTERIOR TENANT ALTERATIONS WITH A CHANGE OF USE AND OCCUPANCY TO A HEALTH AND FITNESS ESTABLISHMENT ON THE CELLAR AND FIRST FLOORS OF AN EXISTING BUILDING. NO CHANGE IN BULK OR EGRESS
B01453353-I1
09/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/14/2026
Special inspection requirement — Energy Code Compliance Inspections
09/14/2026
Special inspection requirement — Lowest Floor Elevation
09/14/2026
Special inspection requirement — Fenestration areas
09/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/14/2026
Special inspection requirement — Air barrier - visual inspection
09/14/2026
Special inspection requirement — Fenestration air leakage
09/14/2026
Special inspection requirement — Interior lighting power
09/14/2026
Special inspection requirement — Lighting controls
05/30/2024
Violation issued (ECB, open)
Construction
07/15/2021
Violation issued (ECB, closed)
Elevators
09/21/2020
Violation issued (FDNY_ORDER, closed)
03/01/2011
Violation issued (FDNY_NOV, closed)
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2006
Violation issued (FDNY_NOV, closed)
05/09/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/04/2005
Violation issued (ECB, closed)
Construction
07/25/1994
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDARCO PLBG AND HTG INC07/12/2005
BISSPISSUEDARCO PLBG AND HTG INC06/08/2005
BISPLISSUEDARCO PLBG AND HTG INC06/08/2005
BISEQISSUEDIBM INDUSTRIES INC06/08/2005
BIS—ISSUEDIBM INDUSTRIES INC01/13/2005
BISEQISSUEDIBM INDUSTRIES INC01/13/2005
BIS—ISSUEDKEL TECH CONST INC12/29/2004
BISFPISSUEDMASTER FIRE PREVENTION SYS INC10/13/1992
BISFPISSUEDLUND FIRE PRODUCTS CO. INC.10/21/1991
BISOTISSUEDVARDARO CONSTRUCTION04/03/1991
BISOTISSUEDVARDARO CONSTRUCTION02/14/1991
BISFPISSUEDLUND FIRE PRODUCTS CO.12/11/1990
1 project · most recent 09/17/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2026——Heating and Air Conditioning Systems, Heating Systems
Heat / Cool
Daikin REYA96AATJA 92,000 BTU · Vrf Outdoor ×1
RXTA60AAVJU 57,500 BTU · Vrf Outdoor ×1
Trane GDK240A3 240,000 BTU · Rooftop Unit ×2
Heating
Qmark CSH07A 3,840 BTU · Electric Heater ×5
CSH-07A 6,800 BTU · Electric Heater ×3
1 project · most recent 09/17/2026
Sprinkler System
FiledStatusContractorScope
09/17/2026——Sprinkler System
1 project · most recent 09/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/17/2026——Gas, Water/Sanitary
1 project · most recent 09/17/2026
FiledStatusContractorScope
09/17/2026——2 scope_items
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/14/2026Fire-Resistant Penetrations and Joints—special
09/14/2026Energy Code Compliance Inspections—progress
09/14/2026Lowest Floor Elevation—progress
09/14/2026Fenestration areas—energy_progress
09/14/2026Fenestration and door U-factor and product ratings—energy_progress
09/14/2026Air barrier - visual inspection—energy_progress
09/14/2026Fenestration air leakage—energy_progress
09/14/2026Interior lighting power—energy_progress
09/14/2026Lighting controls—energy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/22/2026B01453353-S7Request digital key ↗
09/22/2026B01453353-S5Request digital key ↗
09/22/2026B01453353-S6Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/25/2026B01453353-S7Open ↗
09/25/2026B01453353-S5Open ↗
09/25/2026B01453353-S6Open ↗
Showing 3 of 4 on file for this type