← Back
Two stories - detached, small or mid-size
1733 BURNETT STREET
BROOKLYN · BIN 3212558
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-2Zoning
1,620 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,100 sf lot · 0.52 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 1 filing · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction15p · 1 filing · 20 docs
CellarUnder Construction20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J&R CONSTRUCTION SERVICES203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Q & F CONSTRUCTION INC.207/22/2026
MSM ENGINEERING SERVICES, PLLC408/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&R CONSTRUCTION SERVICESGeneral Contractor607/08/2026
AL PLUMBING & CONT. INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449207/22/2026
M. INT'L ENGINEERING PLLC3129308/14/2025
Building Lifecycle
All (69)Filed (6)Permit Issued (6)Violation (7)Inspection (2)Objection (18)Special Inspection (30)
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
07/24/2026
Special inspection requirement — Permanent certificate
MOHAMED MAHMOUD
07/24/2026
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
07/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
07/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/22/2026
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR GAS WORK TYPE, INSTALLATION OF NEW GAS LINE, IN CONJUNCTION TO ALTERATION JOB B00900555-I1
B01393380-P1
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
07/22/2026
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
07/22/2026
Special inspection requirement — Permanent certificate
MOHAMED MAHMOUD
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/09/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/08/2026
Permit issued — Plumbing
B01393380-I1-PL
04/29/2026
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR GAS WORK TYPE, INSTALLATION OF NEW GAS LINE, IN CONJUNCTION TO ALTERATION JOB B00900555-I1
B01393380-I1
03/18/2026
Objection resolved — Addressed
03/18/2026
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
03/18/2026
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
03/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
03/18/2026
Special inspection requirement — Final
Feng Zhang
03/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
03/18/2026
Special inspection requirement — Interior lighting power
NANIK MASSAND
03/18/2026
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
03/18/2026
Special inspection requirement — Metering
NANIK MASSAND
03/18/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
03/18/2026
Special inspection requirement — Fenestration areas
NANIK MASSAND
03/18/2026
Special inspection requirement — Air barrier - visual inspection
NANIK MASSAND
10/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/15/2025
Violation issued (ECB, open)
Construction
09/15/2025
Objection raised — Zoning
09/08/2025
Violation issued (ECB, closed)
Construction
09/08/2025
Violation issued (ECB, closed)
Construction
09/03/2025
Objection resolved — Addressed
08/21/2025
Objection raised — Scope
08/14/2025
Filed — Alteration
EXISTING 2 STORY BUILDING WITH CELLAR, PROPOSED INTERIOR RENOVATIONS AND NEW HORIZONTAL AND VERTICAL EXTENSION AND NEW SHED
B00900555-P1
08/11/2025
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
08/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
03/20/2025
Violation issued (ECB, open)
Unknown
03/20/2025
Violation issued (ECB, open)
Construction
11/08/2024
Permit issued — Construction Fence
B00900555-S1-FN
11/06/2024
Permit issued — General Construction
B00900555-I1-GC
06/21/2024
Permit issued — Plumbing
B00900555-S2-PL
05/14/2024
Permit issued — Construction Fence
B00900555-S1-FN
05/14/2024
Permit issued — General Construction
B00900555-I1-GC
03/25/2024
Filed — Alteration
EXISTING 2 STORY BUILDING WITH CELLAR, PROPOSED INTERIOR RENOVATIONS AND NEW HORIZONTAL AND VERTICAL EXTENSION AND NEW SHED
B00900555-S2
03/22/2024
Filed — Alteration
EXISTING 2 STORY BUILDING WITH CELLAR, PROPOSED INTERIOR RENOVATIONS AND NEW HORIZONTAL AND VERTICAL EXTENSION AND NEW SHED
B00900555-S1
01/12/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/09/2023
Objection resolved — Addressed
10/05/2023
Objection raised — Scope
09/28/2023
Objection resolved — Addressed
09/21/2023
Objection raised — Zoning
09/14/2023
Objection resolved — Addressed
09/14/2023
Objection resolved — Addressed
09/14/2023
Objection resolved — Addressed
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAL PLUMBING & CONT. INC06/08/2026
DOB NOWConstruction FencePermit IssuedJ&R CONSTRUCTION SERVICES11/08/2024
DOB NOWGeneral ConstructionPermit IssuedJ&R CONSTRUCTION SERVICES11/06/2024
DOB NOWPlumbingSigned-offAL PLUMBING & CONT. INC06/21/2024
DOB NOWConstruction FencePermit IssuedJ&R CONSTRUCTION SERVICES05/14/2024
DOB NOWGeneral ConstructionPermit IssuedJ&R CONSTRUCTION SERVICES05/14/2024
BISPLISSUEDA.I.S. PLUMBING & HTG INC04/27/2011
BISOTISSUEDLOUIS PERL CONTRACTING08/12/2004
1 project · most recent 07/22/2026
Gas
FiledStatusContractorScope
07/22/2026Permit IssuedAL PLUMBING & CONT. INCGas
1 project · most recent 08/14/2024
General Wiring
FiledStatusContractorScope
08/14/2024Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/09/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/24/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/24/2026HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
07/24/2026Permanent certificateMOHAMED MAHMOUDenergy_progress
07/24/2026Maintenance informationMOHAMED MAHMOUDenergy_progress
07/24/2026HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
07/24/2026HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
07/24/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/22/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/22/2026HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
07/22/2026Maintenance informationMOHAMED MAHMOUDenergy_progress
07/22/2026Permanent certificateMOHAMED MAHMOUDenergy_progress
07/22/2026HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
07/22/2026HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
07/22/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
03/18/2026Fenestration air leakageNANIK MASSANDenergy_progress
03/18/2026Concrete - Cast-In-PlaceNANIK MASSANDspecial
03/18/2026Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
03/18/2026Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
03/18/2026Energy Code Compliance InspectionsNANIK MASSANDprogress
03/18/2026FinalFeng Zhangprogress
03/18/2026Fire-Resistance Rated ConstructionNANIK MASSANDprogress
03/18/2026Interior lighting powerNANIK MASSANDenergy_progress
03/18/2026Insulation placement and R valuesNANIK MASSANDenergy_progress
03/18/2026MeteringNANIK MASSANDenergy_progress
03/18/2026Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
Latest 25 of 47.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B00900555-P1Request digital key ↗
08/21/2026B00900555-S2Request digital key ↗
08/21/2026B00900555-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026B00900555-I1Open ↗
08/13/2026B00900555-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026B00900555-I1Open ↗
08/13/2026B00900555-P1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00900555-I1Open ↗
09/01/2026B00900555-I1Open ↗
09/01/2026B00900555-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B00900555-I1Open ↗
08/17/2026B01393380-P1Open ↗
08/17/2026B01393380-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00900555-I1Open ↗
09/01/2026B01393380-I1Open ↗
08/27/2026B00900555-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B00900555-I1Open ↗
08/17/2026B01393380-I1Open ↗
08/17/2026B01393380-P1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents6
▸DOB NOWPlot Diagram2
08/21/2026B00900555-I1Open ↗
08/13/2026B00900555-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026B00900555-I1Open ↗
08/13/2026B00900555-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/21/2026B00900555-I1Open ↗
08/13/2026B00900555-P1Open ↗