← Back
Elevator apt, semi-fireproof without stores
3115 AVENUE I
BROOKLYN · BIN 3206442
💬 Discuss this project
1935Year Built
6Stories
D1Building Class
R6Zoning
84,600 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized55 Open Violations 54 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: KINGS & I ASSETS LLC · 18,000 sf lot · 4.7 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
CellarUnder Construction2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JJS BUILDERS407/08/2026
JASCO, INC503/22/2026
KINGS & I ASSETS LLC2103/22/2026
KINGS & 1 ASSETS LLC103/22/2026
MALLOUK ELIAS REALTY C203/22/2026
MALLOUK REALTY103/22/2026
ELIAS MALLOUK RLTY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOORE ASSOCIATES, LLC105/20/2026
INSITE DESIGN STUDIO105/16/2023
ASR ENGINEERING PC112/22/2022
GREEN DESIGN104/25/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATLANTIC BUILDING SUPPLY INC.203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJS BUILDERSGeneral Contractor407/08/2026
JASCO, INCGeneral Contractor303/21/2026
CITY PLUMBING INCPlumbing108/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOORE ENG. OF NY, DPC9134105/20/2026
Building Lifecycle
All (81)Filed (4)Permit Issued (4)Signed Off (1)Facade (FISP) (6)Violation (60)Objection (2)Special Inspection (4)
08/26/2026
Permit issued — Plumbing
B01383517-I1-PL
06/30/2026
Objection resolved — Resolved
06/12/2026
Objection raised — Scope
05/26/2026
Violation issued (HPD, closed)
B
05/26/2026
Violation issued (HPD, closed)
B
05/26/2026
Violation issued (HPD, closed)
C
05/26/2026
Violation issued (HPD, closed)
C
05/26/2026
Violation issued (HPD, closed)
C
05/26/2026
Violation issued (HPD, closed)
B
05/26/2026
Violation issued (HPD, closed)
C
05/26/2026
Violation issued (HPD, closed)
C
05/26/2026
Violation issued (HPD, closed)
C
05/20/2026
Filed — Alteration
INSTALL WASHER AND DRYERS FOR BUILDING TENANT'S ACCESSORY USE AT CELLAR. WORK INCLUDES PLUMBING PIPING, NEW SPRINKLER HEADS OFF EXISTING DOMESTIC WATER SYSTEM, AND DRYER VENTING. ALL AS PER PLAN. NO CHANGE IN EGRESS USE OR OCCUPANCY.
B01383517-I1
05/20/2026
Violation issued (HPD, open)
C
05/08/2026
Violation issued (HPD, closed)
C
05/06/2026
Violation issued (HPD, closed)
B
05/06/2026
Violation issued (HPD, closed)
B
05/06/2026
Violation issued (HPD, closed)
A
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miguel Armijos
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Miguel Armijos
02/10/2026
Violation issued (HPD, closed)
A
02/10/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
B
01/28/2026
Violation issued (HPD, closed)
B
01/20/2026
Violation issued (HPD, closed)
C
01/20/2026
Violation issued (HPD, closed)
B
01/20/2026
Violation issued (HPD, closed)
C
11/18/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (HPD, open)
C
11/14/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (HPD, closed)
B
10/17/2025
Violation issued (HPD, open)
C
10/08/2025
Violation issued (HPD, open)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, closed)
C
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, closed)
C
08/08/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, closed)
A
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCITY PLUMBING INC08/26/2026
DOB NOWSidewalk ShedSigned-offJASCO, INC12/22/2022
DOB NOWSidewalk ShedPermit IssuedJJS BUILDERS08/14/2018
DOB NOWSidewalk ShedPermit IssuedJJS BUILDERS04/26/2018
BISOTISSUEDSONY NY MGMT & CONST CORP07/05/2018
BISFSISSUEDSTAR INDUSTRIAL SERVICE CO INC05/08/1998
BISPLISSUEDJOSEPH FERRIGNO PLUMBING & HEATI05/08/1998
BISOTISSUEDINTERCITY HEAT & BURNER SERV CO.12/13/1995
BISFSISSUEDNEAL M. RUDIKOFF12/12/1995
1 project · most recent 05/20/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
05/20/2026Permit IssuedCITY PLUMBING INCGas, Plumbing-Sprinkler, Water/Sanitary
4 projects · most recent 12/23/2022
FiledStatusContractorScope
12/23/2022Permit IssuedRICHARD NEU—
03/03/2020CompleteNEW PHASE ELEC'L CONTR'S—
02/05/2020CompleteELECTL CONTG SOLUTIONS CO—
04/25/2018Permit Issued4000 ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/29/2026Fire-Resistant Penetrations and JointsMiguel Armijosspecial
04/29/2026Tenant Protection Plan ComplianceMiguel Armijosspecial
02/27/2023Tenant Protection Plan Compliance—special
01/10/2023FinalJAMES CORNEJOprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026B00038016-I1Request digital key ↗
08/28/2026B00803188-I1Request digital key ↗
08/27/2026B00810502-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/21/2018340613731Open ↗
▸BISWORK PERMIT APPLICATION1
07/05/2018340613731Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026B00038016-I1Open ↗
08/27/2026B00810502-I1Open ↗
08/16/2026B01383517-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B01383517-I1Open ↗
08/30/2026B01383517-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/21/2018340613731Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/21/2018340613731Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/21/2018340613731Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/03/2019340613731Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B00810502-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/21/2018340613731Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00810502-I1Open ↗
08/15/2026B01383517-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/21/2018340613731Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/21/2018340613731Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/03/2019340613731Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/21/2018340613731Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/03/2019340613731Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/21/2018340613731Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/03/2019340613731Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/03/2019340613731Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/03/2019340613731Open ↗
06/21/2018340613731Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/21/2018340613731Open ↗
▸BISBOROUGH INTAKE FORM1
01/03/2019340613731Open ↗