← Back
Primarily 2 family with 1 store or office
3101 QUENTIN ROAD
BROOKLYN · BIN 3212141
💬 Discuss this project
1926Year Built
2Stories
S2Building Class
R3-2Zoning
3,600 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 3101 QUENTIN RD. LLC · 2,000 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 21p · 1 filing · 6 docs
Floor 11p · 2 filings · 9 docs
Cellar4p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MALE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMP DESIGN & ENGINEERING PLLC205/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING403/21/2026
Building Lifecycle
All (29)Filed (2)Violation (7)Objection (8)Special Inspection (12)
08/06/2024
Violation issued (FDNY_ORDER, closed)
05/09/2023
Filed — Alteration
PLUMBING WORK TYPE ONLY IN CONJUNCTION WITH #B00815700. TO INSTALL NEW KITCHEN FIXTURES AT 1ST FLOOR AND CELLAR.
B00815711-I1
04/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/29/2023
Special inspection requirement — Interior lighting power
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Scope
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Inspections
02/08/2023
Objection resolved — Addressed
02/03/2023
Filed — Alteration
TO CONVERT EXISTING COMMERCIAL SPACE AT 1ST FLOOR INTO EATING AND DRINKING ESTABLISHMENT. NO CHANGE IN BULK, OCCUPANCY, EGRESS OR USE. TO PROPOSED MECHANICAL WORKS OF NEW CHIMNEY, AIR CONDITIONER, KITCHEN HOOD, AND NEW WATER HEATER.
B00815700-I1
02/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
02/03/2023
Special inspection requirement — Maintenance information
02/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
01/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
01/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
01/29/2023
Special inspection requirement — Energy Code Compliance Inspections
01/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
01/19/2023
Special inspection requirement — Final
01/19/2023
Special inspection requirement — Mechanical Systems
11/07/2019
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDCONTROL PLBG & HTG INC04/19/1996
BISOTISSUEDPISTONE CONTRACTOR INC.04/17/1996
1 project · most recent 02/03/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/03/2023——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin AIR HANDLER 24,000 BTU · Ahu ×2
1 project · most recent 05/09/2023
Gas Water/Sanitary
FiledStatusContractorScope
05/09/2023——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/17/2023Structural Stability – Alterations of existing buildings—special
03/29/2023Interior lighting power—energy_progress
02/03/2023HVAC-R and service water piping design and insulation—energy_progress
02/03/2023Maintenance information—energy_progress
02/03/2023HVAC-R and service water heating system controls—energy_progress
01/29/2023Fire-Resistance Rated Construction—progress
01/29/2023Fire-Resistant Penetrations and Joints—special
01/29/2023Tenant Protection Plan Compliance—special
01/29/2023Energy Code Compliance Inspections—progress
01/29/2023HVAC-R and service water heating equipment—energy_progress
01/19/2023Final—progress
01/19/2023Mechanical Systems—special
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00815711-P1Request digital key ↗
08/27/2026B00815711-I1Request digital key ↗
08/15/2026B00815700-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00815700-I1Open ↗
08/13/2026B00815711-I1Open ↗
08/13/2026B00815711-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026B00815700-I1Open ↗
08/13/2026B00815711-P1Open ↗
08/13/2026B00815711-I1Open ↗