Two family frame
9 PAERDEGAT 10 STREET
BROOKLYN · BIN 3226556
💬 Discuss this project
1965Year Built
2Stories
B2Building Class
R5Zoning
2,980 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 2,200 sf lot · 1.35 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 25p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Basement10p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2017$665K—— → —$223/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RICHARD JIMENEZ ARCHITECTURE1106/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor507/08/2026
CITY BUILDING CONSULTANTSGeneral Contractor303/21/2026
CJ HEATING & MECHANICAL CPlumbing207/08/2026
WATTS ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCALHEK PC3340406/25/2026
OMFPE CONSULTING PLLC8018406/25/2026
JOSE L. PENA, P.E5969310/16/2025
Building Lifecycle
All (104)Filed (11)Permit Issued (6)Signed Off (4)Violation (1)Inspection (13)Objection (46)Special Inspection (23)
06/25/2026
Filed — Alteration CO
Bas Replace 1 sink, 1 toilet, 1 lav in Exist Roughing , Rep Bath with Shower in exist roughing, Relocate 1 WM, Prop 1 Floor drain. At 1st and 2nd Floors: Replace Gas stove, Residential sink, Lav & Toilet in Exist Roughing , Rep Bath with shower prop WM
B01075487-P4
05/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/05/2026
Filed — Alteration CO
Bas Replace 1 sink, 1 toilet, 1 lav in Exist Roughing , Rep Bath with Shower in exist roughing, Relocate 1 WM, Prop 1 Floor drain. At 1st and 2nd Floors: Replace Gas stove, Residential sink, Lav & Toilet in Exist Roughing , Rep Bath with shower prop WM
B01075487-P3
05/01/2026
Special inspection requirement — Maintenance information
Oswin Fairweather
05/01/2026
Special inspection requirement — Interior lighting power
Oswin Fairweather
05/01/2026
Special inspection requirement — Fenestration air leakage
Oswin Fairweather
05/01/2026
Special inspection requirement — Metering
Oswin Fairweather
05/01/2026
Special inspection requirement — Permanent certificate
Oswin Fairweather
05/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Oswin Fairweather
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Oswin Fairweather
05/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
RAYMOND CALAMARI
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Oswin Fairweather
05/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Oswin Fairweather
05/01/2026
Special inspection requirement — Insulation placement and R values
Oswin Fairweather
05/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
Oswin Fairweather
05/01/2026
Special inspection requirement — Air barrier - visual inspection
Oswin Fairweather
05/01/2026
Special inspection requirement — Fenestration areas
Oswin Fairweather
04/17/2026
Signed off — Alteration
Partial Demolition
B01047717-I1
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2026
Signed off — Alteration CO
Bas Replace 1 sink, 1 toilet, 1 lav in Exist Roughing , Rep Bath with Shower in exist roughing, Relocate 1 WM, Prop 1 Floor drain. At 1st and 2nd Floors: Replace Gas stove, Residential sink, Lav & Toilet in Exist Roughing , Rep Bath with shower prop WM
B01075487-S1
12/16/2025
Filed — Alteration CO
Bas Replace 1 sink, 1 toilet, 1 lav in Exist Roughing , Rep Bath with Shower in exist roughing, Relocate 1 WM, Prop 1 Floor drain. At 1st and 2nd Floors: Replace Gas stove, Residential sink, Lav & Toilet in Exist Roughing , Rep Bath with shower prop WM
B01075487-P2
11/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2025
Special inspection requirement — Mechanical Systems
Jose Pena
10/17/2025
Special inspection requirement — Final
RICHARD JIMENEZ
10/16/2025
Filed — Alteration
Partial Demolition
B01047717-P2
10/01/2025
Filed — Alteration CO
Bas Replace 1 sink, 1 toilet, 1 lav in Exist Roughing , Rep Bath with Shower in exist roughing, Relocate 1 WM, Prop 1 Floor drain. At 1st and 2nd Floors: Replace Gas stove, Residential sink, Lav & Toilet in Exist Roughing , Rep Bath with shower prop WM
B01075487-P1
09/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Oswin Fairweather
09/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Oswin Fairweather
09/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Oswin Fairweather
09/26/2025
Special inspection requirement — Maintenance information
Oswin Fairweather
03/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/28/2025
Permit issued — Plumbing
B01075487-S1-PL
02/03/2025
Objection resolved — Addressed
01/10/2025
Permit issued — General Construction
