← Back
Two family brick
1123 EAST 100 STREET
BROOKLYN · BIN 3232038
💬 Discuss this project
1955Year Built
1Stories
B1Building Class
R4Zoning
2,120 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 2,950 sf lot · 0.72 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 1 filing · 12 docs
Floor 1Under Construction4p · 1 filing · 12 docs
CellarUnder Construction6p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ECC INC305/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
EDISON CONSTRUCTION CORPGeneral Contractor107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENVIRONMENTAL CODE CONSUL5516305/21/2026
Building Lifecycle
All (12)Filed (3)Permit Issued (2)Violation (1)Inspection (2)Special Inspection (4)
07/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/26/2026
Permit issued — Plumbing
B01355562-S1-PL
05/26/2026
Permit issued — General Construction
B01355562-I1-GC
05/21/2026
Filed — Alteration
REMOVAL & REPLACEMENT OF PLUMBING FIXTURES AT THE 1ST AND 2ND FLOOR BATHROOMS, ROUGH-IN PLUMBING TO REMAIN. THERE IS N CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
B01355562-P1
05/19/2026
Filed — Alteration
REMOVAL & REPLACEMENT OF PLUMBING FIXTURES AT THE 1ST AND 2ND FLOOR BATHROOMS, ROUGH-IN PLUMBING TO REMAIN. THERE IS N CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
B01355562-S1
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Karpen
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Karpen
04/30/2026
Special inspection requirement — Final
Daniel Karpen
04/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Karpen
02/12/2026
Filed — Alteration
REMOVAL & REPLACEMENT OF PLUMBING FIXTURES AT THE 1ST AND 2ND FLOOR BATHROOMS, ROUGH-IN PLUMBING TO REMAIN. THERE IS N CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
B01355562-I1
01/04/2024
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP05/26/2026
DOB NOWGeneral ConstructionPermit IssuedEDISON CONSTRUCTION CORP05/26/2026
1 project · most recent 05/21/2026
Water/Sanitary
FiledStatusContractorScope
05/21/2026Signed-offSIGNORE & SONS PLBG CORPWater/Sanitary
2 projects · most recent 03/24/2026
General Wiring
FiledStatusContractorScope
03/24/2026Permit IssuedEPC ELECTRICAL CORP.General Wiring
09/19/2025Permit IssuedALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/04/2026Fire-Resistant Penetrations and JointsDaniel Karpenspecial
05/04/2026Fire-Resistant Penetrations and JointsDaniel Karpenspecial
04/30/2026FinalDaniel Karpenprogress
04/30/2026Fire-Resistance Rated ConstructionDaniel Karpenprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026B01355562-P1Request digital key ↗
08/16/2026B01355562-S1Request digital key ↗
08/16/2026B01355562-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01355562-I1Open ↗
08/16/2026B01355562-S1Open ↗
08/16/2026B01355562-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01355562-P1Open ↗
08/27/2026B01355562-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B01355562-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026B01355562-I1Open ↗
08/16/2026B01355562-P1Open ↗
08/16/2026B01355562-S1Open ↗