← Back
Zoned residential, not Manhattan
1035 EAST 52 STREET
BROOKLYN · BIN 3213649
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R4Zoning
0 sfGross Floor Area
0Units
8 Open Violations 3 unresolved · 5 paperwork only ▸FDNY Report ↗
Zoned residential, not Manhattan · 2,150 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/30/2025
Fence
FiledStatusContractorScope
06/30/2025Signed-offGRANITE ENVIRONMENT, LLCFence
Building Lifecycle
All (25)Filed (4)Permit Issued (3)Signed Off (2)Violation (14)Special Inspection (2)
07/09/2025
Signed off — Full Demolition
Full demolition of one story residential building to comply with NYC HPD Emergency Declaration, DEC# 18781
B01179875-I1
07/09/2025
Signed off — Alteration
ERECTING A CMU REINFORCED RETAINING WALL WITH A CONCRETE FOOTING TO HOLD BACKFILL FOR HPD EMERGENCY DEC# 18781 in conjunction with Demolition# B01179875
B01186287-I1
06/30/2025
Filed — Full Demolition
Full demolition of one story residential building to comply with NYC HPD Emergency Declaration, DEC# 18781
B01179875-P1
06/18/2025
Permit issued — General Construction
B01186287-I1-GC
06/12/2025
Filed — Alteration
ERECTING A CMU REINFORCED RETAINING WALL WITH A CONCRETE FOOTING TO HOLD BACKFILL FOR HPD EMERGENCY DEC# 18781 in conjunction with Demolition# B01179875
B01186287-I1
05/29/2025
Special inspection requirement — Demolition
THOMAS WENDEL
05/29/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
THOMAS WENDEL
04/29/2025
Permit issued — Full Demolition
B01179875-I1-FD
04/28/2025
Permit issued — Construction Fence
B01179875-S1-FN
03/27/2025
Filed — Full Demolition
Full demolition of one story residential building to comply with NYC HPD Emergency Declaration, DEC# 18781
B01179875-S1
03/12/2025
Filed — Full Demolition
Full demolition of one story residential building to comply with NYC HPD Emergency Declaration, DEC# 18781
B01179875-I1
11/04/2024
Violation issued (ECB, open)
Construction
11/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2024
Violation issued (ECB, open)
Construction
09/17/2024
Violation issued (ECB, open)
Construction
03/25/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/25/2023
Violation issued (ECB, open)
Construction
11/04/2022
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/29/2020
Violation issued (ECB, open)
Construction
02/29/2020
Violation issued (ECB, closed)
Construction
02/27/2020
Violation issued (FDNY_NOV, closed)
05/31/2016
Violation issued (ECB, closed)
Construction
05/31/2016
Violation issued (ECB, closed)
Construction
01/27/2000
Violation issued (ECB, open)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION DEVELOPMENT1307/08/2026
OWNER OF 1035 EAST 52 ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRANI ENGINEERING AND LAND SURVEYI406/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIRANI ENGINEERING LAND SURVEY203/21/2026
XPEDITE403/21/2026
SADIE SILVER103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRANITE ENVIRONMENT, LLCGeneral Contractor507/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRANI ENGINEERING & LAND679306/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGRANITE ENVIRONMENT, LLC06/18/2025
DOB NOWFull DemolitionSigned-offGRANITE ENVIRONMENT, LLC04/29/2025
DOB NOWConstruction FenceSigned-offGRANITE ENVIRONMENT, LLC04/28/2025
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/29/2025DemolitionTHOMAS WENDELspecial
05/29/2025Structural Stability – Alterations of existing BuildingsTHOMAS WENDELspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026B01179875-S1Request digital key ↗
08/22/2026B01179875-P1Request digital key ↗
08/22/2026B01179875-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026B01179875-I1Open ↗
08/13/2026B01179875-S1Open ↗
08/13/2026B01179875-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B01179875-P1Open ↗
08/29/2026B01179875-P1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026B01179875-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01179875-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01179875-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01179875-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01179875-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01179875-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/22/2026B01179875-I1Open ↗
08/13/2026B01179875-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01179875-I1Open ↗