B01075487-I1-GC
12/26/2024
Permit issued — General Construction
B01047717-I1-GC-CX
12/17/2024
Objection raised — Other
12/17/2024
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
12/09/2024
Objection raised — Scope
12/04/2024
Filed — Alteration
Partial Demolition
B01047717-P1
12/02/2024
Special inspection requirement — Mechanical Systems
Jose Pena
12/02/2024
Special inspection requirement — Final
RICHARD JIMENEZ
11/20/2024
Objection raised — Inspections
11/20/2024
Objection resolved — Addressed
11/08/2024
Objection resolved — Addressed
10/11/2024
Objection raised — Other
10/06/2024
Objection resolved — Addressed
10/06/2024
Objection resolved — Addressed
10/06/2024
Objection resolved — Addressed
10/01/2024
Objection raised — Structural
10/01/2024
Objection raised — Other
09/24/2024
Objection resolved — Addressed
09/24/2024
Objection resolved — Addressed
09/13/2024
Objection raised — Fire_Protection
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C02/28/2025
DOB NOWGeneral ConstructionPermit IssuedMAMC CONSULTING REPS LLC01/10/2025
DOB NOWGeneral ConstructionSigned-offMAMC CONSULTING REPS LLC12/26/2024
DOB NOWGeneral ConstructionSigned-offMAMC CONSULTING REPS LLC05/14/2024
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C03/01/2023
DOB NOWMechanical SystemsSigned-offCITY BUILDING CONSULTANTS02/10/2023
1 project · most recent 06/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/25/2026Signed-offJL PLUMBING, LLCGas, Water/Sanitary
3 projects · most recent 08/03/2026
General Wiring
FiledStatusContractorScope
08/03/2026CompleteJAMPROBE ELECTRIC LLCGeneral Wiring
08/29/2025CompleteWATTS ELECTRICAL CORPGeneral Wiring
08/04/2022Permit IssuedBERNARDI ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/05/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/01/2026Maintenance informationOswin Fairweatherenergy_progress
05/01/2026Interior lighting powerOswin Fairweatherenergy_progress
05/01/2026Fenestration air leakageOswin Fairweatherenergy_progress
05/01/2026MeteringOswin Fairweatherenergy_progress
05/01/2026Permanent certificateOswin Fairweatherenergy_progress
05/01/2026Fenestration and door U-factor and product ratingsOswin Fairweatherenergy_progress
05/01/2026Structural Stability – Alterations of existing buildingsOswin Fairweatherspecial
05/01/2026Tenant Protection Plan ComplianceRAYMOND CALAMARIspecial
05/01/2026Energy Code Compliance InspectionsOswin Fairweatherprogress
05/01/2026Fire-Resistance Rated ConstructionOswin Fairweatherprogress
05/01/2026Insulation placement and R valuesOswin Fairweatherenergy_progress
05/01/2026Electric vehicle service equipment requirementsOswin Fairweatherenergy_progress
05/01/2026Air barrier - visual inspectionOswin Fairweatherenergy_progress
05/01/2026Fenestration areasOswin Fairweatherenergy_progress
10/17/2025Mechanical SystemsJose Penaspecial
10/17/2025FinalRICHARD JIMENEZprogress
09/26/2025HVAC-R and service water piping design and insulationOswin Fairweatherenergy_progress
09/26/2025HVAC-R and service water heating equipmentOswin Fairweatherenergy_progress
09/26/2025HVAC-R and service water heating system controlsOswin Fairweatherenergy_progress
09/26/2025Maintenance informationOswin Fairweatherenergy_progress
12/02/2024Mechanical SystemsJose Penaspecial
12/02/2024FinalRICHARD JIMENEZprogress
11/29/2022Mechanical SystemsRAYMOND CALAMARIspecial
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B08039650-I1Request digital key ↗
08/20/2026B01047717-P2Request digital key ↗
08/20/2026B01047717-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01075487-P2Open ↗
08/13/2026B01075487-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature18
08/28/2026B01075487-P3Open ↗
08/28/2026B01075487-P3Open ↗
08/28/2026B01075487-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B08039767-I1Open ↗
08/20/2026B01047717-P2Open ↗
08/20/2026B01047717-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B01075487-P3Open ↗
08/28/2026B01075487-P3Open ↗
08/25/2026B01047717-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/19/2026B01075487-P4Open ↗
08/19/2026B01075487-P3Open ↗
08/13/2026B01075487-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/20/2026B01047717-P2Open ↗
08/20/2026B01047717-P1Open ↗
08/20/2026B01047717-I1Open ↗
Showing 3 of 11 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/19/2026B01075487-P4Open ↗
08/19/2026B01075487-I1Open ↗
08/19/2026B01075487-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B01075487-I1Open ↗