← Back
Two stories - detached, small or mid-size
1022 EAST 29 STREET
BROOKLYN · BIN 3207802
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4Zoning
1,620 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Architecture
Floor 26p · 1 filing · 18 docs
Floor 17p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PDG BUILDING CONSULTANTS LLC1809/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/01/2021$950K—— → —$586/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.406/23/2026
MIB CONSULTING205/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC603/21/2026
4444 PPPP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MBW CONSTRUCTION INCGeneral Contractor708/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARKANICS CORP4600103/29/2022
Building Lifecycle
All (46)Filed (6)Permit Issued (5)Violation (1)Objection (25)Special Inspection (9)
08/06/2026
Permit issued — General Construction
B01420670-I1-GC
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/23/2026
Filed — Alteration
Repair /replacement of existing rear-yard deck and fence as necessary to comply with TPPN #4/03. This application is being filed in connection with Violation No. 39190409Z to obtain permits for the existing deck and fence. No change in use egress or occup
B01420670-I1
06/08/2026
Filed — Alteration
B01410946-I1
05/29/2026
Violation issued (ECB, open)
Construction
04/14/2025
Permit issued — General Construction
B00718396-S1-GC
08/23/2024
Filed — Alteration
Complete the Stucco and replacement of front porch originally approved under JN B00718396-I1 as per plans filed. No change in use egress or occupancy
B00718396-P1
08/23/2024
Special inspection requirement — Final
PRAMODRAY SHAH
04/09/2024
Permit issued — General Construction
B00718396-S1-GC
10/16/2023
Permit issued — General Construction
B00718396-S1-GC
10/12/2023
Filed — Alteration
Complete the Stucco and replacement of front porch originally approved under JN B00718396-I1 as per plans filed. No change in use egress or occupancy
B00718396-S1
05/25/2022
Permit issued — General Construction
B00718396-I1-GC
05/23/2022
Objection resolved — Addressed
05/11/2022
Objection resolved — Addressed
05/09/2022
Objection raised — Zoning
05/09/2022
Objection raised — Zoning
05/09/2022
Objection resolved — Addressed
05/09/2022
Objection raised — Zoning
05/09/2022
Objection raised — Other
05/09/2022
Objection resolved — Addressed
05/09/2022
Objection raised — Fire_Protection
05/09/2022
Objection resolved — Addressed
05/09/2022
Objection raised — Zoning
05/09/2022
Objection resolved — Addressed
05/04/2022
Filed — Alteration
Complete the Stucco and replacement of front porch originally approved under JN B00718396-I1 as per plans filed. No change in use egress or occupancy
B00718396-I1
04/13/2022
Special inspection requirement — Final
Stanley Mayerfeld
04/04/2022
Objection raised — Scope
03/31/2022
Objection raised — Scope
03/31/2022
Objection resolved — Resolved
03/29/2022
Filed — Alteration
PROPOSE TO PROVIDE PLANS TO REPLACE EXISTING FRONT PORCH WITH NEW INCLUDING NEW FRONT DOOR AND NEW WINDOWS AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY FOR THIS APPLICATION.
B00708023-I1
03/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malcolm Barkan
03/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malcolm Barkan
03/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Malcolm Barkan
03/28/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Malcolm Barkan
03/28/2022
Special inspection requirement — Air barrier - visual inspection
Malcolm Barkan
03/28/2022
Special inspection requirement — Fenestration air leakage
Malcolm Barkan
03/28/2022
Special inspection requirement — Fenestration areas
Malcolm Barkan
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMBW CONSTRUCTION INC08/06/2026
DOB NOWGeneral ConstructionPermit IssuedMBW CONSTRUCTION INC04/14/2025
DOB NOWGeneral ConstructionPermit IssuedMBW CONSTRUCTION INC04/09/2024
DOB NOWGeneral ConstructionPermit IssuedMBW CONSTRUCTION INC10/16/2023
DOB NOWGeneral ConstructionPermit IssuedMBW CONSTRUCTION INC05/25/2022
1 project · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/23/2024FinalPRAMODRAY SHAHprogress
04/13/2022FinalStanley Mayerfeldprogress
03/28/2022Fire-Resistant Penetrations and JointsMalcolm Barkanspecial
03/28/2022Structural Stability – Alterations of existing buildingsMalcolm Barkanspecial
03/28/2022Energy Code Compliance InspectionsMalcolm Barkanprogress
03/28/2022Fenestration and door U-factor and product ratingsMalcolm Barkanenergy_progress
03/28/2022Air barrier - visual inspectionMalcolm Barkanenergy_progress
03/28/2022Fenestration air leakageMalcolm Barkanenergy_progress
03/28/2022Fenestration areasMalcolm Barkanenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026B00718396-P1Request digital key ↗
08/24/2026B00718396-P2Request digital key ↗
08/24/2026B00718396-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00718396-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00718396-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026B00718396-P2Open ↗
08/24/2026B00718396-S1Open ↗
08/16/2026B01410946-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B00718396-P2Open ↗
08/23/2026B00718396-I1Open ↗
08/22/2026B00718396-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B00718396-P2Open ↗
08/24/2026B00718396-S1Open ↗
08/13/2026B00718396-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWPlot Diagram1
08/13/2026B00718396-I1Open ↗