← Back
Primarily 2 family with 1 store or office
1018 EAST 92 STREET
BROOKLYN · BIN 3228795
💬 Discuss this project
1920Year Built
2Stories
S2Building Class
R4-1Zoning
2,666 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: STOIC PROPERTIES LLC · 2,152 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 14 docs
Floor 1
1 job · most recent 08/07/2025
General Wiring
FiledStatusContractorScope
08/07/2025CompleteKET ELECTRIC LLCGeneral Wiring
Building Lifecycle
All (33)Filed (4)Permit Issued (2)Signed Off (2)Violation (19)Inspection (4)Special Inspection (2)
12/04/2025
Signed off — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATIONS OF A MIX-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160152-I1
12/04/2025
Signed off — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATIONS OF A MIX-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160152-S1
11/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/25/2025
Violation issued (HPD, open)
I
11/10/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATIONS OF A MIX-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160152-P3
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BORIS BALKHIYEV
09/12/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/17/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATIONS OF A MIX-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160152-P2
08/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BORIS BALKHIYEV
07/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2025
Permit issued — Plumbing
B01160152-S1-PL
05/22/2025
Permit issued — General Construction
B01160152-I1-GC
04/16/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATIONS OF A MIX-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160152-S1
02/03/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR INTERIOR RENOVATIONS OF A MIX-USE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160152-I1
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
03/16/2022
Violation issued (HPD, open)
I
04/21/2021
Violation issued (HPD, open)
I
03/08/2019
Violation issued (ECB, closed)
Construction
01/10/2019
Violation issued (ECB, closed)
Construction
12/19/2016
Violation issued (HPD, closed)
I
12/16/2016
Violation issued (HPD, closed)
C
12/16/2016
Violation issued (HPD, closed)
C
12/16/2016
Violation issued (HPD, open)
C
12/16/2016
Violation issued (HPD, open)
B
12/14/2016
Violation issued (HPD, open)
B
12/14/2016
Violation issued (HPD, open)
B
12/14/2016
Violation issued (HPD, closed)
C
12/14/2016
Violation issued (HPD, open)
C
12/14/2016
Violation issued (HPD, open)
B
12/14/2016
Violation issued (HPD, open)
B
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1018 E 93 GROUP CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BORIS BALKHIYEV, PE411/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN COMMUNICATION MK403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KET ELECTRIC LLCElectrical103/22/2026
CHATEL CONSTRUCTION CORPGeneral Contractor104/09/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MB INSPECTIONS, CORP.8703411/10/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC07/18/2025
DOB NOWGeneral ConstructionSigned-offCHATEL CONSTRUCTION CORP05/22/2025
BISPLISSUEDCAPE PLUMBING INC08/06/2001
BIS—ISSUEDLEROY G. SHAW ASSOCIATES07/09/2001
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/04/2025Fire-Resistant Penetrations and JointsBORIS BALKHIYEVspecial
08/11/2025Fire-Resistant Penetrations and JointsBORIS BALKHIYEVspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01160152-I1Request digital key ↗
08/19/2026B01160152-P3Request digital key ↗
08/19/2026B01160152-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01160152-I1Open ↗
08/19/2026B01160152-P2Open ↗
08/13/2026B01160152-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01160152-P2Open ↗
08/22/2026B01160152-P3Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01160152-I1Open ↗
08/19/2026B01160152-P2Open ↗
08/13/2026B01160152-S1Open ↗
Showing 3 of 4 on file for this type