← Back
Elevator cooperative
740 EAST 32 STREET
BROOKLYN · BIN 3205945
💬 Discuss this project
1963Year Built
6Stories
D4Building Class
R6AZoning
47,670 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized27 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 720-740 APT INC · 12,000 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLASSIC CONSULTING GROUP607/08/2026
DSJ MANAGEMENT807/08/2026
720-740 APT403/22/2026
720 740 APARTMENT INC103/22/2026
ACCESS SOLUTIONS GROUP L103/22/2026
SASCO CONSTRTN ENTERPRISE103/21/2026
20 50 REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EOC-NY112/16/2025
ARQUITECTURA VARELA112/07/2021
KN3 ENGINEERING LLC110/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
MMSR CONSULTING GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLASSIC CONSULTING GROUPGeneral Contractor707/08/2026
RICHARD NEUElectrical103/22/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
AZI CONSTRUCTION CORPGeneral Contractor104/09/2026
N.T. HOQUE CONTRACTING LLGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMPIRE DESIGN CORP5474112/16/2025
EOC-NY6548112/16/2025
LEO Y LEE ASSOCIATES2481110/06/2021
Building Lifecycle
All (92)Filed (3)Permit Issued (6)Signed Off (3)Facade (FISP) (15)Violation (59)Special Inspection (6)
05/24/2026
Violation issued (HPD, open)
B
05/24/2026
Violation issued (HPD, open)
B
05/24/2026
Violation issued (HPD, open)
B
05/24/2026
Violation issued (HPD, open)
B
05/24/2026
Violation issued (HPD, open)
B
05/24/2026
Violation issued (HPD, open)
B
04/11/2026
Violation issued (HPD, closed)
B
04/11/2026
Violation issued (HPD, closed)
B
04/11/2026
Violation issued (HPD, closed)
B
03/11/2026
Signed off — Alteration
GARAGE RESTORATION AS PER PLANS
B01328684-I1
02/19/2026
Violation issued (HPD, open)
B
01/14/2026
Permit issued — General Construction
B01328684-I1-GC
12/16/2025
Filed — Alteration
GARAGE RESTORATION AS PER PLANS
B01328684-I1
12/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Md Rashid
12/04/2025
Special inspection requirement — Concrete - Cast-In-Place
David Merabyan
12/04/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
David Merabyan
12/04/2025
Special inspection requirement — Post-installed Anchors
David Merabyan
12/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
12/04/2025
Special inspection requirement — Final
David Merabyan
11/11/2025
Violation issued (HPD, closed)
A
11/11/2025
Violation issued (HPD, closed)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, closed)
B
10/17/2025
Violation issued (HPD, open)
C
10/17/2025
Violation issued (HPD, closed)
C
10/17/2025
Violation issued (HPD, open)
C
10/17/2025
Violation issued (HPD, open)
B
10/17/2025
Violation issued (HPD, open)
B
10/17/2025
Violation issued (HPD, closed)
C
10/17/2025
Violation issued (HPD, open)
C
10/17/2025
Violation issued (HPD, open)
C
10/17/2025
Violation issued (HPD, open)
C
03/19/2025
Violation issued (HPD, open)
C
03/19/2025
Violation issued (HPD, open)
C
03/19/2025
Violation issued (HPD, open)
B
01/13/2025
Violation issued (FDNY_NOV, closed)
11/26/2024
Violation issued (HPD, closed)
I
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
B
10/09/2023
Signed off — Alteration
B00643518-I1
09/20/2023
Cycle 9 facade report signed — SAFE
09/04/2023
Cycle 9 facade inspection completed
08/28/2023
Permit issued — Sidewalk Shed
B00643518-I1-SH
08/03/2023
Violation issued (ECB, closed)
Construction
07/23/2023
Cycle 9 facade report submitted
03/22/2023
Violation issued (HPD, closed)
A
12/16/2022
Signed off — Alteration
B00597708-I1
11/29/2022
Violation issued (HPD, closed)
B
11/29/2022
Violation issued (HPD, closed)
C
11/29/2022
Violation issued (HPD, closed)
A
11/29/2022
Violation issued (HPD, closed)
B
11/29/2022
Violation issued (HPD, closed)
C
11/29/2022
Violation issued (HPD, closed)
B
09/07/2022
Permit issued — Sidewalk Shed
B00643518-I1-SH
07/16/2022
Permit issued — Sidewalk Shed
B00643518-I1-SH
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
02/22/2022
Cycle 9 facade report signed — UNSAFE
02/21/2022
Cycle 9 facade report submitted
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAZI CONSTRUCTION CORP01/14/2026
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP08/28/2023
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/07/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP07/16/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP12/08/2021
DOB NOWGeneral ConstructionSigned-offN.T. HOQUE CONTRACTING LL12/01/2021
BISSPISSUEDA + SPRINKLER CORP09/25/2018
BISPLISSUEDKATAN P & H INC07/06/2018
BISEQISSUEDSASCO CONSTRUCTION ENTER10/07/2011
BISFSISSUEDA L EASTMOND & SONS INC08/21/2001
BISSPISSUEDSPARACO'S P&H CORP11/17/1994
BISSPISSUEDCROOM PLUMBING & HEATING CORP.09/23/1993
BISPLISSUEDCROOM PLUMBING & HEATING CORP.09/23/1993
BISOTISSUEDPHOENIX COMBUSTION CORP05/21/1993
1 project · most recent 12/16/2021
FiledStatusContractorScope
12/16/2021Permit IssuedRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/04/2025Tenant Protection Plan ComplianceMd Rashidspecial
12/04/2025Concrete - Cast-In-PlaceDavid Merabyanspecial
12/04/2025Mastic and Intumescent Fire-resistant CoatingsDavid Merabyanspecial
12/04/2025Post-installed AnchorsDavid Merabyanspecial
12/04/2025Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
12/04/2025FinalDavid Merabyanprogress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00597708-I1Request digital key ↗
08/31/2026B00643518-I1Request digital key ↗
08/19/2026B01328684-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
12/05/2018321551209Open ↗
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
09/26/2018321833986Open ↗
07/09/2018321551209Open ↗
09/26/2013340086604Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/10/2019321833986Open ↗
11/16/2018321833986Open ↗
09/12/2018321833986Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
10/12/2011320369436Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
09/26/2013340086604Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00597708-I1Open ↗
08/31/2026B00643518-I1Open ↗
08/19/2026B01328684-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01328684-I1Open ↗
08/28/2026B01328684-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/26/2013340086604Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/26/2013340086604Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/12/2011320369436Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B01328684-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00597708-I1Open ↗
08/19/2026B01328684-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/12/2011320369436Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/10/2019321833986Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/10/2019321833986Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/26/2013340086604Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
03/27/2014340086604Open ↗
01/10/2019321833986Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/27/2014340086604Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/12/2011320369436Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/10/2019321833986Open ↗
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
09/12/2018321833986Open ↗
05/03/2017321551209Open ↗
10/12/2011320369436Open ↗
▸BISBOROUGH INTAKE FORM2
01/10/2019321833986Open ↗
12/05/2018321551209Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/26/2013340086604Open ↗