← Back
Two family frame
2414 EAST 29 STREET
BROOKLYN · BIN 3203566
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R4Zoning
2,480 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: YD E29 REALTY LLC · 4,000 sf lot · 0.62 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 5 docs
Floor 23p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
1 job · most recent 07/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/13/2026Signed-offXH&RC PLBG AND HTG INCGas, Water/Sanitary
3 jobs · most recent 05/01/2026
General Wiring
FiledStatusContractorScope
05/01/2026Permit IssuedJ Y ELECTRIC INCGeneral Wiring
11/21/2025Permit IssuedJ Y ELECTRIC INCGeneral Wiring
09/11/2025Permit IssuedI.P. ELECTRIC INC—
1 job · most recent 07/13/2026
FiledStatusContractorScope
07/13/2026Signed-offXH&RC PLBG AND HTG INC1 scope_items
Building Lifecycle
All (68)Filed (10)Permit Issued (4)Violation (4)Inspection (4)Objection (16)Special Inspection (30)
08/04/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
07/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
HUI ZENG
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
07/29/2026
Special inspection requirement — Fenestration air leakage
HUI ZENG
07/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
HUI ZENG
07/29/2026
Special inspection requirement — Fenestration areas
HUI ZENG
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
07/13/2026
Filed — Alteration
EXTERIOR RENOVATION TO REMOVE EXISTING SIDING & REPLACE WITH NEW STUCCO FINISH AND INTERIOR RENOVATION OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166512R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01319662-P6
07/13/2026
Filed — Alteration
EXTERIOR RENOVATION TO REMOVE EXISTING SIDING & REPLACE WITH NEW STUCCO FINISH AND INTERIOR RENOVATION OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166512R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01319662-P5
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
HUI ZENG
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
07/13/2026
Special inspection requirement — Fenestration areas
HUI ZENG
07/13/2026
Special inspection requirement — Fenestration air leakage
HUI ZENG
07/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
HUI ZENG
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
07/06/2026
Filed — Alteration
EXTERIOR RENOVATION TO REMOVE EXISTING SIDING & REPLACE WITH NEW STUCCO FINISH AND INTERIOR RENOVATION OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166512R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01319662-P4
07/06/2026
Filed — Alteration
EXTERIOR RENOVATION TO REMOVE EXISTING SIDING & REPLACE WITH NEW STUCCO FINISH AND INTERIOR RENOVATION OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166512R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01319662-P3
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
HUI ZENG
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
06/15/2026
Permit issued — Solar
B01282497-I1-SL
05/07/2026
Filed — Alteration
EXTERIOR RENOVATION TO REMOVE EXISTING SIDING & REPLACE WITH NEW STUCCO FINISH AND INTERIOR RENOVATION OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166512R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01319662-P1
05/07/2026
Filed — Alteration
EXTERIOR RENOVATION TO REMOVE EXISTING SIDING & REPLACE WITH NEW STUCCO FINISH AND INTERIOR RENOVATION OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166512R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01319662-P2
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2026
Permit issued — Plumbing
B01319662-S1-PL
04/06/2026
Permit issued — General Construction
B01319662-I1-GC
01/15/2026
Objection resolved — Addressed
01/15/2026
Objection resolved — Addressed
01/09/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Scope
12/12/2025
Objection raised — Cost
12/12/2025
Objection raised — Other
12/11/2025
Objection raised — Plumbing
12/11/2025
Objection raised — Mechanical
12/11/2025
Objection raised — Other
12/11/2025
Objection raised — Scope
12/11/2025
Objection raised — Other
11/26/2025
Filed — Alteration
EXTERIOR RENOVATION TO REMOVE EXISTING SIDING & REPLACE WITH NEW STUCCO FINISH AND INTERIOR RENOVATION OF EXISTING 2 FAMILY 2 STORY W/ CELLAR BUILDING TO CORRECT ECB VIOLATION #39166512R. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01319662-S1
Latest 60 of 68 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YD E29 REALTY1308/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2025$1.3M—— → —$514/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABC ENGINEERING PLLC807/13/2026
HUI ZENG105/07/2026
CHUN FENG, ARCHITECT109/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC ENGINEERING PLLC603/21/2026
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERGY SOLAR INCGeneral Contractor207/08/2026
TLS CONSTRUCTION GROUP I*General Contractor107/05/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABC ENGINEERING PLLC1515407/13/2026
SQ. ARCH, LLC4802109/14/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAMERGY SOLAR INC06/15/2026
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC04/08/2026
DOB NOWGeneral ConstructionSigned-offTLS CONSTRUCTION GROUP I*04/06/2026
DOB NOWSolarPermit IssuedAMERGY SOLAR INC09/23/2025
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/04/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/29/2026HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
07/29/2026Energy Code Compliance InspectionsHUI ZENGprogress
07/29/2026Fire-Resistance Rated ConstructionHUI ZENGprogress
07/29/2026HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
07/29/2026HVAC-R and service water heating equipmentHUI ZENGenergy_progress
07/29/2026HVAC-R and service water heating system controlsHUI ZENGenergy_progress
07/29/2026Energy Code Compliance InspectionsHUI ZENGprogress
07/29/2026Fire-Resistant Penetrations and JointsHUI ZENGspecial
07/29/2026Fenestration air leakageHUI ZENGenergy_progress
07/29/2026Fenestration and door U-factor and product ratingsHUI ZENGenergy_progress
07/29/2026Fenestration areasHUI ZENGenergy_progress
07/29/2026HVAC-R and service water heating equipmentHUI ZENGenergy_progress
07/29/2026HVAC-R and service water heating system controlsHUI ZENGenergy_progress
07/13/2026Energy Code Compliance InspectionsHUI ZENGprogress
07/13/2026Fire-Resistance Rated ConstructionHUI ZENGprogress
07/13/2026HVAC-R and service water heating equipmentHUI ZENGenergy_progress
07/13/2026HVAC-R and service water heating system controlsHUI ZENGenergy_progress
07/13/2026HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
07/13/2026Fenestration areasHUI ZENGenergy_progress
07/13/2026Fenestration air leakageHUI ZENGenergy_progress
07/13/2026Fenestration and door U-factor and product ratingsHUI ZENGenergy_progress
07/13/2026HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
07/13/2026HVAC-R and service water heating equipmentHUI ZENGenergy_progress
07/13/2026HVAC-R and service water heating system controlsHUI ZENGenergy_progress
07/13/2026Fire-Resistant Penetrations and JointsHUI ZENGspecial
Latest 25 of 39.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026B01282497-I1Request digital key ↗
08/20/2026B01282497-P1Request digital key ↗
08/20/2026B01314603-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 17
08/17/2026B01319662-P3Open ↗
08/17/2026B01319662-P6Open ↗
08/17/2026B01319662-P5Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature36
09/01/2026B01319662-P6Open ↗
09/01/2026B01319662-P6Open ↗
09/01/2026B01319662-P6Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026B01282497-P1Open ↗
08/20/2026B01282497-I1Open ↗
08/17/2026B01319662-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01319662-P6Open ↗
08/23/2026B01319662-S1Open ↗
08/23/2026B01319662-P2Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/20/2026B01282497-I1Open ↗
08/20/2026B01282497-P1Open ↗
08/17/2026B01319662-P6Open ↗
Showing 3 of 10 on file for this type