← Back
Two family converted from one family
864 EAST 35 STREET
BROOKLYN · BIN 3206049
💬 Discuss this project
1915Year Built
2.5Stories
B3Building Class
R6Zoning
1,728 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof5p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ENVISION DESIGN & CONST303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.606/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ENVISION DESIGN & CONST LGeneral Contractor1007/08/2026
ZONE PLUMBING & HEATING CPlumbing707/08/2026
MICHAEL SOOKHAIElectrical103/21/2026
5 BOROS PLUMBINGGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781506/24/2024
Building Lifecycle
All (58)Filed (6)Permit Issued (5)Signed Off (3)Violation (3)Inspection (7)Objection (4)Special Inspection (30)
09/03/2025
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-I1
08/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/17/2025
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-S1
06/28/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
06/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
06/24/2024
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-P3
06/21/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
06/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
06/21/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
06/21/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
06/21/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/21/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
01/04/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/07/2023
Objection raised — Scope
04/07/2023
Objection resolved — Addressed
04/05/2023
Objection raised — Scope
04/05/2023
Objection resolved — Addressed
04/04/2023
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-P1
04/04/2023
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-P2
02/08/2023
Permit issued — Foundation
B00556317-I1-GC-CX
02/08/2023
Permit issued — General Construction
B00556317-I1-GC-CX
02/02/2023
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-S2
01/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/25/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/15/2022
Permit issued — Construction Fence
B00556317-S2-FN
07/13/2022
Permit issued — Plumbing
B00556317-S1-PL
06/21/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Violation issued (ECB, closed)
Construction
08/05/2021
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-S1
08/03/2021
Permit issued — Construction Fence
B00556317-S2-FN
08/02/2021
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-S2
07/29/2021
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION # B00556317-I1.
B00556317-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offENVISION DESIGN & CONST L02/08/2023
DOB NOWGeneral ConstructionSigned-offENVISION DESIGN & CONST L02/08/2023
DOB NOWConstruction FenceSigned-offENVISION DESIGN & CONST L07/15/2022
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/13/2022
DOB NOWConstruction FenceSigned-offENVISION DESIGN & CONST L08/03/2021
1 project · most recent 07/26/2022
General Wiring
FiledStatusContractorScope
07/26/2022Permit IssuedINFINITI ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/04/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
06/28/2024Subgrade InspectionsCHRISTIAN LOZADAspecial
06/28/2024MasonryCHRISTIAN LOZADAspecial
06/28/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
06/28/2024Heating SystemsCHRISTIAN LOZADAspecial
06/28/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/28/2024Mechanical SystemsCHRISTIAN LOZADAspecial
06/28/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
06/28/2024FinalCHRISTIAN LOZADAprogress
06/28/2024Footing and FoundationCHRISTIAN LOZADAprogress
06/28/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/28/2024Structural Wood FrameCHRISTIAN LOZADAprogress
06/28/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
06/28/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
06/28/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/28/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/28/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/28/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
06/28/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
06/28/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/28/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
06/28/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
06/28/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
06/28/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
06/21/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
06/21/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
Latest 25 of 75.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00556317-S1Request digital key ↗
09/01/2026B00556317-I1Request digital key ↗
09/01/2026B00556317-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00556317-P2Open ↗
08/13/2026B00556317-P3Open ↗
08/13/2026B00556317-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
08/30/2026B00556317-P2Open ↗
08/30/2026B00556317-P2Open ↗
08/24/2026B00556317-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00556317-S1Open ↗
09/01/2026B00556317-P3Open ↗
09/01/2026B00556317-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026B00556317-P2Open ↗
08/24/2026B00556317-P3Open ↗
08/24/2026B00556317-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00556317-S1Open ↗
09/01/2026B00556317-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00556317-S1Open ↗
08/13/2026B00556317-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026B00556317-P3Open ↗
08/13/2026B00556317-P2Open ↗
08/13/2026B00556317-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00556317-I1Open ↗
08/13/2026B00556317-P2Open ↗
08/13/2026B00556317-P3Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00556317-I1Open ↗
08/13/2026B00556317-P2Open ↗
08/13/2026B00556317-P3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00556317-I1Open ↗