← Back
Miscellaneous two family
913 EAST 83 STREET
BROOKLYN · BIN 3225053
💬 Discuss this project
1970Year Built
3Stories
B9Building Class
R5BZoning
4,220 sfGross Floor Area
2Units
21 Open Violations 18 unresolved · 3 paperwork only ▸FDNY Report ↗
Miscellaneous two family · 2,867 sf lot · 1.47 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DINGS ENGINEERING P.C.209/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DINGS ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & M PIPING AND HEATINGPlumbing207/08/2026
FIRST WORLD DEVELOPMENTGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DINGS ENGINEERING PC2051209/24/2022
Building Lifecycle
All (67)Filed (2)Permit Issued (3)Signed Off (2)Violation (35)Inspection (5)Objection (16)Special Inspection (4)
05/23/2025
Signed off — Alteration
REMOVE NO-BEARING PARTITIONS TO REMOVE A BEDROOM, CREATE NO-BEARING PARTITIONS FOR A HALF BATHROOM AT CELLAR. REMOVE A KITCHEN, LEGAIZE A FULL BATHROOM AND FULL PARTITIONS FOR A STORAGE ROOM AT BASEMENT. RESTORE BUILDING TO LEGAL 2 FAMILY DWELLING USE.
B00780140-I1
05/22/2025
Signed off — Alteration
REMOVE NO-BEARING PARTITIONS TO REMOVE A BEDROOM, CREATE NO-BEARING PARTITIONS FOR A HALF BATHROOM AT CELLAR. REMOVE A KITCHEN, LEGAIZE A FULL BATHROOM AND FULL PARTITIONS FOR A STORAGE ROOM AT BASEMENT. RESTORE BUILDING TO LEGAL 2 FAMILY DWELLING USE.
B00780140-S1
03/31/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/10/2025
Permit issued — General Construction
B00780140-I1-GC
08/13/2024
Permit issued — Plumbing
B00780140-S1-PL
08/13/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/10/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/05/2023
Permit issued — Plumbing
B00780140-S1-PL
09/24/2022
Filed — Alteration
REMOVE NO-BEARING PARTITIONS TO REMOVE A BEDROOM, CREATE NO-BEARING PARTITIONS FOR A HALF BATHROOM AT CELLAR. REMOVE A KITCHEN, LEGAIZE A FULL BATHROOM AND FULL PARTITIONS FOR A STORAGE ROOM AT BASEMENT. RESTORE BUILDING TO LEGAL 2 FAMILY DWELLING USE.
B00780140-S1
08/01/2022
Objection raised — Other
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Scope
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Inspections
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Energy
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Other
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Fire_Protection
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Structural
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection raised — Other
08/01/2022
Objection resolved — Addressed
07/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
07/23/2022
Filed — Alteration
REMOVE NO-BEARING PARTITIONS TO REMOVE A BEDROOM, CREATE NO-BEARING PARTITIONS FOR A HALF BATHROOM AT CELLAR. REMOVE A KITCHEN, LEGAIZE A FULL BATHROOM AND FULL PARTITIONS FOR A STORAGE ROOM AT BASEMENT. RESTORE BUILDING TO LEGAL 2 FAMILY DWELLING USE.
B00780140-I1
07/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
07/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yanqi Ding
07/22/2022
Special inspection requirement — Final
Yanqi Ding
11/09/2021
Violation issued (ECB, closed)
Construction
10/27/2021
Violation issued (ECB, closed)
Construction
09/20/2021
Violation issued (ECB, closed)
Construction
07/07/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2021
Violation issued (ECB, closed)
Construction
05/26/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/15/2021
Violation issued (ECB, closed)
Construction
04/15/2021
Violation issued (ECB, open)
Construction
04/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2021
Violation issued (ECB, open)
Construction
02/24/2021
Violation issued (ECB, closed)
Construction
01/22/2021
Violation issued (ECB, open)
Unknown
01/22/2021
Violation issued (ECB, closed)
Construction
03/08/2018
Violation issued (HPD, open)
C
02/20/2018
Violation issued (HPD, closed)
B
02/19/2016
Violation issued (HPD, closed)
B
02/19/2016
Violation issued (HPD, closed)
B
02/19/2016
Violation issued (HPD, closed)
B
02/19/2016
Violation issued (HPD, closed)
B
08/03/2015
Violation issued (HPD, open)
B
08/03/2015
Violation issued (HPD, open)
B
08/03/2015
Violation issued (HPD, open)
B
04/08/2014
Violation issued (HPD, open)
C
04/08/2014
Violation issued (HPD, open)
B
04/08/2014
Violation issued (HPD, open)
C
10/19/2008
Violation issued (HPD, open)
B
10/19/2008
Violation issued (HPD, open)
C
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFIRST WORLD DEVELOPMENT02/10/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING08/13/2024
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING04/05/2023
1 project · most recent 01/23/2024
General Wiring
FiledStatusContractorScope
01/23/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/13/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/10/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/31/2022Fire-Resistant Penetrations and JointsYanqi Dingspecial
07/22/2022Fire-Resistant Penetrations and JointsYanqi Dingspecial
07/22/2022Structural Stability – Alterations of existing buildingsYanqi Dingspecial
07/22/2022FinalYanqi Dingprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B00780140-S1Request digital key ↗
08/14/2026B00780140-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B00780140-I1Open ↗
08/25/2026B00780140-I1Open ↗
08/22/2026B00780140-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026B00780140-S1Open ↗
08/28/2026B00780140-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00780140-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B00780140-S1Open ↗
08/14/2026B00780140-I1Open ↗