← Back
Two family brick
1505 EAST 31 STREET
BROOKLYN · BIN 3211429
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R3-2Zoning
2,576 sfGross Floor Area
2Units
Two family brick · 2,500 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
Plumbing
Basement1p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CAESAR BUSTAMANTE, AIA512/03/2024
JACOB'S CIVIL CONSULTANT108/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WSCONSULTANT & EXPEDITING SERVICES1003/21/2026
INSHA BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREENER COUNTYGeneral Contractor107/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
Building Lifecycle
All (21)Filed (6)Permit Issued (2)Signed Off (1)Inspection (4)Objection (8)
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2024
Objection resolved — Addressed
12/04/2024
Objection raised — Scope
12/03/2024
Filed — Alteration
Replacement of plumbing/heating equipment in basement, replace existing boiler with Pennco low pressure boiler and install a tankless Navien hot water heater on the 2nd floor apartment. Install a navien combination boiler for 1st floor and basement.
B00967823-P4
10/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2024
Filed — Alteration
Replacement of plumbing/heating equipment in basement, replace existing boiler with Pennco low pressure boiler and install a tankless Navien hot water heater on the 2nd floor apartment. Install a navien combination boiler for 1st floor and basement.
B00967823-P3
08/08/2024
Filed — Alteration
Replacement of plumbing/heating equipment in basement, replace existing boiler with Pennco low pressure boiler and install a tankless Navien hot water heater on the 2nd floor apartment. Install a navien combination boiler for 1st floor and basement.
B00967823-P2
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection resolved — Addressed
05/16/2024
Objection raised — Admin
05/16/2024
Objection raised — Scope
05/09/2024
Filed — Alteration
Replacement of plumbing/heating equipment in basement, replace existing boiler with Pennco low pressure boiler and install a tankless Navien hot water heater on the 2nd floor apartment. Install a navien combination boiler for 1st floor and basement.
B00967823-P1
04/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/22/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/04/2024
Permit issued — Plumbing
B00967823-I1-PL
12/08/2023
Objection resolved — Addressed
12/07/2023
Objection raised — Admin
12/04/2023
Filed — Alteration
Replacement of plumbing/heating equipment in basement, replace existing boiler with Pennco low pressure boiler and install a tankless Navien hot water heater on the 2nd floor apartment. Install a navien combination boiler for 1st floor and basement.
B00967823-I1
11/30/2022
Signed off — Alteration
Filing for minor interior work inside 1st Fl apartment (rear area), work include replace hardwood flooring at (2) bedrooms, painting, and interior finishes only. No change in use, egress or occupancy.
B00793417-I1
09/12/2022
Permit issued — General Construction
B00793417-I1-GC
08/18/2022
Filed — Alteration
Filing for minor interior work inside 1st Fl apartment (rear area), work include replace hardwood flooring at (2) bedrooms, painting, and interior finishes only. No change in use, egress or occupancy.
B00793417-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS01/04/2024
DOB NOWGeneral ConstructionSigned-offGREENER COUNTY.CONSTR INC09/12/2022
1 project · most recent 12/03/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/03/2024Signed-offDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
2 projects · most recent 06/27/2024
General Wiring
FiledStatusContractorScope
06/27/2024Permit IssuedBERGER QUALITY ELEC'L CON—
11/15/2022Permit IssuedAMERICAN POWER ELECT CONSGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/15/2022FinalMUNAF PATELprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B00793417-I1Request digital key ↗
08/26/2026B00967823-I1Request digital key ↗
08/26/2026B00967823-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B00793417-I1Open ↗
08/26/2026B00967823-P3Open ↗
08/26/2026B00967823-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B00793417-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B00967823-P2Open ↗
08/26/2026B00967823-I1Open ↗
08/26/2026B00967823-P3Open ↗
Showing 3 of 5 on file for this type