1930Year Built
2Stories
B3Building Class
R5BZoning
—Gross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Two family converted from one family · 0.9 FAR built · Flood zone X500
Locations of Work
ArchitectureGeneral
Roof2p · 2 filings · 9 docs
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 6 docs
Basement1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KCE CONSULTING ENGINEERING PLLC212/14/2023
KMP DESIGN & ENGINEERING PLLC105/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING403/21/2026
KP CONSULTING ENGINEER203/21/2026
Building Lifecycle
All (53)Filed (3)Violation (4)Objection (33)Special Inspection (13)
12/20/2023
Objection resolved — Addressed
12/19/2023
Objection raised — Scope
12/14/2023
Filed — Alteration
RENOVATE EXISTING 2-FAMILY DWELLING. NO CHANGE IN OCCUPANCY, EGRESS, OR USE.
B00951435-S1
12/13/2023
Objection resolved — Addressed
12/13/2023
Objection resolved — Addressed
12/13/2023
Objection resolved — Addressed
11/13/2023
Objection raised — Structural
11/13/2023
Objection raised — Other
11/13/2023
Objection raised — Scope
11/02/2023
Filed — Alteration
RENOVATE EXISTING 2-FAMILY DWELLING. NO CHANGE IN OCCUPANCY, EGRESS, OR USE.
B00951435-I1
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/20/2023
Special inspection requirement — Post-installed Anchors
10/20/2023
Special inspection requirement — Final
02/16/2023
Objection raised — Other
02/11/2023
Objection resolved — Resolved
02/11/2023
Objection resolved — Resolved
02/11/2023
Objection resolved — Addressed
12/02/2022
Objection raised — Scope
11/16/2022
Objection resolved — Resolved
11/15/2022
Objection resolved — Resolved
11/15/2022
Objection resolved — Resolved
11/15/2022
Objection resolved — Resolved
09/09/2022
Objection raised — Scope
08/26/2022
Objection resolved — Addressed
08/26/2022
Objection resolved — Addressed
08/26/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Other
07/01/2022
Objection raised — Structural
07/01/2022
Objection raised — Fire_Protection
07/01/2022
Objection raised — Zoning
07/01/2022
Objection raised — Other
07/01/2022
Objection raised — Fire_Protection
07/01/2022
Objection raised — Scope
07/01/2022
Objection raised — Scope
07/01/2022
Objection raised — Zoning
06/06/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Scope
05/11/2022
Objection raised — Scope
05/05/2022
Filed — Alteration
RENOVATION OF 2ND FLOOR APARTMENT, NO WORK ON BASEMENT AND 1ST FLOOR.
B00697038-I1
04/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
04/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
04/08/2022
Special inspection requirement — Air barrier - visual inspection
04/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2022
Special inspection requirement — Insulation placement and R values
04/08/2022
Special inspection requirement — Fenestration areas
04/08/2022
Special inspection requirement — Interior lighting power
04/08/2022
Special inspection requirement — Fenestration air leakage
04/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/08/2022
Special inspection requirement — Energy Code Compliance Inspections
07/15/2012
Violation issued (HPD, open)
B
07/15/2012
Violation issued (HPD, open)
B
07/15/2012
Violation issued (HPD, open)
B
07/15/2012
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDW G PLBG & HTG01/19/2007
1 project · most recent 12/14/2023
Water/Sanitary
FiledStatusContractorScope
12/14/2023——Water/Sanitary
1 project · most recent 09/11/2025
FiledStatusContractorScope
09/11/2025Permit IssuedCLAIRMONT ELEC'L CONTR'G2 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/20/2023Fire-Resistant Penetrations and Joints—special
10/20/2023Post-installed Anchors—special
10/20/2023Final—progress
04/08/2022Fire-Resistance Rated Construction—progress
04/08/2022Fenestration and door U-factor and product ratings—energy_progress
04/08/2022Air barrier - visual inspection—energy_progress
04/08/2022Fire-Resistant Penetrations and Joints—special
04/08/2022Insulation placement and R values—energy_progress
04/08/2022Fenestration areas—energy_progress
04/08/2022Interior lighting power—energy_progress
04/08/2022Fenestration air leakage—energy_progress
04/08/2022Structural Stability – Alterations of existing buildings—special
04/08/2022Energy Code Compliance Inspections—progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00951435-I1Request digital key ↗
08/26/2026B00951435-S1Request digital key ↗
08/14/2026B00697038-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00951435-S1Open ↗
08/13/2026B00951435-I1Open ↗
08/13/2026B00697038-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00951435-S1Open ↗
08/13/2026B00951435-I1Open ↗
08/13/2026B00697038-I1Open ↗