← Back
Two family frame
1165 EAST 42 STREET
BROOKLYN · BIN 3216001
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R4Zoning
1,728 sfGross Floor Area
2Units
Two family frame · 1,600 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 25p · 1 filing · 3 docs
Floor 15p · 1 filing · 3 docs
Cellar5p · 1 filing · 3 docs
2 jobs · most recent 11/17/2023
General Wiring
FiledStatusContractorScope
11/17/2023CompleteBERGER QUALITY ELEC'L CON—
05/16/2022CompleteRIVIERA ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (61)Filed (3)Permit Issued (4)Signed Off (2)Inspection (8)Objection (36)Special Inspection (8)
10/05/2023
Signed off — Alteration
Filing herewith plans and application to repair fire/water damaged interiors and exteriors; and alterations on cellar, first floor, second floor and third floor as per plans submitted. No change in use, egress or occupancy; all conditions are existing
B00470728-I1
09/25/2023
Signed off — Alteration
B00509100-I1
09/01/2023
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
09/01/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/28/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/12/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/25/2022
Permit issued — General Construction
B00470728-I1-GC
06/28/2022
Permit issued — Sprinklers
B00571886-I1-EW-SP
05/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2022
Permit issued — Plumbing
B00509100-I1-PL
10/28/2021
Permit issued — General Construction
B00470728-I1-GC
10/20/2021
Filed — Alteration
B00571886-I1
10/12/2021
Filed — Alteration
B00509100-I1
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
03/01/2021
Objection raised — Scope
03/01/2021
Objection resolved — Addressed
03/01/2021
Objection raised — Scope
03/01/2021
Objection resolved — Addressed
03/01/2021
Objection raised — Scope
03/01/2021
Objection resolved — Addressed
03/01/2021
Objection raised — Other
03/01/2021
Objection resolved — Addressed
02/19/2021
Filed — Alteration
Filing herewith plans and application to repair fire/water damaged interiors and exteriors; and alterations on cellar, first floor, second floor and third floor as per plans submitted. No change in use, egress or occupancy; all conditions are existing
B00470728-I1
02/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABY TCHILINGUIRIAN
02/15/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
GABY TCHILINGUIRIAN
02/15/2021
Special inspection requirement — Final
GABY TCHILINGUIRIAN
02/15/2021
Special inspection requirement — Energy Code Compliance Inspections
GABY TCHILINGUIRIAN
02/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
GABY TCHILINGUIRIAN
02/15/2021
Special inspection requirement — Insulation placement and R values
GABY TCHILINGUIRIAN
02/15/2021
Special inspection requirement — Interior lighting power
GABY TCHILINGUIRIAN
Latest 60 of 61 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRUDIGM ENGINEERING LLC110/20/2021
GABY TCHILINGUIRIAN R.A.210/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M W EXPEDITING203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
LAW OFFICE OF REBECCA WENNER103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIGLIORE RESTORATION INCGeneral Contractor407/08/2026
DNA PLUMBING CONTR. INCFire Protection107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304110/20/2021
GABY TCHILINGUIRIAN R.A.2540210/12/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC10/25/2022
DOB NOWSprinklersPermit IssuedDNA PLUMBING CONTR. INC06/28/2022
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP05/12/2022
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC10/28/2021
BISOTISSUEDCENTURION SOLAR ENERGY02/21/2024
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/01/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
09/01/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/28/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/15/2021Fire-Resistant Penetrations and JointsGABY TCHILINGUIRIANspecial
02/15/2021Structural Stability – Alterations of existing buildingsGABY TCHILINGUIRIANspecial
02/15/2021FinalGABY TCHILINGUIRIANprogress
02/15/2021Energy Code Compliance InspectionsGABY TCHILINGUIRIANprogress
02/15/2021Fire-Resistance Rated ConstructionGABY TCHILINGUIRIANprogress
02/15/2021Insulation placement and R valuesGABY TCHILINGUIRIANenergy_progress
02/15/2021Interior lighting powerGABY TCHILINGUIRIANenergy_progress
02/15/2021Fenestration and door U-factor and product ratingsGABY TCHILINGUIRIANenergy_progress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/01/2026B00509100-I1Request digital key ↗
09/01/2026B00571886-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026B00470728-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/13/2023340905015Open ↗
▸BISWORK PERMIT APPLICATION1
02/21/2024340905015Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/25/2026B00470728-I1Open ↗
08/25/2026B00470728-I1Open ↗
08/25/2026B00470728-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00509100-I1Open ↗
09/01/2026B00571886-I1Open ↗
08/13/2026B00470728-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00470728-I1Open ↗
08/25/2026B00470728-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/13/2023340905015Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
02/21/2024340905015Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00509100-I1Open ↗
09/01/2026B00571886-I1Open ↗
08/13/2026B00470728-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/13/2023340905015Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/22/2024340905015Open ↗
12/13/2023340905015Open ↗
12/13/2023340905015Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/22/2024340905015Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/13/2023340905015Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
05/05/2024340905015Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00470728-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/22/2024340905015Open ↗
04/22/2024340905015Open ↗
12/13/2023340905015Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/06/2024340905015Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/22/2024340905015Open ↗
12/13/2023340905015Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
02/20/2024340905015Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/13/2023340905015Open ↗
▸Other Documents2
▸BISTax Abatement Miscellaneous1
04/23/2024340905015Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/13/2023340905015Open ↗