← Back
General warehouse
789 EAST 91 STREET
BROOKLYN · BIN 3228472
💬 Discuss this project
1965Year Built
1Stories
E1Building Class
M1-1Zoning
44,000 sfGross Floor Area
5Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
General warehouse · Owner of record: CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. · 46,000 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof5p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Mezzanine2p · 1 filing · 20 docs
2 jobs · most recent 08/28/2024
FiledStatusContractorScope
08/28/2024CompleteNASH ELECTRIC SERVICES IN—
12/03/2020CompleteANTONIO CERIELLO ELEC INC4 meters, 1 new_meters
Building Lifecycle
All (28)Filed (6)Permit Issued (5)Signed Off (3)Violation (8)Objection (2)Special Inspection (4)
05/19/2025
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01020963-I1
02/19/2025
Signed off — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-I1
12/31/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01099927-I1
11/08/2024
Filed — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-P2
11/06/2024
Special inspection requirement — Demolition
GEORGE GHEBRYAL
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE GHEBRYAL
10/04/2024
Objection resolved — Addressed
10/02/2024
Objection raised — Admin
10/01/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01099927-P1
09/18/2024
Filed — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-P1
09/06/2024
Special inspection requirement — Demolition
GEORGE GHEBRYAL
09/06/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE GHEBRYAL
08/22/2024
Permit issued — Sidewalk Shed
B01099927-I1-SH
08/21/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01099927-I1
08/02/2024
Permit issued — Construction Fence
B01020963-I1-FN
07/31/2024
Permit issued — Full Demolition
B00994544-I1-FD
06/03/2024
Permit issued — Construction Fence
B01020963-I1-FN
04/12/2024
Filed — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01020963-I1
04/12/2024
Permit issued — Construction Fence
B01020963-I1-FN
03/26/2024
Filed — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-I1
02/22/2022
Violation issued (FDNY_NOV, closed)
08/25/2021
Violation issued (FDNY_NOV, closed)
08/25/2021
Violation issued (FDNY_NOV, closed)
02/23/2021
Violation issued (FDNY_NOV, closed)
11/22/2019
Violation issued (FDNY_NOV, closed)
08/21/2000
Violation issued (FDNY_NOV, closed)
01/27/1994
Violation issued (FDNY_NOV, closed)
11/17/1988
Violation issued (FDNY_NOV, closed)
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED EDISON COMPANY807/08/2026
CONSOLIDATED EDISON COMPANY OF NY503/22/2026
DINO SONS REALTY603/21/2026
GSPP203/21/2026
TROY REALTY COMPANY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITER303/21/2026
A1 EXPEDITING SERVICE203/21/2026
GEIGER E A GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BREEZE NATIONAL INCGeneral Contractor407/08/2026
CRANES EXPRESS INCElectrical103/21/2026
R.J.B. RENOVATIONS INCElectrical103/21/2026
RUTYNA, JOSEPHElectrical103/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106311/08/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/22/2024
DOB NOWConstruction FenceSigned-offBREEZE NATIONAL INC08/02/2024
DOB NOWFull DemolitionSigned-offBREEZE NATIONAL INC07/31/2024
DOB NOWConstruction FenceSigned-offBREEZE NATIONAL INC06/03/2024
DOB NOWConstruction FenceSigned-offBREEZE NATIONAL INC04/12/2024
BISOTISSUEDSOLAR ENERGY SYSTEMS INC11/27/2020
BISSPISSUEDALLSTATE SPRINKLER CORP.02/07/2006
BISSPISSUEDALLSTATE SPRINKLER CORP02/22/2001
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/06/2024DemolitionGEORGE GHEBRYALspecial
11/06/2024Structural Stability – Alterations of existing BuildingsGEORGE GHEBRYALspecial
09/06/2024DemolitionGEORGE GHEBRYALspecial
09/06/2024Structural Stability – Alterations of existing BuildingsGEORGE GHEBRYALspecial
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B00994544-I1Request digital key ↗
08/25/2026B00994544-P2Request digital key ↗
08/25/2026B01020963-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/22/2020340766763Open ↗
▸BISWORK PERMIT APPLICATION1
11/27/2020340766763Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B00994544-I1Open ↗
08/25/2026B00994544-P1Open ↗
08/24/2026B01099927-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026B00994544-P1Open ↗
09/27/2026B00994544-P1Open ↗
08/28/2026B00994544-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2020340766763Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026B00994544-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00994544-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00994544-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00994544-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/22/2020340766763Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/22/2020340766763Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00994544-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00994544-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/21/2021340766763Open ↗
11/23/2020340766763Open ↗
11/23/2020340766763Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/21/2021340766763Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/22/2020340766763Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
07/21/2021340766763Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/21/2021340766763Open ↗
09/24/2020340766763Open ↗
09/24/2020340766763Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/21/2021340766763Open ↗
11/23/2020340766763Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/21/2021340766763Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/22/2020340766763Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/21/2021340766763Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2020340766763Open ↗
▸BISADDITIONAL INFORMATION1
11/23/2020340766763Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/25/2026B00994544-I1Open ↗
08/15/2026B00994544-P1Open ↗
08/13/2026B00994544-P2Open ↗
▸DOB NOWStructure Photographs3
08/25/2026B00994544-I1Open ↗
08/15/2026B00994544-P1Open ↗
08/13/2026B00994544-P2Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00994544-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00994544-I1Open ↗