DOB03/16/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/29/2021CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. AT THE TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION SITE,WORK AT FOUNDATION & EXCAVATION IN PROGRESS. WHEN ASKED FOR THE FOLLOWING DOCUMENTS FOR$7K due
ECB10/29/2021FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION-MISSING GUARDRAILS. AT THE TIME OF INSPECTION I OBSERVED,EXCAVATION OF EARTH AT EXP#3 REAR OF BLDG IN PROGRESS. THE DEPTH IF EXCAVATION WAS APPROX 8 FEET. I$4K due
ECB12/22/2021UNLAWFUL ACTS-FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.AT THE TIME OF INSPECTION AT A 3 STORY BUILDING UNDER ALTERATION WITH PARTIAL STOPWORK ORDER,OBSERVED APPROX 5FT DEEP EXCAVATION AT EXP3.UPON RESEARCH ONothing owed — awaiting certificate of correction
ECB10/29/2021WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AT THE TIME OF INSPECTION,I OBSERVED EXCAVATION OF EARTH FOR NEW FOUNDATION AT EXP#3 OF BLDG APPROX 8 FEET IN DEPTH FROM THE GRANothing owed — awaiting certificate of correction
ECB10/29/2021FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AT THE TIME OF INSPECTION,I OBSERVED ACTIVE CONSTRUCTION SITE,EARTHEXCAVATION IN PROGRESS. WHEN ASKED FOR THE FOLLOWING DOCUMENTS NONE WANothing owed — awaiting certificate of correction
ECB10/29/2021FAILURE TO NOTIFY THE DEPT PRIOR TO THE COMMENCEMENT OF EARTHWORK. AT THE TIME OF INSPECTION,I SAW EXCAVATION FOR THE NEW FOUNDATION AT EXP#3 DEPTH OF EXCAVATION APPROX 8 FEET WHEN ASKED FOR THE NOTIFICATION #Nothing owed — awaiting certificate of correction
ECB10/29/2021SEC. BC3307.7 INADEQUATE CONSTRUCTION FENCE AT EXP#2&3. AT THE TIME OFINSPECTION,I OBERVED ACTIVE CONSTRUCTION SITE,EXCAVATION FOR NEW FOUNDATION IN PROGRESS AT EXP#3. WALKING AROUND THE PERIMETER OF THE JOB SINothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 4,000 sf lot · 1 FAR built · Flood zone X