← Back
Two stories - detached, small or mid-size
1233 EAST 22 STREET
BROOKLYN · BIN 3208378
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R2Zoning
2,288 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Architecture
Roof8p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC512/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM RENOVATIONS 1 LLGeneral Contractor607/08/2026
BROOKLYN MECH WORKS CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129212/03/2025
MSM ENGINEERING SERVICES,8449206/22/2023
Building Lifecycle
All (75)Filed (5)Permit Issued (6)Signed Off (1)Violation (1)Inspection (8)Objection (38)Special Inspection (16)
05/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2026
Signed off — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB
B00876709-S2
05/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/03/2025
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB
B00876709-P2
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
12/01/2025
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
10/28/2025
Permit issued — Plumbing
B00876709-S2-PL
05/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
04/10/2025
Objection raised — Inspections
04/10/2025
Objection raised — Scope
03/31/2025
Objection resolved — Addressed
03/28/2025
Permit issued — General Construction
B00876709-I1-GC
03/26/2025
Objection raised — Scope
03/25/2025
Permit issued — Construction Fence
B00876709-S1-FN
03/19/2025
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB
B00876709-P1
01/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/16/2024
Permit issued — Plumbing
B00876709-S2-PL
03/28/2024
Permit issued — General Construction
B00876709-I1-GC
03/28/2024
Permit issued — Construction Fence
B00876709-S1-FN
09/20/2023
Objection resolved — Addressed
09/07/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
07/13/2023
Objection resolved — Addressed
06/28/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/23/2023
Objection raised — Admin
06/23/2023
Objection raised — Admin
06/23/2023
Objection raised — Admin
06/23/2023
Objection raised — Fire_Protection
06/22/2023
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB
B00876709-S2
06/20/2023
Objection raised — Zoning
06/20/2023
Objection raised — Fire_Protection
06/20/2023
Objection raised — Admin
06/20/2023
Objection raised — Other
06/20/2023
Objection raised — Fire_Protection
06/20/2023
Objection raised — Structural
06/20/2023
Objection raised — Fire_Protection
06/20/2023
Objection raised — Zoning
06/20/2023
Objection raised — Inspections
06/20/2023
Objection raised — Scope
06/20/2023
Objection raised — Structural
06/19/2023
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB
B00876709-S1
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBROOKLYN MECH WORKS CORP10/28/2025
DOB NOWGeneral ConstructionPermit IssuedPLATINUM RENOVATIONS 1 LL03/28/2025
DOB NOWConstruction FencePermit IssuedPLATINUM RENOVATIONS 1 LL03/25/2025
DOB NOWPlumbingSigned-offBROOKLYN MECH WORKS CORP10/16/2024
DOB NOWGeneral ConstructionPermit IssuedPLATINUM RENOVATIONS 1 LL03/28/2024
DOB NOWConstruction FencePermit IssuedPLATINUM RENOVATIONS 1 LL03/28/2024
BISOTISSUEDF D M CONST COR¢06/21/1999
1 project · most recent 12/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/03/2025Signed-offBROOKLYN MECH WORKS CORPGas, Water/Sanitary
1 project · most recent 03/26/2025
General Wiring
FiledStatusContractorScope
03/26/2025Permit IssuedGANLY ELECTRICAL CORPGeneral Wiring
1 project · most recent 12/03/2025
Fence
FiledStatusContractorScope
12/03/2025Signed-offBROOKLYN MECH WORKS CORPFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/11/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/11/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
12/01/2025Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
12/01/2025Energy Code Compliance InspectionsNANIK MASSANDprogress
05/17/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
05/17/2023Fenestration areasMOHAMED MAHMOUDenergy_progress
05/17/2023Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
05/17/2023Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
05/17/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
05/17/2023Maintenance informationMOHAMED MAHMOUDenergy_progress
05/17/2023Fenestration air leakageMOHAMED MAHMOUDenergy_progress
05/17/2023MeteringMOHAMED MAHMOUDenergy_progress
05/17/2023Interior lighting powerMOHAMED MAHMOUDenergy_progress
05/17/2023Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
05/17/2023FinalFeng Zhangprogress
05/17/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00876709-P2Request digital key ↗
08/27/2026B00876709-P1Request digital key ↗
08/27/2026B00876709-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00876709-P2Open ↗
08/27/2026B00876709-P1Open ↗
08/27/2026B00876709-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/21/2026B00876709-P2Open ↗
08/25/2026B00876709-I1Open ↗
08/25/2026B00876709-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/21/2026B00876709-P2Open ↗
08/25/2026B00876709-I1Open ↗
08/23/2026B00876709-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00876709-P1Open ↗
08/27/2026B00876709-S2Open ↗
08/27/2026B00876709-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00876709-I1Open ↗