1965Year Built
3Stories
B9Building Class
R5Zoning
2,450 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous two family · 1,983 sf lot · 1.24 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 11p · 1 filing · 11 docs
BasementUnder Construction4p · 2 filings · 20 docs
Sub-BasementUnder Construction2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROWAN ORLANDO GEORGES ARCHITECT504/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC403/21/2026
LLOYD NOEL BUILDING CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRO TOUCH INTERIORS LLCGeneral Contractor107/08/2026
ROY B PLUMBING & HEATINGPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018201/30/2025
Building Lifecycle
All (25)Filed (5)Permit Issued (2)Signed Off (1)Violation (3)Inspection (2)Objection (4)Special Inspection (8)
06/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Filed — Alteration
Restore existing garage as per C of O 196870. Remove illegal plumbing fixtures with no change of use, egress, or occupancy under this application.
B01000465-P3
04/10/2026
Permit issued — Plumbing
B01000465-I1-PL
12/11/2025
Violation issued (ECB, closed)
Construction
04/16/2025
Signed off — Alteration
Restore existing garage as per C of O 196870. remove illegal partitions, and install non-load bearing partitions with doors. No change of use, egress, or occupancy under this application. ECB VIOLATION # 039102323P
B01000250-I1
01/30/2025
Filed — Alteration
Restore existing garage as per C of O 196870. remove illegal partitions, and install non-load bearing partitions with doors. No change of use, egress, or occupancy under this application. ECB VIOLATION # 039102323P
B01000250-P1
01/30/2025
Filed — Alteration
Restore existing garage as per C of O 196870. Remove illegal plumbing fixtures with no change of use, egress, or occupancy under this application.
B01000465-P1
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
10/29/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
10/29/2024
Special inspection requirement — Final
ROWAN GEORGES
10/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
ROWAN GEORGES
10/29/2024
Special inspection requirement — Fenestration air leakage
William Ryan
10/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
William Ryan
10/29/2024
Special inspection requirement — Permanent certificate
William Ryan
10/29/2024
Special inspection requirement — Fenestration areas
William Ryan
05/29/2024
Permit issued — General Construction
B01000250-I1-GC
02/15/2024
Objection resolved — Addressed
02/15/2024
Objection resolved — Addressed
02/09/2024
Objection raised — Admin
02/09/2024
Objection raised — Scope
02/06/2024
Filed — Alteration
Restore existing garage as per C of O 196870. remove illegal partitions, and install non-load bearing partitions with doors. No change of use, egress, or occupancy under this application. ECB VIOLATION # 039102323P
B01000250-I1
02/06/2024
Filed — Alteration
Restore existing garage as per C of O 196870. Remove illegal plumbing fixtures with no change of use, egress, or occupancy under this application.
B01000465-I1
12/28/2023
Violation issued (ECB, closed)
Construction
12/18/2022
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedROY B PLUMBING & HEATING04/10/2026
DOB NOWGeneral ConstructionSigned-offPRO TOUCH INTERIORS LLC05/29/2024
1 project · most recent 04/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/30/2026Permit IssuedROY B PLUMBING & HEATINGGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/29/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/29/2024Energy Code Compliance InspectionsWilliam Ryanprogress
10/29/2024FinalROWAN GEORGESprogress
10/29/2024Fire-Resistance Rated ConstructionROWAN GEORGESprogress
10/29/2024Fenestration air leakageWilliam Ryanenergy_progress
10/29/2024Fenestration and door U-factor and product ratingsWilliam Ryanenergy_progress
10/29/2024Permanent certificateWilliam Ryanenergy_progress
10/29/2024Fenestration areasWilliam Ryanenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B01000250-P1Request digital key ↗
08/26/2026B01000250-I1Request digital key ↗
08/17/2026B01000465-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B01000250-I1Open ↗
08/26/2026B01000250-P1Open ↗
08/17/2026B01000465-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026B01000250-P1Open ↗
08/26/2026B01000250-P1Open ↗
08/26/2026B01000250-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01000250-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B01000250-P1Open ↗
08/26/2026B01000250-I1Open ↗
08/17/2026B01000465-P3Open ↗
Showing 3 of 5 on file for this type